Airport Solar
17819 Airport Road, Lakeview, OR 97630Plant Summary Information
Airport Solar is ranked #5 out of 114 solar farms in Oregon in terms of total annual net electricity generation.
Airport Solar generated 33.9 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Airport Solar |
---|---|
Utility Name | Airport Solar LLC |
Location | Lake County, OR |
Initial Operation Date | December 2019 |
Last Update | Sep 2024 |
Annual Generation | 102.4 GWh |
Annual Consumption | 382.8 k MMBtu |
Ranked #3,157 out of 11,852 Power Plants Nationwide | |
Ranked #596 out of 5,655 Solar Power Plants Nationwide | |
Ranked #59 out of 255 Oregon Power Plants | |
Ranked #5 out of 114 Oregon Solar Power Plants | |
Fuel Types | Solar |
Map of Airport Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Airport Solar.
Monthly Net Generation for Airport Solar
Airport Solar Details
Summary Information | |
---|---|
Plant Name | Airport Solar (62560) |
Plant Address | 17819 Airport Road, Lakeview, OR 97630 |
Utility | Airport Solar LLC (62051) |
Latitude, Longitude | 42.17018, -120.40232 |
Generation Dates on File | Dec 2019 to Sep 2024 |
Initial Operation Date | December 2019 |
Annual Generation | 102.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - West (PACW) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) OR |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator APS Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 47.3 MW |
Summer Capacity | 47.3 MW |
Winter Capacity | 47.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Other Solar Technology | No |
Azimuth Angle | 90 |
DC Net Capacity | 61 MW |
Crystalline Silicon | Yes |
Thin Film CDTE | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Airport Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#586 | Timber Road Solar Park | Payne, OH | 104.1 GWh |
#587 | Horseshoe Solar, LLC | Tooele, UT | 103.9 GWh |
#588 | Crystal Hill Solar | Crystal Hill, VA | 103.9 GWh |
#589 | Sparkleberry | Molino, FL | 103.9 GWh |
#590 | Grange Hall Solar | Wimauma, FL | 103.3 GWh |
#591 | Bladen Solar | Fayetteville, NC | 103.3 GWh |
#592 | Mountain View Solar (FL) | Dade City, FL | 103.2 GWh |
#593 | Landrace Holdings, LLC | Conway, SC | 102.9 GWh |
#594 | Woodyard | Clewiston, FL | 102.7 GWh |
#595 | Pavant Solar II LLC | Fillmore, UT | 102.4 GWh |
#597 | Iris Solar LLC | Franklinton, LA | 102.2 GWh |
#598 | Five Points Solar Park | Five Points, CA | 102.0 GWh |
#599 | Foothills Solar Plant Hybrid | Yuma, AZ | 101.5 GWh |
#600 | Pitts Dudik Solar | Hubbard, TX | 101.3 GWh |
#601 | Bullock Solar, LLC | Manson, NC | 101.0 GWh |
#602 | Meherrin Solar | Skippers, VA | 100.8 GWh |
#603 | Paddock Solar | Beloit, WI | 100.8 GWh |
#604 | Highest Power Solar, LLC | Louisburg, NC | 100.2 GWh |
#605 | Titan Solar | Deer Trail, CO | 100.2 GWh |
#606 | Salt City Solar Project - Hybrid | Circleville, OH | 100.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Airport Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BC Solar | Lakeview, OR | 17.0 GWh | 2.2 mi |
Black Cap Solar Plant | Lakeview, OR | 3.8 GWh | 2.1 mi |
Bly Solar Center | Bly, OR | 18.2 GWh | 35.3 mi |
C-Drop Hydro | Klamath Falls, OR | 1.1 GWh | 65.7 mi |
Chiloquin Solar, LLC | Chiloquin, OR | 19.2 GWh | 80.4 mi |
Garrett Solar | Lakeview, OR | 22.6 GWh | 0.7 mi |
Klamath Cogeneration Plant | Klamath Falls, OR | 3.7 TWh | 72.1 mi |
Klamath Expansion Project | Klamath Falls, OR | 184.3 GWh | 72.3 mi |
Klamath Falls Solar 2 CSG | Klamath Falls, OR | 6.0 GWh | 69.7 mi |
NorWest Energy 4, LLC | Bonanza, OR | 9.8 GWh | 71.6 mi |
Old Mill Solar | Bly, OR | 7.4 GWh | 33.1 mi |
OR Solar 3, LLC | Malin, OR | 23.3 GWh | 53.1 mi |
OR Solar 5, LLC | Merrill, OR | 18.0 GWh | 62.7 mi |
OR Solar 6, LLC | Lakeview, OR | 23.3 GWh | 3.2 mi |
OR Solar 8, LLC | Dairy, OR | 23.7 GWh | 60.8 mi |
Oregon University System OIT Klamath Falls | Klamath Falls, OR | 2.4 GWh | 71 mi |
Outback Solar At Christmas Valley | Christmas Valley, OR | 7.1 GWh | 73.8 mi |
Skysol | Merrill, OR | 98.1 GWh | 56.5 mi |
Sprague Hydro | Bly, OR | 1.8 GWh | 37.7 mi |
Woodline Solar | Dairy, OR | 17.4 GWh | 60.3 mi |