1231 Buena Vista Road, Watsonville, CA 95076Plant Summary Information
Ameresco Santa Cruz Energy is ranked #23 out of 38 landfill gas power plants in California in terms of total annual net electricity generation.
Ameresco Santa Cruz Energy is comprised of 3 generators and generated 4.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ameresco Santa Cruz Energy |
---|---|
Utility Name | AMERESCO Santa Cruz Energy LLC |
Location | Santa Cruz County, CA |
Initial Operation Date | January 2006 |
Last Update | Dec 2023 |
Annual Generation | 18.8 GWh |
Annual Consumption | 229.8 k MMBtu |
Ranked #5,129 out of 11,835 Power Plants Nationwide | |
Ranked #162 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #715 out of 1,569 California Power Plants | |
Ranked #23 out of 38 California Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Ameresco Santa Cruz Energy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ameresco Santa Cruz Energy.
Monthly Net Generation for Ameresco Santa Cruz Energy
Ameresco Santa Cruz Energy Details
Summary Information | |
---|---|
Plant Name | Ameresco Santa Cruz Energy (56428) |
Plant Address | 1231 Buena Vista Road, Watsonville, CA 95076 |
Utility | AMERESCO Santa Cruz Energy LLC (54814) |
Latitude, Longitude | 36.9178, -121.8156 |
Generation Dates on File | Jan 2006 to Dec 2023 |
Initial Operation Date | January 2006 |
Annual Generation | 18.8 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 06-29-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator Unit1 Details Operating January 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator Unit2 Details Operating January 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator Unit3 Details Operating January 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Ameresco Santa Cruz Energy Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#152 | Gaston County Renewable Energy Center | Dallas, NC | 21.0 GWh |
#153 | Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh |
#154 | DADS Gas Recovery | Aurora, CO | 20.6 GWh |
#155 | Oak Grove Power Producers | Arcadia, KS | 20.2 GWh |
#156 | Spruce Ridge Gas Recovery | Glencoe, MN | 20.2 GWh |
#157 | Greater New Bedford LFG Utiliz. Facility | New Bedford, MA | 19.9 GWh |
#158 | BMW Manufacturing Co | Greer, SC | 31.7 GWh |
#159 | Waste Management Crossroads LFGTE | Norridgewock, ME | 19.5 GWh |
#160 | Geneva | Geneva, OH | 19.5 GWh |
#161 | Lake Mills Gas Recovery | Lake Mills, IA | 19.2 GWh |
#163 | Rochelle Energy Center | Rochelle, IL | 18.7 GWh |
#164 | Lycoming County | Montgomery, PA | 18.6 GWh |
#165 | I 95 Landfill Phase II | Lorton, VA | 18.6 GWh |
#166 | Milner Butte LFGE | Burley, ID | 18.4 GWh |
#167 | Waxdale | Sturtevant, WI | 45.3 GWh |
#168 | GRS C&C | Marshall, MI | 18.2 GWh |
#169 | MM Yolo Power | Woodland, CA | 17.9 GWh |
#170 | Lanchester Generating Station | Narvon, PA | 17.7 GWh |
#171 | ADS Renewable Energy-Wolf Creek LLC | Dry Branch, GA | 17.7 GWh |
#172 | Central Generating | Pierson, MI | 17.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ameresco Santa Cruz Energy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cabrillo College | Aptos, CA | 13.0 MWh | 7.6 mi |
Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 4.7 TWh | 8 mi |
Extreme San Ignacio | San Jose, CA | 6.0 GWh | 22.1 mi |
Extreme Via Del Oro | San Jose, CA | 8.5 GWh | 22.2 mi |
Gap Pacific Distribution Center | Fresno, CA | 5.7 GWh | 8 mi |
Gilroy Peaking Energy Center | Gilroy, CA | 27.2 GWh | 16.4 mi |
Gilroy Power Plant | Gilroy, CA | 74.5 GWh | 16.4 mi |
Graniterock Quarry | Aromas, CA | 9.1 GWh | 12.1 mi |
Hollister Solar LLC | Hollister, CA | 3.5 GWh | 21.7 mi |
Malech Solar Farm | San Jose, CA | 5.3 GWh | 21.9 mi |
Marina Landfill Gas | Marina, CA | 34.0 GWh | 14.4 mi |
Metcalf Energy Center | San Jose, CA | 3.0 TWh | 21.3 mi |
Monterey One Water | Marina, CA | 7.8 GWh | 14.9 mi |
Monterey Regional Water Pollution Control Agency | Marina, CA | 1.1 GWh | 13.7 mi |
Santa Cruz Energy | Santa Cruz, CA | 10.0 GWh | 16.5 mi |
Taylor Farms - Schilling Place | Salinas, CA | 6.5 GWh | 21.1 mi |
Taylor Farms Salinas | Salinas, CA | 7.6 GWh | 20.9 mi |
TLR000 Hansen Fuel Cell | Salinas, CA | 8.3 GWh | 20.9 mi |
UC Santa Cruz Solar | Santa Cruz, CA | 3.5 GWh | 14.1 mi |
University of California Santa Cruz | Santa Cruz, CA | 35.9 GWh | 14.7 mi |