Agua Caliente Solar Project
67500 East Palomas Rd, Dateland, AZ 85333Plant Summary Information
Agua Caliente Solar Project is ranked #19 out of 5,655 solar farms nationwide in terms of total annual net electricity generation.
Agua Caliente Solar Project generated 194.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Agua Caliente Solar Project |
---|---|
Utility Name | Agua Caliente Solar |
Location | Yuma County, AZ |
Initial Operation Date | May 2012 |
Last Update | Sep 2024 |
Annual Generation | 675.2 GWh |
Annual Consumption | 2.5 M MMBtu |
Ranked #1,003 out of 11,852 Power Plants Nationwide | |
Ranked #19 out of 5,655 Solar Power Plants Nationwide | |
Ranked #28 out of 156 Arizona Power Plants | |
Ranked #3 out of 103 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Solar Energy LLC (2013 to 2013) Agua Caliente Solar (2014 to 2023) |
Map of Agua Caliente Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Agua Caliente Solar Project.
Monthly Net Generation for Agua Caliente Solar Project
Agua Caliente Solar Project Details
Summary Information | |
---|---|
Plant Name | Agua Caliente Solar Project (57373) |
Plant Address | 67500 East Palomas Rd, Dateland, AZ 85333 |
Utility | Agua Caliente Solar (59396) |
Latitude, Longitude | 32.9774, -113.4945 |
Generation Dates on File | Apr 2012 to Sep 2024 |
Initial Operation Date | May 2012 |
Annual Generation | 675.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator AGU2 Details Operating December 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 136 MW |
Summer Capacity | 136 MW |
Winter Capacity | 136 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 195 |
Tilt Angle | 15 |
DC Net Capacity | 141.6 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator AGU1 Details Operating May 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 90.7 MW |
Summer Capacity | 90.7 MW |
Winter Capacity | 90.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 195 |
Tilt Angle | 15 |
DC Net Capacity | 116.3 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator AGU3 Details Operating February 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 121 MW |
Summer Capacity | 121 MW |
Winter Capacity | 121 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 195 |
Tilt Angle | 15 |
DC Net Capacity | 140.7 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Agua Caliente Solar Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
MidAmerican Solar LLC | 1850 N Central, Phoenix, AZ 85004 | Generator AGU01 | 49.00% |
Agua Caliente Solar | 67500 Palomas Raod, Dateland, AZ 85333 | Generator AGU01 | 51.00% |
First Solar Project Development | 135 Main St., 6th Floor, San Francisco, CA 94105 | Generator AGU1 | 100.00% |
First Solar Project Development | 135 Main St., 6th Floor, San Francisco, CA 94105 | Generator AGU2 | 100.00% |
First Solar Project Development | 135 Main St., 6th Floor, San Francisco, CA 94105 | Generator AGU3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#9 | Solar Star 1 | Rosamond, CA | 870.3 GWh |
#10 | Daggett 3 | Daggett, CA | 857.5 GWh |
#11 | Solana Generating Station | Gila Bend, AZ | 823.1 GWh |
#12 | Juno Solar Project | Lamesa, TX | 793.4 GWh |
#13 | Prospero Solar | Andrews, TX | 747.8 GWh |
#14 | Neptune Energy Center Hybrid | Boone, CO | 701.6 GWh |
#15 | Solar Star 2 | Rosamond, CA | 708.8 GWh |
#16 | Copper Mountain Solar 5, LLC | Boulder City, NV | 691.5 GWh |
#17 | Slate Hybrid | Stratford, CA | 665.0 GWh |
#18 | IP Radian, LLC | Brookesmith, TX | 681.1 GWh |
#20 | Prospero Solar II | Andrews, TX | 675.0 GWh |
#21 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 653.6 GWh |
#22 | Texas Solar Nova 1 | Spur, TX | 666.4 GWh |
#23 | Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh |
#24 | Arlington Energy Center II | Blythe, CA | 628.1 GWh |
#25 | Silver State Solar Power South | Primm Valley, NV | 650.9 GWh |
#26 | Mojave Solar Project | Hinkley, CA | 627.0 GWh |
#27 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#28 | Stateline Solar | Nipton, CA | 618.5 GWh |
#29 | Arrow Canyon Solar Hybrid | Moapa, NV | 607.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Agua Caliente Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agave | AZ | 39.3 GWh | 44.8 mi |
Arlington Valley Energy Facility | Arlington, AZ | 3.5 TWh | 43.1 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh | 44.4 mi |
Gila Bend Hybrid | Gila Bend, AZ | 80.0 GWh | 35.6 mi |
Harquahala Generating Project | Tonopah, AZ | 2.7 TWh | 40.9 mi |
Hyder II Hybrid | Hyder, AZ | 30.3 GWh | 9.1 mi |
Hyder Solar Hybrid | Hyder, AZ | 40.2 GWh | 9.3 mi |
McFarland A Solar and Storage | Dateland, AZ | 378.2 GWh | 1.8 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 44.4 mi |
Mesquite Generating Station Block 2 | Arlington, AZ | 3.5 TWh | 44.4 mi |
Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh | 42.4 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 282.9 GWh | 41.7 mi |
Mesquite Solar 3, LLC | Tonopah, AZ | 465.9 GWh | 41.2 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 117.5 GWh | 41.1 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 113.8 GWh | 41.1 mi |
Red Hawk | Arlington, AZ | 3.8 TWh | 45.2 mi |
Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh | 33.1 mi |
Solana Generating Station | Gila Bend, AZ | 823.1 GWh | 31.5 mi |
Sun Streams 2 | Hassayampa, AZ | 311.6 GWh | 45.8 mi |
Sun Streams, LLC | Arlington, AZ | 418.3 GWh | 46 mi |