Aerojet I
Aerojet Rd & White Rock Rd, Rancho Cordova, CA 95670Plant Summary Information
Aerojet I is ranked #379 out of 799 solar farms in California in terms of total annual net electricity generation.
Aerojet I generated 924.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Aerojet I |
---|---|
Utility Name | Altus Power America Management, LLC |
Location | Sacramento County, CA |
Initial Operation Date | December 2009 |
Last Update | Dec 2023 |
Annual Generation | 5.9 GWh |
Annual Consumption | 20.9 k MMBtu |
Ranked #7,311 out of 11,835 Power Plants Nationwide | |
Ranked #2,556 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,023 out of 1,569 California Power Plants | |
Ranked #379 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Solar Power Inc. (2013 to 2016) Altus Power America Management, LLC (2017 to 2023) |
Map of Aerojet I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Aerojet I.
Monthly Net Generation for Aerojet I
Aerojet I Details
Summary Information | |
---|---|
Plant Name | Aerojet I (57697) |
Plant Address | Aerojet Rd & White Rock Rd, Rancho Cordova, CA 95670 |
Utility | Altus Power America Management, LLC (60281) |
Latitude, Longitude | 38.61351, -121.16288 |
Generation Dates on File | Jan 2011 to Dec 2023 |
Initial Operation Date | December 2009 |
Annual Generation | 5.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Balancing Authority of Northern California (BANC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating December 2009
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 225 |
Tilt Angle | 45 |
DC Net Capacity | 3.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Aerojet I Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2546 | Garfield Solar | Garfield Township, NJ | 5.9 GWh |
#2547 | Waterloo Solar (IA) | Waterloo, IA | 5.9 GWh |
#2548 | Kramer Solar CSG | Hector, MN | 5.9 GWh |
#2549 | Progress Solar III, LLC | Maxton, NC | 5.9 GWh |
#2550 | CSWIND America Inc. | Pueblo, CO | 5.9 GWh |
#2551 | Kinsley II Landfill Solar System | Sewell, NJ | 5.9 GWh |
#2552 | Desert Hot Springs Solar | Desert Hot Springs, CA | 5.9 GWh |
#2553 | TWE Chocowinity Solar, LLC | Chocowinity, NC | 5.9 GWh |
#2554 | Wayne Solar II LLC | Goldsboro, NC | 5.9 GWh |
#2555 | Palmer | Palmer, MA | 5.9 GWh |
#2557 | GSPP Terrawatt Westfield LLC CSG | Westfield, MA | 5.9 GWh |
#2558 | DOCCS Greenhaven | Stormville, NY | 5.9 GWh |
#2559 | Bird Machine Solar Farm | South Walpole, MA | 5.9 GWh |
#2560 | Sawtell Solar | Hendersonville, NC | 5.9 GWh |
#2561 | St. Pauls Solar 1, LLC | St. Pauls, NC | 5.9 GWh |
#2562 | Chisago Community Solar | Taylor Falls, MN | 5.9 GWh |
#2563 | CNE at Cambridge MD | Cambridge, MD | 5.9 GWh |
#2564 | Meriwether Jackson | Machester, GA | 5.9 GWh |
#2565 | Cedar Valley Solar Plant | Cedar City, UT | 5.9 GWh |
#2566 | Ennis Solar, LLC | Lillington, NC | 5.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Aerojet I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aerojet II | Rancho Cordova, CA | 3.7 GWh | 0.5 mi |
Blue Shld Of Cal- El Dorado Hlls Mtr B | El Dorado Hills, CA | 3.0 GWh | 5.4 mi |
Broadridge Cogen | El Dorado Hills, CA | 19.3 GWh | 5.8 mi |
Deer Creek 2 | Shingle Springs, CA | 2.7 GWh | 9.7 mi |
Dept of General Services -FTB | Sacramento, CA | 5.3 GWh | 10.3 mi |
El Dorado Solar, LLC | El Dorado Hills, CA | 3.3 GWh | 5.8 mi |
FAA NorCal TRACON | Mather AFB, CA | 1.2 GWh | 6.3 mi |
Folsom | Folsom, CA | 648.5 GWh | 6.4 mi |
Folsom SP and CSP Sacramento | Represa, CA | 611.0 MWh | 5.1 mi |
Intel Folsom | Folsom, CA | 1.4 GWh | 2.3 mi |
Intel Folsom Phase 2 | Folsom, CA | 1.7 GWh | 2.1 mi |
Intel Folsom Phase 3 | Folsom, CA | 8.7 GWh | 2.2 mi |
Kiefer Landfill | Sloughhouse, CA | 66.6 GWh | 7.1 mi |
McClellan (CA) | Sacramento, CA | 2.5 GWh | 12.7 mi |
Nimbus | Folsom, CA | 69.9 GWh | 3.5 mi |
Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.2 GWh | 7.4 mi |
RE Dillard 1 LLC | Sloughhouse, CA | 6.2 GWh | 10.1 mi |
RE Dillard 2 LLC | Sloughhouse, CA | 6.2 GWh | 10.2 mi |
RE Dillard 3 LLC | Sloughhouse, CA | 6.2 GWh | 10.5 mi |
US GSA - Sacramento | Sacramento, CA | 2.2 GWh | 12.7 mi |