AES Petersburg
State Road 57, Petersburg, IN 47567Plant Summary Information
AES Petersburg is ranked #33 out of 129 coal plants nationwide in terms of total annual net electricity generation.
AES Petersburg is comprised of 5 generators and generated 744.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | AES Petersburg |
---|---|
Utility Name | AES Indiana |
Location | Pike County, IN |
Initial Operation Date | June 1967 |
Last Update | Sep 2024 |
Annual Generation | 3.2 TWh |
Annual Consumption | 40.8 M MMBtu |
Ranked #363 out of 11,852 Power Plants Nationwide | |
Ranked #33 out of 129 Bituminous Coal Power Plants Nationwide | |
Ranked #11 out of 198 Indiana Power Plants | |
Ranked #6 out of 14 Indiana Bituminous Coal Power Plants | |
Fuel Types | Bituminous Coal : 99.7% |
Previous Operator |
Indianapolis Power & Light Co (2013 to 2022) AES Indiana (2023 to 2023) |
Map of AES Petersburg
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for AES Petersburg.
Monthly Net Generation for AES Petersburg
AES Petersburg Details
Summary Information | |
---|---|
Plant Name | AES Petersburg (994) |
Plant Address | State Road 57, Petersburg, IN 47567 |
Utility | AES Indiana (9273) |
Latitude, Longitude | 38.5281, -87.2525 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | June 1967 |
Annual Generation | 3.2 TWh |
Fuel Types | Bituminous Coal : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | White River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Indianapolis Power & Light Co (9273) IN |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator IC1 Details Operating August 1967
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator IC2 Details Operating August 1967
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator IC3 Details Operating August 1967
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator ST3 Details Operating November 1977
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 670.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 527.6 MW |
Winter Capacity | 540.3 MW |
Minimum Load | 225 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1977 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Generator 4 Details Operating April 1986
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 670.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 529.6 MW |
Winter Capacity | 534.6 MW |
Minimum Load | 220 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1986 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
AES Petersburg Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#23 | Intermountain Power Project | Delta, UT | 4.4 TWh |
#24 | Marshall (NC) | Terrell, NC | 7.3 TWh |
#25 | Warrick | Newburgh, IN | 3.6 TWh |
#26 | Mt Storm | Mount Storm, WV | 3.6 TWh |
#27 | Hunter | Castle Dale, UT | 3.5 TWh |
#28 | James E. Rogers Energy Complex | Cliffside, NC | 5.6 TWh |
#29 | Merom | Sullivan, IN | 3.3 TWh |
#30 | Winyah | Georgetown, SC | 3.3 TWh |
#31 | Bonanza | Vernal, UT | 3.3 TWh |
#32 | Mitchell (WV) | Captina, WV | 3.3 TWh |
#34 | W H Sammis | Stratton, OH | 3.1 TWh |
#35 | Belews Creek | Belews Creek, NC | 8.9 TWh |
#36 | Seminole (FL) | Palatka, FL | 11.1 TWh |
#37 | Conemaugh | New Florence, PA | 2.8 TWh |
#38 | D B Wilson | Centertown, KY | 2.7 TWh |
#39 | Keystone | Shelocta, PA | 2.5 TWh |
#40 | Huntington | Huntington, UT | 2.4 TWh |
#41 | East Bend | Union, KY | 2.4 TWh |
#42 | Stanton Energy Center | Orlando, FL | 4.0 TWh |
#43 | E C Gaston | Wilsonville, AL | 3.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding AES Petersburg.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Crane Solar Facility | Crane, IN | 29.0 GWh | 28.1 mi |
Edwardsport | Edwardsport, IN | 2.7 TWh | 19.3 mi |
F B Culley | Newburgh, IN | 1.9 TWh | 42.8 mi |
Gibson | Owensville, IN | 9.9 TWh | 29.8 mi |
IMPA Huntingburg Solar Park | Huntingburg, IN | 2.8 GWh | 21.1 mi |
IMPA Washington Solar Park | Washington, IN | 2.7 GWh | 9 mi |
IMPA Washington Solar Park 2 | Washington, IN | 4.0 GWh | 10.7 mi |
Linton | Linton, IN | 10.6 GWh | 36.2 mi |
Merom | Sullivan, IN | 3.3 TWh | 39.9 mi |
New Haven Solar RES | Dale, IN | 1.6 GWh | 27.1 mi |
Oak Hill Solar Array | Evansville, IN | 3.4 GWh | 40.1 mi |
Rockport | Rockport, IN | 4.6 TWh | 43.2 mi |
Scotland Solar RES | Newberry, IN | 1.7 GWh | 31.1 mi |
Sullivan Solar, LLC | Sullivan, IN | 5.6 GWh | 42.6 mi |
Troy Solar | Troy, IN | 88.9 GWh | 43.4 mi |
Veolia ES Blackfoot Landfill Facility | Winslow, IN | 9.0 GWh | 14.2 mi |
Volkman Road Solar Array Hybrid | Evansville, IN | 2.2 GWh | 30.7 mi |
Warrick | Newburgh, IN | 3.6 TWh | 42.6 mi |
Wheatland Generating Facility | Wheatland, IN | 83.3 GWh | 10.2 mi |
Worthington Generation LLC | Worthington, IN | 58.9 GWh | 39.7 mi |