71 Charlotte Furnace Rd Hybrid(CSG)
71 Charlotte Furnace Rd, Wareham, MA 2576Plant Summary Information
71 Charlotte Furnace Rd Hybrid(CSG) is ranked #71 out of 487 solar farms in Massachusetts in terms of total annual net electricity generation.
71 Charlotte Furnace Rd Hybrid(CSG) generated 1.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | 71 Charlotte Furnace Rd Hybrid(CSG) |
---|---|
Utility Name | 71CFR WHAM8 Solar, LLC |
Location | Plymouth County, MA |
Initial Operation Date | December 2021 |
Last Update | Dec 2023 |
Annual Generation | 6.8 GWh |
Annual Consumption | 23.8 k MMBtu |
Ranked #7,018 out of 11,852 Power Plants Nationwide | |
Ranked #2,334 out of 5,655 Solar Power Plants Nationwide | |
Ranked #150 out of 598 Massachusetts Power Plants | |
Ranked #71 out of 487 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of 71 Charlotte Furnace Rd Hybrid(CSG)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 71 Charlotte Furnace Rd Hybrid(CSG).
Monthly Net Generation for 71 Charlotte Furnace Rd Hybrid(CSG)
71 Charlotte Furnace Rd Hybrid(CSG) Details
Summary Information | |
---|---|
Plant Name | 71 Charlotte Furnace Rd Hybrid(CSG) (65054) |
Plant Address | 71 Charlotte Furnace Rd, Wareham, MA 2576 |
Utility | 71CFR WHAM8 Solar, LLC (64470) |
Latitude, Longitude | 41.79711, -70.7416 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | December 2021 |
Annual Generation | 6.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
Grid Voltage | 22.80 kV |
Energy Storage | Yes |
Generator 71CBA Details Operating December 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 5.4 |
---|---|
Maximum Charge Rate | 1 MW |
Maximum Discharge Rate | 1 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.3 |
Storage Enclosure Type | CS |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 65054 |
Direct Support Gen Id | 71CPV |
Support T D Asset | Yes |
Generator 71CPV Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 2.5 MW |
71 Charlotte Furnace Rd Hybrid(CSG) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2324 | Nash 64 Farm | Spring Hope, NC | 6.9 GWh |
#2325 | Old Wardour Solar | East Brookfield, MA | 6.9 GWh |
#2326 | Vuelta Solar | East Brookfield, MA | 6.9 GWh |
#2327 | Townline Community Solar | Batavia, NY | 6.9 GWh |
#2328 | GMP Solar/Storage-Essex Hybrid | Essex, VT | 7.5 GWh |
#2329 | American Goldfinch SCS ACY2 NJ, LLC | Burlington, NJ | 6.9 GWh |
#2330 | PopeSun CSG, LLC | Starbuck, MN | 6.9 GWh |
#2331 | Solar Photovoltaic Project #42 | Tulare, CA | 6.9 GWh |
#2332 | Fiddler's Canyon #1 | Cedar City, UT | 6.9 GWh |
#2333 | CSU Long Beach Lots 7 & 14 | Long Beach, CA | 6.9 GWh |
#2335 | Blackjack Solar | King City, CA | 6.9 GWh |
#2336 | Sweden 1 | Sweden, NY | 6.9 GWh |
#2337 | Ravenbrook | Carver, MA | 6.9 GWh |
#2338 | Hemings Solar | Warsaw, VA | 6.9 GWh |
#2339 | True North | Salisbury, MA | 6.9 GWh |
#2340 | Pine Tree Solar Project | Owenyo, CA | 6.9 GWh |
#2341 | Upper Blackstone (MA) Treasure Valley | Rutland, MA | 6.9 GWh |
#2342 | Montrose Solar | Montrose, MN | 6.9 GWh |
#2343 | South Goshen Community Solar | Goshen, NY | 6.7 GWh |
#2344 | Elizabeth Mines Solar 1 | So. Strafford, VT | 6.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 71 Charlotte Furnace Rd Hybrid(CSG).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
0 Hammond St CSG | Carver, MA | 7.0 GWh | 1.1 mi |
160 Tihonet Rd Hybrid(CSG) | Wareham, MA | 9.8 GWh | 1.5 mi |
196 Tremont St(CSG) | Carver, MA | 3.7 GWh | 3.2 mi |
276 Federal Rd(CSG) | Carver, MA | 4.7 GWh | 1 mi |
299 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 7.9 GWh | 0.8 mi |
59 Federal Rd(CSG) | Carver, MA | 12.8 GWh | 2.4 mi |
77 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 11.0 GWh | 1 mi |
Acushnet AD Makepeace | Wareham, MA | 5.8 GWh | 0.2 mi |
BWC Gibbs Brook | Wareham, MA | 6.6 GWh | 2.8 mi |
BWC Harlow Brook | Wareham, MA | 2.1 GWh | 2.8 mi |
BWC Pocasset River | Wareham, MA | 2.3 GWh | 3 mi |
BWC Wareham River | Wareham, MA | 1.8 GWh | 2.7 mi |
Cranberry Highway Solar LLC | Wareham, MA | 3.1 GWh | 0.7 mi |
Federal Road Solar 1, LLC CSG | South Carver, MA | 16.5 GWh | 1.1 mi |
Old Middleboro Road Solar | Rochester, MA | 9.7 GWh | 4.1 mi |
SEMASS Resource Recovery | West Wareham, MA | 568.8 GWh | 2.4 mi |
Syncarpha Freetown | Freetown, MA | 6.6 GWh | 3 mi |
Tihonet Solar | Wareham, MA | 1.8 GWh | 1.2 mi |
Wareham MA 1 Community Solar | Wareham, MA | 3.1 GWh | 1.9 mi |
Wareham Solar PV | Wareham, MA | 1.2 GWh | 1.3 mi |