Alamo 6
1401 Nevill Cutoff Road, Fort Stockton, TX 79735Plant Summary Information
Alamo 6 is ranked #72 out of 184 solar farms in Texas in terms of total annual net electricity generation.
Alamo 6 generated 51.6 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Alamo 6 |
---|---|
Utility Name | BHE Renewables, LLC |
Location | Pecos County, TX |
Initial Operation Date | March 2017 |
Last Update | Feb 2025 |
Annual Generation | 243.3 GWh |
Annual Consumption | 880.9 k MMBtu |
Ranked #2,115 out of 11,993 Power Plants Nationwide | |
Ranked #241 out of 5,778 Solar Power Plants Nationwide | |
Ranked #382 out of 777 Texas Power Plants | |
Ranked #72 out of 184 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
OCI Solar Power (2013 to 2016) BHE Renewables, LLC (2017 to 2023) |
Map of Alamo 6
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alamo 6.
Monthly Net Generation for Alamo 6
Alamo 6 Details
Summary Information | |
---|---|
Plant Name | Alamo 6 (59206) |
Plant Address | 1401 Nevill Cutoff Road, Fort Stockton, TX 79735 |
Utility | BHE Renewables, LLC (59359) |
Latitude, Longitude | 30.99306, -102.27083 |
Generation Dates on File | Jan 2017 to Feb 2025 |
Initial Operation Date | March 2017 |
Annual Generation | 243.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator OCIA6 Details Operating March 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 105 MW |
Summer Capacity | 116 MW |
Winter Capacity | 116 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Dual Axis Tracking | Yes |
---|---|
DC Net Capacity | 139.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Alamo 6 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#231 | OCI Alamo 7 LLC | Haskell, TX | 250.2 GWh |
#232 | Nebula Solar | La Feria, TX | 250.2 GWh |
#233 | San Pablo Raceway | Lancaster, CA | 250.1 GWh |
#234 | Wilmot Energy Center LLC | Tucson, AZ | 247.3 GWh |
#235 | Rowland Solar II | Richmond, TX | 249.3 GWh |
#236 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 248.8 GWh |
#237 | East Line Solar | Coolidge, AZ | 248.0 GWh |
#238 | North Fork Solar Project | Snyder, OK | 247.9 GWh |
#239 | Orion I Solar Project | Burlington, TX | 243.4 GWh |
#240 | OE_MS6 | St.Artesia, MS | 239.1 GWh |
#242 | East Pecos Solar | McCamey, TX | 242.3 GWh |
#243 | SR Snipesville II | Denton, GA | 241.3 GWh |
#244 | Greasewood II LLC | Girvin, TX | 240.8 GWh |
#245 | SR Snipesville III | Denton, GA | 240.3 GWh |
#246 | Elara Solar | Pearsall, TX | 240.1 GWh |
#247 | Maverick Solar 4, LLC | Desert Center, CA | 239.2 GWh |
#248 | Willow Spring Solar, LLC | Rosamond, CA | 238.7 GWh |
#249 | Oak Trail Solar, LLC | Moyock, NC | 237.3 GWh |
#250 | West of the Pecos Solar | TBD, TX | 236.0 GWh |
#251 | Fish Springs | Reno, NV | 233.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alamo 6.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Run Wind | Rankin, TX | 699.0 GWh | 28.4 mi |
Buckthorn Westex | Ft. Stockton, TX | 383.3 GWh | 33.3 mi |
Castle Gap Solar Hybrid | McCarney, TX | 400.9 GWh | 18.1 mi |
CED Crane Solar | Crane, TX | 412.3 GWh | 18.2 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 12.1 mi |
East Pecos Solar | McCamey, TX | 242.3 GWh | 0.8 mi |
Emerald Grove | Crane, TX | 276.2 GWh | 8.7 mi |
Greasewood II LLC | Girvin, TX | 240.8 GWh | 21.3 mi |
Greasewood Solar | Fort Stockton, TX | 174.6 GWh | 13.1 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.1 TWh | 26.2 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 496.2 GWh | 15 mi |
Midway Solar - TX | Fort Stockton, TX | 326.8 GWh | 2.8 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh | 5.9 mi |
Pearl Solar | Fort Stockton, TX | 103.5 GWh | 0.4 mi |
RE Maplewood | McCamey, TX | 577.1 GWh | 1.4 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh | 16.3 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 20.6 mi |
Upton County Solar | McCamey, TX | 354.1 GWh | 17.2 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 9 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 9 mi |