Alpena Cement Plant
1435 Ford Avenue, Alpena, MI 49707Plant Summary Information
Alpena Cement Plant is ranked #5 out of 13 petroleum coke power plants nationwide in terms of total annual net electricity generation.
Alpena Cement Plant is comprised of 5 generators and generated 51.1 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Alpena Cement Plant |
---|---|
Utility Name | Lafarge Corp |
Location | Alpena County, MI |
Initial Operation Date | January 1952 |
Last Update | Sep 2024 |
Annual Generation | 176.1 GWh |
Annual Consumption | 9.7 M MMBtu |
Ranked #2,471 out of 11,852 Power Plants Nationwide | |
Ranked #5 out of 13 Petroleum Coke Power Plants Nationwide | |
Ranked #60 out of 256 Michigan Power Plants | |
Ranked #2 out of 2 Michigan Petroleum Coke Power Plants | |
Fuel Types | Petroleum Coke : 80.3% Natural Gas : 19.7% |
Map of Alpena Cement Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alpena Cement Plant.
Monthly Net Generation for Alpena Cement Plant
Alpena Cement Plant Details
Summary Information | |
---|---|
Plant Name | Alpena Cement Plant (50305) |
Plant Address | 1435 Ford Avenue, Alpena, MI 49707 |
Utility | Lafarge Corp (40430) |
Latitude, Longitude | 45.06993, -83.40818 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | January 1952 |
Annual Generation | 176.1 GWh |
Fuel Types | Petroleum Coke : 80.3% Natural Gas : 19.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Cement Manufacturing (32731) |
Sector | Industrial CHP (7) |
Water Source | Lake Huron |
Ash Impoundment | No |
Transmission / Distribution Owner | Alpena Power Co (392) MI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | DTE GAS COMPANY |
Natural Gas Storage | No |
Generator GEN6 Details Operating January 1952
Technology | Petroleum Coke |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 12 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12 MW |
Winter Capacity | 12 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1952 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
---|---|
Energy Source | Petroleum Coke / Natural Gas / Other Fuel / Other Biomass Liquids / Wood/Wood Waste Solids / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | PC / SUB / OTH / OBL / WDS / OTH |
---|
Generator GEN7 Details Operating January 1955
Technology | Petroleum Coke |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1955 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
---|---|
Energy Source | Petroleum Coke / Natural Gas / Other Fuel / Other Biomass Liquids / Wood/Wood Waste Solids / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | PC / SUB / OTH / OBL / WDS / OTH |
---|
Generator GEN8 Details Operating April 1991
Technology | Petroleum Coke |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 11 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 11 MW |
Winter Capacity | 11 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1991 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
---|---|
Energy Source | Petroleum Coke / Natural Gas / Other Fuel / Other Biomass Liquids / Wood/Wood Waste Solids / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | PC / SUB / OTH / OBL / WDS / OTH |
---|
Generator GEN9 Details Operating April 1994
Technology | Petroleum Coke |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 11 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 11 MW |
Winter Capacity | 11 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1994 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
---|---|
Energy Source | Petroleum Coke / Natural Gas / Other Fuel / Other Biomass Liquids / Wood/Wood Waste Solids / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | PC / SUB / OTH / OBL / WDS / OTH |
---|
Generator GE10 Details Operating February 1999
Technology | Petroleum Coke |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3.2 MW |
Winter Capacity | 3.2 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1999 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
---|---|
Energy Source | Petroleum Coke / Natural Gas / Other Fuel / Other Biomass Liquids / Wood/Wood Waste Solids / Other Fuel |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | PC / SUB / OTH / OBL / WDS / OTH |
---|
Alpena Cement Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Petroleum Coke.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Monroe (MI) | Monroe, MI | 12.9 TWh |
#2 | FirstEnergy Bay Shore | Oregon, OH | 938.3 GWh |
#3 | Northside Generating Station | Jacksonville, FL | 3.0 TWh |
#4 | Yellowstone Energy LP | Billings, MT | 441.5 GWh |
#6 | Brame Energy Center | Lena, LA | 3.0 TWh |
#7 | Savannah River Mill | Rincon, GA | 86.3 GWh |
#8 | Valero Refinery Corpus Christi West | Corpus Christi, TX | 98.6 GWh |
#9 | Seadrift Coke LP | Port Lavaca, TX | 18.7 GWh |
#10 | Manitowoc | Manitowoc, WI | 137.2 GWh |
#11 | University of Northern Iowa | Cedar Falls, IA | 19.6 GWh |
#12 | Toledo Ref Power Recovery Train | Oregon, OH | 1.8 GWh |
#13 | Roquette America | Keokuk, IA | 207.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alpena Cement Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alcona | Glennie, MI | 25.9 GWh | 40.1 mi |
Alpine Power Plant | Elmira, MI | 816.4 GWh | 69.2 mi |
Cheboygan | Cheboygan, MI | 5.7 GWh | 65.2 mi |
Cooke | Oscoda, MI | 25.7 GWh | 42 mi |
Decorative Panels Intl | Alpena, MI | 42.9 GWh | 0.9 mi |
Detour | Detour, MI | 592.0 MWh | 67.6 mi |
Five Channels | Oscoda, MI | 22.3 GWh | 44.4 mi |
Foote | Oscoda, MI | 29.1 GWh | 43.9 mi |
Four Mile Hydropower Project | Alpena, MI | 9.6 GWh | 4.9 mi |
Gaylord - Wolverine | Gaylord, MI | 10.1 GWh | 64.3 mi |
Grayling Generating Station | Grayling, MI | 134.1 GWh | 70.6 mi |
Kleber | Onaway, MI | 4.8 GWh | 50.2 mi |
Lightfoot Solar, LLC | Luzerne, MI | 548.0 MWh | 47.9 mi |
Livingston Generating Station | Gaylord, MI | 10.1 GWh | 64.6 mi |
Loud | Oscoda, MI | 16.7 GWh | 44.6 mi |
Mio | Mio, MI | 10.0 GWh | 45.3 mi |
National Energy of Lincoln | Lincoln, MI | 141.5 GWh | 26.9 mi |
Ninth Street Hydropower Project | Alpena, MI | 6.8 GWh | 1.5 mi |
Norway Point Hydropower Project | Alpena, MI | 14.0 GWh | 5.9 mi |
Tower | Tower, MI | 195.0 MWh | 47.7 mi |