Acadia Energy Center
30385 Crowley-Eunice Hwy, Eunice, LA 70535Plant Summary Information
Acadia Energy Center is ranked #5 out of 77 power plants in Louisiana in terms of total annual net electricity generation.
Acadia Energy Center is comprised of 6 generators and generated 1.3 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Acadia Energy Center |
---|---|
Utility Name | Cleco Power LLC |
Location | Acadia Parish, LA |
Initial Operation Date | July 2002 |
Last Update | Sep 2024 |
Annual Generation | 5.5 TWh |
Annual Consumption | 47.3 M MMBtu |
Ranked #192 out of 11,852 Power Plants Nationwide | |
Ranked #91 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #5 out of 77 Louisiana Power Plants | |
Ranked #4 out of 54 Louisiana Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Acadia Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Acadia Energy Center.
Monthly Net Generation for Acadia Energy Center
Acadia Energy Center Details
Summary Information | |
---|---|
Plant Name | Acadia Energy Center (55173) |
Plant Address | 30385 Crowley-Eunice Hwy, Eunice, LA 70535 |
Utility | Cleco Power LLC (3265) |
Latitude, Longitude | 30.42861, -92.41306 |
Generation Dates on File | May 2002 to Sep 2024 |
Initial Operation Date | July 2002 |
Annual Generation | 5.5 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Cleco Power LLC (3265) LA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name |
ANR PIPELINE COMPANY FLORIDA GAS TRANSMISSION COMPANY Other - Please explain in pipeline notes below. |
Pipeline Notes | Pine Prairie Energy Center LLC |
Natural Gas Storage | No |
Generator CT11 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CLEC.ACA12 |
Nameplate Capacity | 215.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 170.8 MW |
Minimum Load | 105.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT12 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CLEC.ACA13 |
Nameplate Capacity | 215.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 167.1 MW |
Minimum Load | 105.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST13 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PB01 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | CLEC.ACA11 |
Nameplate Capacity | 264.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.6 MW |
Minimum Load | 72 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CT24 Details Operating August 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB02 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | EES.ACAD2-CT1 |
Nameplate Capacity | 215.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 144.6 MW |
Winter Capacity | 154.2 MW |
Minimum Load | 105.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT25 Details Operating August 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB02 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | EES.ACAD2-CT2 |
Nameplate Capacity | 215.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 143.5 MW |
Winter Capacity | 153 MW |
Minimum Load | 105.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST26 Details Operating August 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PB02 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
RTO ISO LMP Node Designation | EES.ACAD2-ST |
Nameplate Capacity | 264.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 242.3 MW |
Winter Capacity | 242.5 MW |
Minimum Load | 72 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Acadia Energy Center Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Entergy Corp | 639 Loyola Avenue, New Orleans, LA 70113 | Generator CT24 | 100.00% |
Entergy Corp | 639 Loyola Avenue, New Orleans, LA 70113 | Generator CT25 | 100.00% |
Entergy Corp | 639 Loyola Avenue, New Orleans, LA 70113 | Generator ST26 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#81 | Lake Road Generating Plant | Dayville, CT | 5.7 TWh |
#82 | Hickory Run Energy Station | New Castle, PA | 5.7 TWh |
#83 | E B Harris Electric Generating Plant | Autaugaville, AL | 5.7 TWh |
#84 | Oneta Energy Center | Broken Arrow, OK | 5.7 TWh |
#85 | Cottonwood Energy Project | Deweyville, TX | 5.6 TWh |
#86 | St Joseph Energy Center | New Carlisle, IN | 5.6 TWh |
#87 | Channelview Cogeneration Plant | Channelview, TX | 5.6 TWh |
#88 | Choctaw County | French Camp, MS | 5.6 TWh |
#89 | Sithe Independence Station | Oswego, NY | 5.6 TWh |
#90 | Zeeland Generating Station | Zeeland, MI | 5.6 TWh |
#92 | Fayette Energy Facility | Masontown, PA | 5.4 TWh |
#93 | CPV Towantic Energy Center | Oxford, CT | 5.3 TWh |
#94 | Eagle Valley (IN) | Martinsville, IN | 5.3 TWh |
#95 | Carroll County Energy | Carrollton, OH | 5.3 TWh |
#96 | Hays Energy Project | San Marcos, TX | 5.3 TWh |
#97 | Baytown Energy Center | Baytown, TX | 5.2 TWh |
#98 | PSEG Linden Generating Station | Linden, NJ | 5.2 TWh |
#99 | Port Everglades | Ft. Lauderdale, FL | 5.2 TWh |
#100 | St. Charles Power Station (LA) | La Place, LA | 5.1 TWh |
#101 | Washington Energy Facility | Beverly, OH | 5.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Acadia Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agrilectric Power Partners Ltd | Lake Charles, LA | 84.7 GWh | 45.4 mi |
Bayou Cove Peaking Power | Jennings, LA | 106.1 GWh | 15 mi |
Calcasieu | Sulphur, LA | 104.4 GWh | 58.6 mi |
CITGO Refinery Powerhouse | Sulphur, LA | 174.4 GWh | 56.9 mi |
Coughlin Power Station | St Landry, LA | 4.5 TWh | 30.1 mi |
D G Hunter | Alexandria, LA | 117.8 GWh | 61.7 mi |
Elizabeth Solar Plant | Pitkin, LA | 54.8 GWh | 42.8 mi |
Hargis-Hebert Electric Generating | Lafayette, LA | 46.0 GWh | 30.8 mi |
Ivanhoe Generation Facility | Franklin, LA | 32.9 GWh | 60.5 mi |
LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 112.1 GWh | 64.5 mi |
Lake Charles Plant | Sulphur, LA | 154.8 GWh | 58.3 mi |
Lake Charles Polymers | Westlake, LA | 197.6 GWh | 56.5 mi |
Lake Charles Power | West Lake, LA | 5.9 TWh | 53.3 mi |
Oxbow Solar 1 | New Roads, LA | 175.6 GWh | 63 mi |
PPG Plant C Caustic | Lake Charles, LA | 6.0 GWh | 54.3 mi |
PPG Powerhouse C | Lake Charles, LA | 1.4 TWh | 54.4 mi |
PPG Riverside | Lake Charles, LA | 98.5 GWh | 53.7 mi |
R S Nelson | Westlake, LA | 1.4 TWh | 53.3 mi |
RS Cogen | Lake Charles, LA | 2.3 TWh | 53.8 mi |
T J Labbe Electric Generating | Lafayette, LA | 46.5 GWh | 25.1 mi |