Ameresco Vasco Road
4001 North Vasco Road, Livermore, CA 95336Plant Summary Information
Ameresco Vasco Road is ranked #15 out of 38 landfill gas power plants in California in terms of total annual net electricity generation.
Ameresco Vasco Road is comprised of 2 generators and generated 8.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ameresco Vasco Road |
---|---|
Utility Name | Ameresco Vasco Road, LLC |
Location | Alameda County, CA |
Initial Operation Date | March 2013 |
Last Update | Dec 2023 |
Annual Generation | 31.5 GWh |
Annual Consumption | 344.7 k MMBtu |
Ranked #4,483 out of 11,835 Power Plants Nationwide | |
Ranked #82 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #605 out of 1,569 California Power Plants | |
Ranked #15 out of 38 California Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Ameresco Vasco Road
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ameresco Vasco Road.
Monthly Net Generation for Ameresco Vasco Road
Ameresco Vasco Road Details
Summary Information | |
---|---|
Plant Name | Ameresco Vasco Road (58435) |
Plant Address | 4001 North Vasco Road, Livermore, CA 95336 |
Utility | Ameresco Vasco Road, LLC (58431) |
Latitude, Longitude | 37.75444, -121.72889 |
Generation Dates on File | Feb 2014 to Dec 2023 |
Initial Operation Date | March 2013 |
Annual Generation | 31.5 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator ENG1 Details Operating February 2014
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2.1 MW |
Winter Capacity | 2.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ENG2 Details Operating February 2014
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2.1 MW |
Winter Capacity | 2.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Ameresco Vasco Road Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#72 | Modern Innovative Energy LLC | Youngstown, NY | 33.7 GWh |
#73 | LRI LFGTE Facility | Graham, WA | 33.6 GWh |
#74 | Springhill Gas Recovery Plant | Campbellton, FL | 32.9 GWh |
#75 | Ameresco Chiquita Canyon | Castaic, CA | 32.6 GWh |
#76 | Finley Buttes Landfill Gas | Boardman, OR | 32.4 GWh |
#77 | MM San Diego-Miramar | San Diego, CA | 35.9 GWh |
#78 | Ameresco Forward | Manteca, CA | 32.1 GWh |
#79 | Taylor | Mauk, GA | 31.7 GWh |
#80 | Georgia LFG Oak Grove Plant | Winder, GA | 38.4 GWh |
#81 | Southeast Berrien Generating Facility | Niles, MI | 31.6 GWh |
#83 | Ameresco San Joaquin | Linden, CA | 30.9 GWh |
#84 | Amelia | Jetersville, VA | 32.6 GWh |
#85 | Fitchburg Gas Recovery | Westminster, MA | 30.7 GWh |
#86 | Sand Valley Power Station | Collinsville, AL | 30.6 GWh |
#87 | Prairie View I & II LFGTE | Wyatt, IN | 30.5 GWh |
#88 | Suburban Landfill Gas Recovery | Glenford, OH | 30.5 GWh |
#89 | Brevard | Cocoa, FL | 30.4 GWh |
#90 | Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.3 GWh |
#91 | Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh |
#92 | Ameresco Delaware South | Georgetown, DE | 29.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ameresco Vasco Road.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altamont Gas Recovery | Livermore, CA | 39.4 GWh | 4.3 mi |
Buena Vista Energy LLC | Byron, CA | 90.9 GWh | 4.9 mi |
Byron Highway Solar | Byron, CA | 12.8 GWh | 8.8 mi |
CSD 2 - Heritage High | Brentwood, CA | 1.9 GWh | 11.7 mi |
Diablo Winds LLC | Livermore, CA | 35.8 GWh | 6.3 mi |
Foundation ST | Tracy, CA | 1.8 GWh | 11.7 mi |
Golden Hills North Wind Energy Center | Livermore, CA | 127.1 GWh | 5.5 mi |
Golden Hills Wind | Livermore, CA | 247.8 GWh | 5.6 mi |
Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.6 GWh | 9.8 mi |
Life Technologies - Pleasanton | Pleasanton, CA | 8.0 GWh | 11.4 mi |
Mariposa Energy Project | Byron, CA | 92.8 GWh | 7.3 mi |
Medline Ind. Phase 2 Tracy | Tracy, CA | 2.0 GWh | 12.1 mi |
Pleasanton - Amador Valley High School | Pleasanton, CA | 1.5 GWh | 10.2 mi |
Prologis L.P | Tracy, CA | 2.7 GWh | 11.1 mi |
Santa Rita Jail Fuel Cell | Dublin, CA | 11.1 GWh | 9 mi |
Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh | 9 mi |
Summit Winds | Livermore, CA | 166.5 GWh | 2.1 mi |
Tracy 210 | Tracy, CA | 15.9 GWh | 11 mi |
Vasco Winds | Livermore, CA | 216.0 GWh | 2.6 mi |
Whitethorn Solar LLC | Livermore, CA | 5.6 GWh | 4.4 mi |