Alabama Pine Pulp
2373 Lena Landegger Hwy. Co Rd, Perdue Hill, AL 36470Plant Summary Information
Alabama Pine Pulp is ranked #4 out of 85 black liquor power plants nationwide in terms of total annual net electricity generation.
Alabama Pine Pulp is comprised of 1 generator and generated 91.2 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Alabama Pine Pulp |
---|---|
Utility Name | Alabama River Cellulose LLC |
Location | Monroe County, AL |
Initial Operation Date | November 1991 |
Last Update | Sep 2024 |
Annual Generation | 407.9 GWh |
Annual Consumption | 12.9 M MMBtu |
Ranked #1,485 out of 11,852 Power Plants Nationwide | |
Ranked #4 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #33 out of 75 Alabama Power Plants | |
Ranked #1 out of 11 Alabama Black Liquor Power Plants | |
Fuel Types | Black Liquor : 93.5% Natural Gas : 5.2% Wood/Wood Waste Solids : 1.2% |
Map of Alabama Pine Pulp
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alabama Pine Pulp.
Monthly Net Generation for Alabama Pine Pulp
Alabama Pine Pulp Details
Summary Information | |
---|---|
Plant Name | Alabama Pine Pulp (54429) |
Plant Address | 2373 Lena Landegger Hwy. Co Rd, Perdue Hill, AL 36470 |
Utility | Alabama River Cellulose LLC (57356) |
Latitude, Longitude | 31.5825, -87.4889 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | November 1991 |
Annual Generation | 407.9 GWh |
Fuel Types | Black Liquor : 93.5% Natural Gas : 5.2% Wood/Wood Waste Solids : 1.2% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Paper Manufacturing (322) |
Sector | Industrial CHP (7) |
Water Source | Alabama River |
Ash Impoundment | No |
Transmission / Distribution Owner | Alabama Power Co (195) AL |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTH ALABAMA GAS |
Natural Gas Storage | No |
Generator GEN2 Details Operating November 1991
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 69 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 68.7 MW |
Winter Capacity | 70.1 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1991 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Alabama Pine Pulp Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | International Paper Savanna Mill | Savannah, GA | 695.5 GWh |
#2 | Sylvamo Corporation Eastover Facility | Eastover, SC | 560.1 GWh |
#3 | Ashdown | Ashdown, AR | 577.9 GWh |
#5 | Columbus MS | Columbus, MS | 457.7 GWh |
#6 | Jesup Plant | Jesup, GA | 483.2 GWh |
#7 | Leaf River Cellulose LLC | New Augusta, MS | 440.0 GWh |
#8 | International Paper Prattville Mill | Prattville, AL | 588.6 GWh |
#9 | Sappi Cloquet Mill | Cloquet, MN | 475.1 GWh |
#10 | International Paper Georgetown Mill | Georgetown, SC | 500.1 GWh |
#11 | Flint River Operations | Oglethorpe, GA | 448.4 GWh |
#12 | Port Wentworth Mill | Port Wentworth, GA | 433.2 GWh |
#13 | International Paper Pine Hill Mill | Pine Hill, AL | 448.8 GWh |
#14 | International Paper Riegelwood Mill | Riegelwood, NC | 328.2 GWh |
#15 | Mead Coated Board | Mahrt, AL | 757.7 GWh |
#16 | Covington Facility | Covington, VA | 683.3 GWh |
#17 | Fernandina Beach Mill | Fernandina Beach, FL | 560.2 GWh |
#18 | Georgia-Pacific Cedar Springs | Cedar Springs, GA | 581.9 GWh |
#19 | Georgia-Pacific Brewton Mill | Brewton, AL | 490.5 GWh |
#20 | Packaging Corp of America | Counce, TN | 410.8 GWh |
#21 | Mansfield Mill | Mansfield, LA | 812.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alabama Pine Pulp.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alabama River Pulp | Perdue Hill, AL | 302.9 GWh | 0 mi |
Barry | Bucks, AL | 13.0 TWh | 50.3 mi |
Cotton Creek Solar Energy Center | McDavid, FL | 141.7 GWh | 51.9 mi |
First City Solar Energy Center | McDavid, FL | 119.8 GWh | 46.6 mi |
Gantt | Andalusia, AL | 4.5 GWh | 60.7 mi |
Georgia-Pacific Brewton Mill | Brewton, AL | 490.5 GWh | 41.4 mi |
Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | 278.9 GWh | 54.5 mi |
Hog Bayou Energy Center | Mobile, AL | 953.3 GWh | 66.8 mi |
International Paper Pine Hill Mill | Pine Hill, AL | 448.8 GWh | 26.8 mi |
Jones Bluff | Selma, AL | 267.2 GWh | 65.8 mi |
Lowman Energy Center | Leroy, AL | 4.6 TWh | 25.7 mi |
McIntosh (AL) | McIntosh, AL | 745.7 GWh | 39.1 mi |
McWilliams | Gantt, AL | 3.0 TWh | 61 mi |
Millers Ferry | Camden, AL | 315.3 GWh | 36.2 mi |
OE_ALD | Wing, AL | 154.9 GWh | 66.2 mi |
Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh | 25 mi |
Point A | Andalusia, AL | 16.1 GWh | 59.2 mi |
Sparkleberry | Molino, FL | 103.9 GWh | 56.7 mi |
Washington County Cogeneration Facility | McIntosh, AL | 862.2 GWh | 37.4 mi |
WestRock Demopolis Mill | Demopolis, AL | 290.7 GWh | 66.6 mi |