Ameresco Jefferson City
8432 No More Victims Rd, Jefferson City, MO 65101Plant Summary Information
Ameresco Jefferson City is ranked #1 out of 5 landfill gas power plants in Missouri in terms of total annual net electricity generation.
Ameresco Jefferson City is comprised of 3 generators and generated 6.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ameresco Jefferson City |
---|---|
Utility Name | AMERESCO Jefferson City LLC |
Location | Cole County, MO |
Initial Operation Date | March 2009 |
Last Update | Dec 2023 |
Annual Generation | 22.4 GWh |
Annual Consumption | 234.9 k MMBtu |
Ranked #4,921 out of 11,836 Power Plants Nationwide | |
Ranked #138 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #53 out of 120 Missouri Power Plants | |
Ranked #1 out of 5 Missouri Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Ameresco Jefferson City
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ameresco Jefferson City.
Monthly Net Generation for Ameresco Jefferson City
Ameresco Jefferson City Details
Summary Information | |
---|---|
Plant Name | Ameresco Jefferson City (56896) |
Plant Address | 8432 No More Victims Rd, Jefferson City, MO 65101 |
Utility | AMERESCO Jefferson City LLC (56102) |
Latitude, Longitude | 38.55237, -92.04493 |
Generation Dates on File | Mar 2009 to Dec 2023 |
Initial Operation Date | March 2009 |
Annual Generation | 22.4 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 08-71-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Union Electric Co - (MO) (19436) MO |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating March 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating March 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating March 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Ameresco Jefferson City Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#128 | Hidden Hollow Energy | Boise, ID | 24.0 GWh |
#129 | Waste Management Lockwood LFGTE | Sparks, NV | 23.7 GWh |
#130 | Ameresco Delaware Central | Sandtown, DE | 23.5 GWh |
#131 | Sycamore Energy LLC | Santee, CA | 23.2 GWh |
#132 | Pendleton County LFGTE | Butler, KY | 23.1 GWh |
#133 | Watervliet | Watervliet, MI | 23.0 GWh |
#134 | Lee County Landfill | Bishopville, SC | 22.6 GWh |
#135 | Allenwood | Montgomery, PA | 22.5 GWh |
#136 | DANC LFGTE Facility | Rodman, NY | 22.5 GWh |
#137 | Chesterfield Landfill Gas | Chester, VA | 24.3 GWh |
#139 | Reventure Park | Charlotte, NC | 22.4 GWh |
#140 | Chestnut Ridge Gas Recovery | Heiskell, TN | 22.3 GWh |
#141 | Short Mountain | Eugene, OR | 22.2 GWh |
#142 | Millersville LFG | Severn, MD | 22.1 GWh |
#143 | Westside Landfill Gas Recovery | Aledo, TX | 22.0 GWh |
#144 | Five Oaks Gas Recovery | Taylorville, IL | 21.9 GWh |
#145 | Oak Ridge LFGTE | Logansport, IN | 21.7 GWh |
#146 | Eagle Valley (MI) | Orion, MI | 21.6 GWh |
#147 | Energy Developments, Hancock | Findlay, OH | 21.4 GWh |
#148 | Cumberland County Solid Waste Complex | Millville, NJ | 21.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ameresco Jefferson City.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altona Solar, LLC | Centralia, MO | 7.8 GWh | 50.8 mi |
Audrain Generating Station | Vandalia, MO | 197.1 GWh | 59 mi |
Callaway | Fulton, MO | 9.4 TWh | 20.2 mi |
Columbia (MO) | Columbia, MO | 16.6 GWh | 32 mi |
Columbia Energy Center | Columbia, MO | 20.1 GWh | 34.3 mi |
Fairgrounds | Jefferson City, MO | 1.5 GWh | 9.9 mi |
Fulton (MO) | Fulton, MO | 206.0 MWh | 22.4 mi |
Labadie | Labadie, MO | 15.7 TWh | 65.2 mi |
Lebanon Solar Farm (MO) | Lebanon, MO | 4.3 GWh | 69.9 mi |
Mexico | Mexico, MO | 12.7 MWh | 42.7 mi |
MJMEUC Generating Station #1 | Laddonia, MO | 110.4 GWh | 53 mi |
Moberly | Moberly, MO | 30.0 MWh | 64.7 mi |
Montgomery County Community Solar Center | New Florence, MO | 11.2 GWh | 40.9 mi |
Moreau | Moreau, MO | 2.1 GWh | 3.1 mi |
MU Combined Heat and Power Plant | Columbia, MO | 190.5 GWh | 31.3 mi |
Niangua | Camdenton, MO | 1.7 GWh | 60.8 mi |
Osage Dam | Eldon, MO | 176.1 GWh | 39.5 mi |
Rolla Solar Farm (MO) | Rolla, MO | 4.3 GWh | 43 mi |
Truman Solar | Colombia, MO | 22.7 GWh | 29.9 mi |
Waynesville Solar Farm (MO) | Waynesville, MO | 4.6 GWh | 52.9 mi |