Allen
2574 Plant Rd., Memphis, TN 38109Plant Summary Information
Allen is ranked #4 out of 84 power plants in Tennessee in terms of total annual net electricity generation.
Allen is comprised of 23 generators and generated 2.0 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Allen |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Shelby County, TN |
Initial Operation Date | May 1959 |
Last Update | Aug 2024 |
Annual Generation | 6.1 TWh |
Annual Consumption | 42.4 M MMBtu |
Ranked #159 out of 11,835 Power Plants Nationwide | |
Ranked #67 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #4 out of 84 Tennessee Power Plants | |
Ranked #1 out of 16 Tennessee Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Allen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Allen.
Monthly Net Generation for Allen
Allen Details
Summary Information | |
---|---|
Plant Name | Allen (3393) |
Plant Address | 2574 Plant Rd., Memphis, TN 38109 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 35.07409, -90.14868 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | May 1959 |
Annual Generation | 6.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Mississippi River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name | Other - Please explain in pipeline notes below. |
Natural Gas Storage | No |
Generator G10 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G11 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 24H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G12 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G13 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 20.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G14 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 20.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G15 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 20.4 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G16 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 20.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT1 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 20.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT2 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 20.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT3 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 20.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT4 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 20.4 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 20.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT5 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT6 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 15.1 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 15.1 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT7 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 16.4 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 16.4 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT8 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 16.4 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 16.4 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT9 Details Operating June 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 23.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.1 MW |
Winter Capacity | 20.4 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1971 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 16.4 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 16.4 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G17 Details Operating September 1972
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 46.4 MW |
Winter Capacity | 62.2 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 46.4 MW |
Net Winter Capacity With Natural Gas | 22.6 MW |
Net Summer Capacity With Oil | 44.8 MW |
Net Winter Capacity With Oil | 60 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G18 Details Operating September 1972
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 46.4 MW |
Winter Capacity | 62.2 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 46.4 MW |
Net Winter Capacity With Natural Gas | 22.6 MW |
Net Summer Capacity With Oil | 44.8 MW |
Net Winter Capacity With Oil | 60 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G19 Details Operating September 1972
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 46.4 MW |
Winter Capacity | 62.2 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 46.4 MW |
Net Winter Capacity With Natural Gas | 22.6 MW |
Net Summer Capacity With Oil | 44.8 MW |
Net Winter Capacity With Oil | 60 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G20 Details Operating September 1972
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 46.4 MW |
Winter Capacity | 62.2 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 46.4 MW |
Net Winter Capacity With Natural Gas | 22.6 MW |
Net Summer Capacity With Oil | 44.8 MW |
Net Winter Capacity With Oil | 22.6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CTG1 Details Operating April 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 347 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 311.9 MW |
Winter Capacity | 330.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating April 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 347 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 311.9 MW |
Winter Capacity | 330.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating April 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 476.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 428.3 MW |
Winter Capacity | 453.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Allen Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#57 | Lee Combined Cycle Plant | Goldsboro, NC | 6.5 TWh |
#58 | Dania Beach 7 | Ft. Lauderdale, FL | 6.5 TWh |
#59 | Clean Energy Future-Lordstown, LLC | Lordstown, OH | 6.5 TWh |
#60 | CPV Three Rivers Energy Center | Morris, IL | 6.5 TWh |
#61 | Marcus Hook Energy LP | Marcus Hook, PA | 6.5 TWh |
#62 | Hamilton Patriot Generation Plant | Montgomery, PA | 6.4 TWh |
#63 | Magnolia Power Plant | Ashland, MS | 6.4 TWh |
#64 | Cape Canaveral | Cocoa, FL | 6.2 TWh |
#65 | P L Bartow | St. Petersburg, FL | 6.2 TWh |
#66 | Bethlehem Power Plant | Bethlehem, PA | 6.2 TWh |
#68 | Lake Side Power Plant | Vineyard, UT | 6.1 TWh |
#69 | Santan | Gilbert, AZ | 6.0 TWh |
#70 | Hamilton Liberty | Towanda, PA | 6.0 TWh |
#71 | Montgomery County | Willis, TX | 6.0 TWh |
#72 | Midlothian Energy Facility | Midlothian, TX | 6.0 TWh |
#73 | Taft Cogeneration Facility | Hahnville, LA | 6.0 TWh |
#74 | Acadia Energy Center | Eunice, LA | 5.9 TWh |
#75 | Lake Charles Power | West Lake, LA | 5.9 TWh |
#76 | Hickory Run Energy Station | New Castle, PA | 5.9 TWh |
#77 | W S Lee | Williamston, SC | 5.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Allen.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Batesville Generation Facility | Batesville, MS | 4.8 TWh | 52.5 mi |
Big Cypress Solar, LLC | Crawfordsville, AR | 311.3 GWh | 20.7 mi |
Dell Power Station | Dell, AR | 4.1 TWh | 54.9 mi |
Delta Wind Farm (MS) | Dundee, MS | 169.9 GWh | 44 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.1 GWh | 37.3 mi |
Forrest City- Prison Site | Forrest City, AR | 2.1 GWh | 37.8 mi |
Haywood Solar | Brownsville, TN | 5.2 GWh | 59.7 mi |
IKEA Memphis 508 | Cordova, TN | 856.0 MWh | 21.3 mi |
Lagoon Creek | Brownsville, TN | 3.4 TWh | 58.5 mi |
Latitude Solar Center | Whiteville, TN | 24.9 GWh | 57.7 mi |
Magnolia Power Plant | Ashland, MS | 6.4 TWh | 56.1 mi |
Millington Solar Farm | Millington, TN | 100.0 GWh | 25.4 mi |
Plum Point Energy Station | Osceola, AR | 3.0 TWh | 42.3 mi |
Somerville Solar | Somerville, TN | 3.2 GWh | 46.3 mi |
Sr Byhalia, LLC | Byhalia, MS | 670.0 MWh | 31 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.5 GWh | 18.8 mi |
TVA Southaven Combined Cycle | Southaven, MS | 4.8 TWh | 8.4 mi |
West Tennessee Solar Farm | Stanton, TN | 2.6 GWh | 48.8 mi |
Wildberry | Moscow, TN | 18.9 GWh | 44.1 mi |
Wildflower Solar, LLC (MS) | DeSoto, MS | 75.8 GWh | 8 mi |