85 A
Unnamed Road, Tehachapi, CA 93561Plant Summary Information
85 A is ranked #58 out of 108 wind farms in California in terms of total annual net electricity generation.
85 A generated 10.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | 85 A |
---|---|
Utility Name | Wind Wall 1 LLC |
Location | Kern County, CA |
Initial Operation Date | January 1985 |
Last Update | Dec 2023 |
Annual Generation | 62.9 GWh |
Annual Consumption | 227.0 k MMBtu |
Ranked #3,643 out of 11,852 Power Plants Nationwide | |
Ranked #933 out of 1,345 Wind Power Plants Nationwide | |
Ranked #425 out of 1,570 California Power Plants | |
Ranked #58 out of 108 California Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
AES Wind Generation Inc (2013 to 2017) Tehachapi Wind Wall, LLC (2018 to 2019) Wind Wall 1 LLC (2020 to 2023) |
Map of 85 A
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 85 A.
Monthly Net Generation for 85 A
85 A Details
Summary Information | |
---|---|
Plant Name | 85 A (52162) |
Plant Address | Unnamed Road, Tehachapi, CA 93561 |
Utility | Wind Wall 1 LLC (64311) |
Latitude, Longitude | 35.0958, -118.32477 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1985 |
Annual Generation | 62.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 85-687-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Generator MON1 Details Operating March 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 21.3 MW |
Summer Capacity | 21.3 MW |
Winter Capacity | 21.3 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 6 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 6 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V126-3.45 |
Design Wind Speed | 26.8 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 285.4 |
85 A Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#923 | Oak Tree Energy | Clark, SD | 66.7 GWh |
#924 | Antrim Wind | Antrim, NH | 66.5 GWh |
#925 | Gordon Butte Wind LLC | Martinsdale, MT | 66.5 GWh |
#926 | Sheffield Wind | Sheffield, VT | 66.3 GWh |
#927 | Big Turtle Wind Farm, LLC | Harbor Beach, MI | 66.1 GWh |
#928 | Condon Windpower LLC | Condon, OR | 65.5 GWh |
#929 | Brule County Wind | Kimball, SD | 64.6 GWh |
#930 | Blue Canyon Windpower | Carnegie, OK | 64.4 GWh |
#931 | Red Horse 2 | Willcox, AZ | 200.4 GWh |
#932 | Camp Reed | Glenns Ferry, ID | 63.7 GWh |
#934 | Big Spring Wind Power Facility | Big Spring, TX | 62.5 GWh |
#935 | Big Turtle Wind Farm 2 | Harbor Beach, MI | 62.1 GWh |
#936 | San Gorgonio Farms Wind Farm | Whitewater, CA | 61.8 GWh |
#937 | Vansycle | Touchet, OR | 61.7 GWh |
#938 | Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh |
#939 | Yahoo Creek | Hagerman, ID | 60.9 GWh |
#940 | Lempster Wind LLC | Lempster, NH | 59.9 GWh |
#941 | Payne's Ferry | Hagerman, ID | 59.8 GWh |
#942 | Steel Winds Wind Farm | Lackawanna, NY | 59.5 GWh |
#943 | New England Wind LLC | Florida, MA | 59.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 85 A.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
85 B | Tehachapi, CA | 86.9 GWh | 0.6 mi |
Alta Wind XI | Mojave, CA | 247.6 GWh | 4.3 mi |
Cameron Ridge LLC | Mojave, CA | 125.1 GWh | 1.5 mi |
Coram Energy LLC | Tehachapi, CA | 36.3 GWh | 1.7 mi |
Coram Energy LLC (ECT) | Tehachapi, CA | 32.0 GWh | 2.8 mi |
Coram Tehachapi | Tehachapi, CA | 4.3 GWh | 2.2 mi |
Helzel & Schwarzhoff 86 | Tehachapi, CA | 2.7 GWh | 4 mi |
Oasis Alta | Mojave, CA | 45.4 GWh | 3.1 mi |
Oasis Wind | Mojave, CA | 205.4 GWh | 3 mi |
Point Wind | Tehachapi, CA | 237.2 GWh | 2.3 mi |
Ridgetop | Mojave, CA | 119.5 GWh | 1.6 mi |
Ridgetop Energy LLC | Mojave, CA | 31.1 GWh | 1.9 mi |
Tehachapi Wind Resource II | Tehachapi, CA | 42.1 GWh | 1 mi |
Terra-Gen VG Wind LLC | Tehachapi, CA | 4.8 GWh | 3.4 mi |
Victory Garden (Tehachapi) | Tehachapi, CA | 25.3 GWh | 3.8 mi |
Voyager Wind I | Mojave, CA | 373.8 GWh | 4.2 mi |
Voyager Wind II | Mojave, CA | 476.7 GWh | 3.5 mi |
Voyager Wind III | Mojave, CA | 143.5 GWh | 4.2 mi |
Windstar 1 | Tehachapi, CA | 192.5 GWh | 3.3 mi |
ZCO | Tehachapi, CA | 1.1 GWh | 3.4 mi |