Almond
TBD, Lemoore, CA 93245Plant Summary Information
Almond is ranked #301 out of 799 solar farms in California in terms of total annual net electricity generation.
Almond generated 8.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Almond |
---|---|
Utility Name | Westlands Almond LLC |
Location | Kings County, CA |
Initial Operation Date | September 2023 |
Last Update | Dec 2023 |
Annual Generation | 9.6 GWh |
Annual Consumption | 32.6 k MMBtu |
Ranked #6,027 out of 11,852 Power Plants Nationwide | |
Ranked #1,608 out of 5,655 Solar Power Plants Nationwide | |
Ranked #855 out of 1,570 California Power Plants | |
Ranked #301 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Almond
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Almond.
Monthly Net Generation for Almond
Almond Details
Summary Information | |
---|---|
Plant Name | Almond (62546) |
Plant Address | TBD, Lemoore, CA 93245 |
Utility | Westlands Almond LLC (62048) |
Latitude, Longitude | 36.21222, -119.91 |
Generation Dates on File | Sep 2023 to Dec 2023 |
Initial Operation Date | September 2023 |
Annual Generation | 9.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 23-820-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 70.00 kV |
Energy Storage | No |
Generator ALMND Details Operating September 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 19.9 MW |
Summer Capacity | 19.9 MW |
Winter Capacity | 19.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 26 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Almond Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1598 | ZV Solar 1 | Red Springs, NC | 9.6 GWh |
#1599 | Maywood Photovoltaic Project | Indianapolis, IN | 9.6 GWh |
#1600 | Gilcrest V CSG | Platteville, CO | 9.6 GWh |
#1601 | Mount Olive Farm | Mount Olive, NC | 9.6 GWh |
#1602 | ESA Boston Solar, LLC | Roxboro, NC | 9.6 GWh |
#1603 | Arborgate Solar | Pittsboro, NC | 9.6 GWh |
#1604 | Cotten Farm, LLC | Sanford, NC | 9.6 GWh |
#1605 | Millikan Farm | Randleman, NC | 9.6 GWh |
#1606 | Wilson Solar Farm 4 | Wilson, NC | 9.6 GWh |
#1607 | Frenchtown III Solar | Frenchtown, NJ | 9.6 GWh |
#1609 | Bondi Solar | Kinston, NC | 9.6 GWh |
#1610 | RE Rio Grande Solar LLC | Mojave, CA | 9.5 GWh |
#1611 | Oakwood Solar | Mebane, NC | 9.5 GWh |
#1612 | Hamlin Solar 1, LLC | Hamlin, NY | 9.5 GWh |
#1613 | Meadowlark Solar | Dunn, NC | 9.5 GWh |
#1614 | Stikeleather Farm | Hiddenite, NC | 9.5 GWh |
#1615 | Ventura Solar, LLC | Taylorsville, NC | 9.5 GWh |
#1616 | Siler City Solar 2 | Siler City, NC | 9.5 GWh |
#1617 | Railroad Farm 2 | St. Pauls, NC | 9.5 GWh |
#1618 | Barnwell Solar | Barnwell, SC | 9.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Almond.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
American Kings Solar, LLC | Lemoore, CA | 325.3 GWh | 2 mi |
Aquamarine | Lemoore, CA | 409.5 GWh | 1.6 mi |
Chestnut | Lemoore, CA | 322.2 GWh | 3.6 mi |
Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 337.8 GWh | 11.6 mi |
Henrietta Peaker | Lemoore, CA | 5.0 GWh | 1.9 mi |
Henrietta Solar Project | Lemoore, CA | 234.2 GWh | 5.8 mi |
Huron Solar Station | Huron, CA | 31.3 GWh | 7.1 mi |
Java Solar, LLC | Lemoore, CA | 28.6 GWh | 5.4 mi |
Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh | 11.3 mi |
Lemoore 1 | Lemoore, CA | 232.0 MWh | 7 mi |
Mustang Two | Lemoore, CA | 393.0 GWh | 0.8 mi |
RE Kansas Solar, LLC | Lemoore, CA | 38.7 GWh | 4.9 mi |
RE Kansas South LLC | Lemoore, CA | 51.1 GWh | 4.3 mi |
RE Kent South, LLC | Lemoore, CA | 40.6 GWh | 1 mi |
RE Mustang LLC | Lemoore, CA | 149.9 GWh | 0.8 mi |
Slate Hybrid | Stratford, CA | 665.0 GWh | 1.3 mi |
Solar Blue | Lemoore, CA | 560.8 GWh | 2.7 mi |
Van der Kooi Dairy Solar Array | Riverdale, CA | 3.9 GWh | 8.3 mi |
Westlands Solar PV Farm | Huron, CA | 37.8 GWh | 10.6 mi |
Westside Solar Power PV1 | Lemoore, CA | 4.6 GWh | 0.5 mi |