Adelanto Solar Project
16800 Aster Road, Adelanto, CA 92301Plant Summary Information
Adelanto Solar Project is ranked #290 out of 807 solar farms in California in terms of total annual net electricity generation.
Adelanto Solar Project generated 2.8 GWh during the 3-month period between January 2023 to April 2023.
Plant Name | Adelanto Solar Project |
---|---|
Utility Name | Los Angeles Department of Water & Power |
Location | San Bernardino County, CA |
Initial Operation Date | June 2012 |
Last Update | Apr 2023 |
Annual Generation | 11.5 GWh |
Annual Consumption | 42.9 k MMBtu |
Ranked #5,786 out of 11,979 Power Plants Nationwide | |
Ranked #1,504 out of 5,765 Solar Power Plants Nationwide | |
Ranked #810 out of 1,578 California Power Plants | |
Ranked #290 out of 807 California Solar Power Plants | |
Fuel Types | Solar |
Map of Adelanto Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Adelanto Solar Project.
Monthly Net Generation for Adelanto Solar Project
Adelanto Solar Project Details
Summary Information | |
---|---|
Plant Name | Adelanto Solar Project (57305) |
Plant Address | 16800 Aster Road, Adelanto, CA 92301 |
Utility | Los Angeles Department of Water & Power (11208) |
Latitude, Longitude | 34.55083, -117.43528 |
Generation Dates on File | Jun 2012 to Apr 2023 |
Initial Operation Date | June 2012 |
Annual Generation | 11.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Intermountain Power Agency (40576) |
Grid Voltage | 4.16 kV |
Energy Storage | No |
Generator 1 Details Operating June 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 6.8 MW |
Summer Capacity | 6.8 MW |
Winter Capacity | 6.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 11.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Adelanto Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1494 | Whiskey Solar | Cumberland, NC | 11.8 GWh |
#1495 | Pitkin County Solar | Aspen, CO | 11.8 GWh |
#1496 | SCDA Solar 1 | Sacramento, CA | 11.8 GWh |
#1497 | Wilson Solar Farm 6 | Wilson, NC | 11.7 GWh |
#1498 | Exelon Solar Chicago | Chicago, IL | 11.6 GWh |
#1499 | Stafford St Solar 1 CSG | Leicester, MA | 11.6 GWh |
#1500 | Chisago Solar | North Branch, MN | 11.6 GWh |
#1501 | RE McKenzie 1 LLC | Galt, CA | 11.6 GWh |
#1502 | RE McKenzie 3 LLC | Galt, CA | 11.6 GWh |
#1503 | Kearney NPPD Solar Project | Kearney, NE | 11.5 GWh |
#1505 | RE McKenzie 4 LLC | Galt, CA | 11.5 GWh |
#1506 | RE McKenzie 2 LLC | Galt, CA | 11.5 GWh |
#1507 | Flemington Solar | Flemington, NJ | 11.5 GWh |
#1508 | Coogee Solar | Grantsboro, NC | 11.5 GWh |
#1509 | JMB Mcguire-Dix-Lakehurst Solar Project | McGuire AFB, NJ | 11.5 GWh |
#1510 | RE McKenzie 5 LLC | Galt, CA | 11.4 GWh |
#1511 | NorWest Energy 9 LLC | Pendleton, OR | 11.4 GWh |
#1512 | RE McKenzie 6 LLC | Galt, CA | 11.4 GWh |
#1513 | Kinsley Landfill Solar | Sewell, NJ | 11.4 GWh |
#1514 | Antelope Expansion 3B | Lancaster, CA | 11.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Adelanto Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adelanto Solar II, LLC | Adelanto, CA | 17.0 GWh | 3.3 mi |
Adelanto Solar, LLC | Adelanto, CA | 54.9 GWh | 3.3 mi |
Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 173.0 MWh | 4.2 mi |
Baldy Mesa Solar & Storage | Adelanto, CA | 43.8 GWh | 4.2 mi |
Coronus Adelanto West 1 | Adelanto, CA | 3.4 GWh | 1.7 mi |
Coronus Adelanto West 2 | Adelanto, CA | 3.4 GWh | 1.7 mi |
Expressway Solar A | Victorville, CA | 3.8 GWh | 5.8 mi |
Expressway Solar B | Victorville, CA | 4.1 GWh | 5.9 mi |
Expressway Solar C2 | Victorville, CA | 3.5 GWh | 5.8 mi |
Foundation Cemex River Plant | Victorville, CA | 3.3 GWh | 7.3 mi |
High Desert Power Plant | Victorville, CA | 4.5 TWh | 5.1 mi |
Hudson - High Desert Hybrid | Victorville, CA | 285.5 GWh | 6.9 mi |
Industry Solar Power Generation Station 1 LLC | Adelanto, CA | 4.2 GWh | 1.2 mi |
RE Victor Phelan Solar One LLC | Adelanto, CA | 39.5 GWh | 3.6 mi |
Victor Dry Farm Ranch A | Victorville, CA | 8.8 GWh | 3.9 mi |
Victor Dry Farm Ranch B | Victorville, CA | 9.4 GWh | 4.2 mi |
Victor Mesa Linda B2 | Victorville, CA | 2.1 GWh | 3.8 mi |
Victor Mesa Linda C2 | Victorville, CA | 2.0 GWh | 3.9 mi |
Victor Mesa Linda D2 | Victorville, CA | 3.7 GWh | 4 mi |
Victor Mesa Linda E2 | Victorville, CA | 3.6 GWh | 4 mi |