Aerojet II

Aerojet Rd & White Rock Rd, Rancho Cordova, CA 95670

Plant Summary Information

Aerojet II is ranked #466 out of 799 solar farms in California in terms of total annual net electricity generation.

Aerojet II generated 607.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameAerojet II
Utility NameAltus Power America Management, LLC
LocationSacramento County, CA
Initial Operation DateJune 2010
Last Update Dec 2023
Annual Generation 3.7 GWh
Annual Consumption 13.3 k MMBtu
Ranked #8,360 out of 11,835 Power Plants Nationwide
Ranked #3,314 out of 5,643 Solar Power Plants Nationwide
Ranked #1,167 out of 1,569 California Power Plants
Ranked #466 out of 799 California Solar Power Plants
Fuel Types Solar
Previous Operator Solar Power Inc. (2013 to 2016)
Altus Power America Management, LLC (2017 to 2023)

Map of Aerojet II

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Aerojet II.

Create Your Account Today

Monthly Net Generation for Aerojet II

Aerojet II Details

Summary Information
Plant NameAerojet II (57698)
Plant AddressAerojet Rd & White Rock Rd, Rancho Cordova, CA 95670
UtilityAltus Power America Management, LLC (60281)
Latitude, Longitude38.6086, -121.1703
Generation Dates on FileJan 2011 to Dec 2023
Initial Operation DateJune 2010
Annual Generation 3.7 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityBalancing Authority of Northern California (BANC)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSacramento Municipal Util Dist (16534) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator 1 Details Operating June 2010

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.2 MW
Summer Capacity2.2 MW
Winter Capacity2.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2010
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Solar Details
Single Axis TrackingYes
Azimuth Angle225
Tilt Angle45
DC Net Capacity2.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Aerojet II Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3304Bridgewater Solar CSGBridgewater, MA3.8 GWh
#3305Alethea IEastampton, NJ3.8 GWh
#3306Washington CountyWest Bend, WI3.8 GWh
#3307Platt HillWinchester, CT3.7 GWh
#3308Red Toad 1425 A Powatan Road, LLCClayton, NC3.7 GWh
#3309Woodlawn II (CSG)Crete, IL3.7 GWh
#3310Silverton SolarSilverton, OR3.7 GWh
#3311ISM Solar Dighton 2, LLC CSGDighton, MA3.7 GWh
#3312SSD Marion 6, LLCAurora, OR3.7 GWh
#3313Castalia SolarCastalia, NC3.7 GWh
#3315NSE Camber BH CSG 2, LLCOrdway, CO3.7 GWh
#3316McCleskey CottonDawson, GA3.7 GWh
#3317Bloom SolarSummerton, SC3.7 GWh
#3318IMPA Anderson Solar ParkAnderson, IN3.7 GWh
#3319Hampton MN GREHampton Township, MN3.7 GWh
#3320Mill Creek Solar (OR)Sheridan, OR3.7 GWh
#3321ChangeupAsheboro, NC3.7 GWh
#3322Tissington SolarVernon Township, NJ3.7 GWh
#3323SCS Galena 012589 Peoria, LLCPeoria, IL3.7 GWh
#3324Solar Las Vegas MB 2, LLCLas Vegas, NV3.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Aerojet II.

Plant NamePlant LocationAnnual GenerationDistance
Aerojet IRancho Cordova, CA5.9 GWh0.5 mi
Blue Shld Of Cal- El Dorado Hlls Mtr BEl Dorado Hills, CA3.0 GWh5.9 mi
Broadridge CogenEl Dorado Hills, CA19.3 GWh6.2 mi
Deer Creek 2Shingle Springs, CA2.7 GWh10.1 mi
Dept of General Services -FTBSacramento, CA5.3 GWh9.8 mi
El Dorado Solar, LLCEl Dorado Hills, CA3.3 GWh6.3 mi
FAA NorCal TRACONMather AFB, CA1.2 GWh5.8 mi
FolsomFolsom, CA648.5 GWh6.8 mi
Folsom SP and CSP SacramentoRepresa, CA611.0 MWh5.4 mi
Intel FolsomFolsom, CA1.4 GWh2.5 mi
Intel Folsom Phase 2Folsom, CA1.7 GWh2.4 mi
Intel Folsom Phase 3Folsom, CA8.7 GWh2.6 mi
Kiefer LandfillSloughhouse, CA66.6 GWh6.7 mi
McClellan (CA)Sacramento, CA2.5 GWh12.4 mi
NimbusFolsom, CA69.9 GWh3.3 mi
Rancho Cordova Medical OfficesRancho Cordova, CA2.2 GWh6.9 mi
RE Dillard 1 LLCSloughhouse, CA6.2 GWh9.7 mi
RE Dillard 2 LLCSloughhouse, CA6.2 GWh9.9 mi
RE Dillard 3 LLCSloughhouse, CA6.2 GWh10.1 mi
US GSA - SacramentoSacramento, CA2.2 GWh12.3 mi