Ameresco Butte County

1023 Neal Rd, Paradise, CA 95954

Plant Summary Information

Ameresco Butte County is ranked #25 out of 38 landfill gas power plants in California in terms of total annual net electricity generation.

Ameresco Butte County is comprised of 1 generator and generated 4.1 GWh during the 3-month period between September 2023 to December 2023.

Plant NameAmeresco Butte County
Utility NameAmeresco Butte County LLC
LocationButte County, CA
Initial Operation DateFebruary 2013
Last Update Dec 2023
Annual Generation 16.0 GWh
Annual Consumption 179.8 k MMBtu
Ranked #5,321 out of 11,835 Power Plants Nationwide
Ranked #187 out of 299 Landfill Gas Power Plants Nationwide
Ranked #746 out of 1,569 California Power Plants
Ranked #25 out of 38 California Landfill Gas Power Plants
Fuel Types Landfill Gas

Map of Ameresco Butte County

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ameresco Butte County.

Create Your Account Today

Monthly Net Generation for Ameresco Butte County

Ameresco Butte County Details

Summary Information
Plant NameAmeresco Butte County (57771)
Plant Address1023 Neal Rd, Paradise, CA 95954
UtilityAmeresco Butte County LLC (57079)
Latitude, Longitude39.674, -121.73
Generation Dates on FileJan 2014 to Dec 2023
Initial Operation DateFebruary 2013
Annual Generation 16.0 GWh
Fuel Types Landfill Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number12-274-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 60.00 kV
Energy StorageNo

Generator 1 Details Operating February 2013

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity2.3 MW
Nameplate Power Factor1
Summer Capacity2 MW
Winter Capacity2 MW
Minimum Load0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2013
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Ameresco Butte County Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Landfill Gas.

RankPlant NamePlant LocationAnnual Generation
#177Jay County LFGTEPortland, IN17.0 GWh
#178Fighting Creek LFGTE PlantCoeur d'Alene, ID17.0 GWh
#179Timberline Trail Gas RecoveryWeyerhaeser, WI16.9 GWh
#180Green Valley LFGTEAshland, KY16.9 GWh
#181Pinconning White FeatherPinconning, MI16.8 GWh
#182GRS CMSConcord, NC16.8 GWh
#183Tulsa LFG LLCSand Springs, OK16.7 GWh
#184Black Oak Power ProducersHartville, MO16.5 GWh
#185Frey Farm LandfillConestoga, PA16.4 GWh
#186Seminole EnergyGeneva, FL16.3 GWh
#188Woodland Landfill Gas RecoverySouth Elgin, IL16.0 GWh
#189Nodal PowerSalt Lake City, UT15.8 GWh
#190SecurityCleveland, TX15.2 GWh
#191L&S SweetnersLeola, PA15.1 GWh
#192CID Gas RecoveryCalumet City, IL14.7 GWh
#193Fulton LFGTE FacilityJohnstown, NY14.6 GWh
#194WicomicoSalisbury, MD15.4 GWh
#195GLRA LandfillLebanon, PA14.2 GWh
#196Tazewell Gas RecoveryEast Peoria, IL14.2 GWh
#197Ameresco Chicopee EnergyChicopee, MA14.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Ameresco Butte County.

Plant NamePlant LocationAnnual GenerationDistance
2127 Harris Solar ProjectLive Oak, CA1.5 GWh26.6 mi
Adapture CA2, LLCOrland, CA3.1 GWh23.8 mi
Bucks CreekStorrie, CA84.5 GWh26.9 mi
Butte College Main Campus SolarOroville, CA6.7 GWh4.9 mi
CrestaStorrie, CA121.7 GWh20 mi
De SablaMagalia, CA47.2 GWh14.5 mi
Edward C HyattOroville, CA2.4 TWh15.6 mi
Enloe Medical - ChicoChico, CA13.5 GWh7.9 mi
ForbestownForbestown, CA155.0 GWh25.5 mi
Forks of Butte Hydro ProjectMagalia, CA41.9 GWh14.5 mi
Gridley MainGridley, CA1.6 GWh20.9 mi
Gridley Main TwoGridley, CA4.0 GWh20.9 mi
Kelly RidgeOroville, CA65.0 GWh16.1 mi
Oroville Cogeneration LPOroville, CA235.0 MWh15.4 mi
PoeStorrie, CA608.8 GWh14.2 mi
Rock CreekStorrie, CA571.1 GWh25.9 mi
Sierra Nevada Brewing Co HybridChico, CA9.3 GWh5.7 mi
ThermalitoOroville, CA341.8 GWh12.2 mi
Thermalito Diverson DamOroville, CA16.5 GWh14 mi
ToadtownMagalia, CA2.5 GWh16.8 mi