Ameresco HCE Solar LLC
County Road 114, Glenwood Springs, CO 81601Plant Summary Information
Ameresco HCE Solar LLC is ranked #117 out of 142 solar farms in Colorado in terms of total annual net electricity generation.
Ameresco HCE Solar LLC generated 1.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ameresco HCE Solar LLC |
---|---|
Utility Name | Ameresco HCE Solar LLC |
Location | Garfield County, CO |
Initial Operation Date | August 2023 |
Last Update | Dec 2023 |
Annual Generation | 2.7 GWh |
Annual Consumption | 9.1 k MMBtu |
Ranked #9,266 out of 11,835 Power Plants Nationwide | |
Ranked #4,083 out of 5,643 Solar Power Plants Nationwide | |
Ranked #232 out of 267 Colorado Power Plants | |
Ranked #117 out of 142 Colorado Solar Power Plants | |
Fuel Types | Solar |
Map of Ameresco HCE Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ameresco HCE Solar LLC.
Monthly Net Generation for Ameresco HCE Solar LLC
Ameresco HCE Solar LLC Details
Summary Information | |
---|---|
Plant Name | Ameresco HCE Solar LLC (66271) |
Plant Address | County Road 114, Glenwood Springs, CO 81601 |
Utility | Ameresco HCE Solar LLC (65395) |
Latitude, Longitude | 39.46647, -107.23477 |
Generation Dates on File | Jul 2023 to Dec 2023 |
Initial Operation Date | August 2023 |
Annual Generation | 2.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF23-630-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Holy Cross Electric Assn, Inc (8773) CO |
Grid Voltage | 24.90 kV |
Energy Storage | Yes |
Generator HCEBA Details Operating August 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 5.8 MW |
Summer Capacity | 5.8 MW |
Winter Capacity | 5.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 12H |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 15.5 |
---|---|
Maximum Charge Rate | 5 MW |
Maximum Discharge Rate | 5 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.1 |
Storage Enclosure Type | CS |
Load Management | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 66271 |
Direct Support Gen Id | HCEPV |
Support T D Asset | No |
Generator HCEPV Details Operating August 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.5 MW |
Summer Capacity | 4.5 MW |
Winter Capacity | 4.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Tilt Angle | 20 |
DC Net Capacity | 5.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Ameresco HCE Solar LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4073 | Newton Rumford Landfill | Newton, MA | 2.7 GWh |
#4074 | Town of Uxbridge MA at Commerce Dr | Uxbridge, MA | 2.7 GWh |
#4075 | Regal Ware | West Bend, WI | 2.7 GWh |
#4076 | GD West Greenwich Victory I, LLC | West Greenwich, RI | 2.7 GWh |
#4077 | Whistling Winds DPC Solar | New Lisbon, WI | 2.7 GWh |
#4078 | Barrette Outdoor Living, Inc. | Egg Harbor City, NJ | 2.7 GWh |
#4079 | Mira Loma | Mira Loma, CA | 2.7 GWh |
#4080 | MO33 CSG | Gaithersburg, MD | 2.7 GWh |
#4081 | Baer Road CSG | New York, NY | 2.7 GWh |
#4082 | Seaboard Oxford, LLC | Oxford, MA | 2.7 GWh |
#4084 | Lisbon Street Solar | Lewiston, ME | 2.7 GWh |
#4085 | Sabert Solar | Sayreville, NJ | 2.7 GWh |
#4086 | Whitcomb Solar Farm | Essex Junction, VT | 2.7 GWh |
#4087 | DG AMP Solar Versailles | Versailles, OH | 2.7 GWh |
#4088 | Ashby Solar, LLC CSG | Fitchburg, MA | 2.7 GWh |
#4089 | Howland CSG | Sandy Creek, NY | 2.7 GWh |
#4090 | Leominster (MA)-South Street-R&D | Tewksbury, MA | 2.7 GWh |
#4091 | East Amwell | East Amwell Twp, NJ | 2.7 GWh |
#4092 | Kimberly-Clark Solar | LaGrange, GA | 2.7 GWh |
#4093 | Clarkstown Landfill Solar Facility | West Nyack, NY | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ameresco HCE Solar LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
3 MW LLC | Somerset, CO | 2.6 GWh | 41.6 mi |
American Gypsum Cogeneration | Gypsum, CO | 23.6 GWh | 19.7 mi |
Basalt | Aspen, CO | 16.3 GWh | 23.2 mi |
Dillon Hydro Plant | Summit, CO | 12.9 GWh | 63.2 mi |
Eagle Springs Solar LLC | Silt, CO | 1.8 GWh | 24.9 mi |
Eagle Valley Clean Energy LLC Biomass | Gypsum, CO | 57.1 GWh | 20 mi |
Green Mountain | Kremmling, CO | 47.1 GWh | 55.8 mi |
Lower Molina | Molina, CO | 18.6 GWh | 47.2 mi |
Oak Leaf Solar XXXI LLC (CSG) | Debeque, CO | 3.3 GWh | 62.1 mi |
Oak Leaf Solar XXXII (CSG) | Rifle, CO | 3.1 GWh | 31.2 mi |
Pitkin County Solar | Aspen, CO | 11.8 GWh | 24.4 mi |
Pivot Solar 1 LLC (CSG) | Parachute, CO | 1.9 GWh | 45.8 mi |
Pivot Solar 3 LLC (CSG) | Parachute, CO | 3.8 GWh | 45.8 mi |
Pivot Solar 7 LLC (CSG) | Rifle, CO | 3.5 GWh | 31.2 mi |
Shoshone (CO) | Glenwood Springs, CO | 24.3 GWh | 7.2 mi |
Sugarloaf Hydro Plant | Leadville, CO | 3.9 GWh | 48.3 mi |
Sunnyside Ranch Community Solar Array | Carbondale, CO | 2.7 GWh | 5.5 mi |
Upper Molina | Molina, CO | 32.0 GWh | 46.8 mi |
Williams Fork Hydro Plant | Parshall, CO | 8.7 GWh | 67.3 mi |
WWRF Solar Plant | Rifle, CO | 2.0 GWh | 31.1 mi |