Ameresco Delaware Central
1107 Willow Grove Road, Sandtown, DE 19943Plant Summary Information
Ameresco Delaware Central is ranked #11 out of 29 power plants in Delaware in terms of total annual net electricity generation.
Ameresco Delaware Central is comprised of 5 generators and generated 6.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ameresco Delaware Central |
---|---|
Utility Name | AMERESCO Delaware Central |
Location | Kent County, DE |
Initial Operation Date | December 2006 |
Last Update | Dec 2023 |
Annual Generation | 23.5 GWh |
Annual Consumption | 288.4 k MMBtu |
Ranked #4,867 out of 11,852 Power Plants Nationwide | |
Ranked #130 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #11 out of 29 Delaware Power Plants | |
Ranked #2 out of 3 Delaware Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Ameresco Delaware Central
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ameresco Delaware Central.
Monthly Net Generation for Ameresco Delaware Central
Ameresco Delaware Central Details
Summary Information | |
---|---|
Plant Name | Ameresco Delaware Central (56430) |
Plant Address | 1107 Willow Grove Road, Sandtown, DE 19943 |
Utility | AMERESCO Delaware Central (54816) |
Latitude, Longitude | 39.0339, -75.7233 |
Generation Dates on File | Jan 2007 to Dec 2023 |
Initial Operation Date | December 2006 |
Annual Generation | 23.5 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 06-244-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Delaware Electric Cooperative (5070) DE |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator 1C Details Operating December 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2C Details Operating December 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3C Details Operating December 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4C Details Operating March 2014
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5C Details Operating March 2014
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Ameresco Delaware Central Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#120 | G2 Energy Ostrom Road LLC | Wheatland, CA | 25.2 GWh |
#121 | Eastern Landfill Gas LLC | White Marsh, MD | 25.1 GWh |
#122 | Settlers Hill Gas Recovery | Batavia, IL | 24.9 GWh |
#123 | Salt Lake Energy Systems | Salt Lake City, UT | 24.8 GWh |
#124 | Blue Water Renewables Inc | Kimball Township, MI | 24.6 GWh |
#125 | Waste Management Naples LFGTE Project | Naples, FL | 24.5 GWh |
#126 | Farmers Branch Renewable Energy Facility | Lewisville, TX | 24.1 GWh |
#127 | Bryon Center | Byron Center, MI | 24.0 GWh |
#128 | Hidden Hollow Energy | Boise, ID | 24.0 GWh |
#129 | Waste Management Lockwood LFGTE | Sparks, NV | 23.7 GWh |
#131 | Sycamore Energy LLC | Santee, CA | 23.2 GWh |
#132 | Pendleton County LFGTE | Butler, KY | 23.1 GWh |
#133 | Watervliet | Watervliet, MI | 23.0 GWh |
#134 | Lee County Landfill | Bishopville, SC | 22.6 GWh |
#135 | Allenwood | Montgomery, PA | 22.5 GWh |
#136 | DANC LFGTE Facility | Rodman, NY | 22.5 GWh |
#137 | Chesterfield Landfill Gas | Chester, VA | 24.3 GWh |
#138 | Ameresco Jefferson City | Jefferson City, MO | 22.4 GWh |
#139 | Reventure Park | Charlotte, NC | 22.4 GWh |
#140 | Chestnut Ridge Gas Recovery | Heiskell, TN | 22.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ameresco Delaware Central.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bd of Educ of Queen Anne's Cnty, Cnty HS | Centreville, MD | 2.8 GWh | 17.8 mi |
Blue Hen Solar | Dartley, DE | 2.7 GWh | 10.7 mi |
Blue Star | Massey, MD | 12.1 GWh | 22.9 mi |
Bluegrass Solar | Church Hill, MD | 157.6 GWh | 16.2 mi |
Chesapeake College | Wye Mills, MD | 2.4 GWh | 20.1 mi |
Church Hill | Church Hill, MD | 7.5 GWh | 13.5 mi |
DG AMP Solar Smyrna | Smyrna, DE | 1.9 GWh | 17.8 mi |
Dover Sun Park | Dover, DE | 12.4 GWh | 15.6 mi |
Energy Center Dover | Dover, DE | 107.1 GWh | 12.4 mi |
ENGIE Solidago Solar Project - Hybrid | Townsend, DE | 94.0 GWh | 25 mi |
Garrison Energy Center LLC | Dover, DE | 768.2 GWh | 16 mi |
Kent County Wastewater Treatment Solar | Milford, DE | 1.2 GWh | 15.6 mi |
Kent County-Kennedyville | Kennedyville, MD | 1.6 GWh | 22.9 mi |
Milford Solar Farm | Milford, DE | 15.2 GWh | 16.4 mi |
Perdue Bridgeville Photovoltaic | Bridgeville, DE | 1.8 GWh | 20.2 mi |
Queen Anne's County | Centreville, MD | 2.6 GWh | 15.7 mi |
Town of Chestertown- Chestertown WWTP | Chestertown, MD | 1.6 GWh | 22.1 mi |
Van Sant Station | Dover, DE | 643.5 MWh | 12.1 mi |
Warren F Sam Beasley Generation Station | Smyrna, DE | 55.1 GWh | 17.8 mi |
Wye Mills VNEM CSG | Queen Anne, MD | 18.9 GWh | 18.5 mi |