2W Permian Solar Project Hybrid
8038 SW 1501, Andrews, TX 79714Plant Summary Information
2W Permian Solar Project Hybrid is ranked #6 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
2W Permian Solar Project Hybrid generated 306.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | 2W Permian Solar Project Hybrid |
---|---|
Utility Name | 2W Permian Solar, LLC |
Location | Andrews County, TX |
Initial Operation Date | August 2021 |
Last Update | Aug 2024 |
Annual Generation | 902.8 GWh |
Annual Consumption | 3.5 M MMBtu |
Ranked #796 out of 11,835 Power Plants Nationwide | |
Ranked #6 out of 5,643 Solar Power Plants Nationwide | |
Ranked #131 out of 749 Texas Power Plants | |
Ranked #2 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of 2W Permian Solar Project Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2W Permian Solar Project Hybrid.
Monthly Net Generation for 2W Permian Solar Project Hybrid
2W Permian Solar Project Hybrid Details
Summary Information | |
---|---|
Plant Name | 2W Permian Solar Project Hybrid (63255) |
Plant Address | 8038 SW 1501, Andrews, TX 79714 |
Utility | 2W Permian Solar, LLC (63012) |
Latitude, Longitude | 32.11639, -102.52833 |
Generation Dates on File | Apr 2021 to Aug 2024 |
Initial Operation Date | August 2021 |
Annual Generation | 902.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator 2WPBA Details Operating October 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 40 |
---|---|
Maximum Charge Rate | 40 MW |
Maximum Discharge Rate | 40 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 13.1 |
Storage Enclosure Type | BL |
Arbitrage | Yes |
Frequency Regulation | Yes |
Ramping Spinning Reserve | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 62355 |
Direct Support Gen Id | 2WPSO |
Support T D Asset | No |
Generator 2WPSO Details Operating August 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 420 MW |
Summer Capacity | 420 MW |
Winter Capacity | 420 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 520 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
2W Permian Solar Project Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh |
#2 | Gemini Solar | Unincorporated, NV | 1.0 TWh |
#3 | Roadrunner, LLC Hybrid | McCamey, TX | 990.1 GWh |
#4 | Sonoran Solar Energy | Buckeye, AZ | 881.3 GWh |
#5 | Eagle Shadow Mountain Solar Farm | Moapa River Indian Re, NV | 908.6 GWh |
#7 | Roseland Solar Project, LLC | Riesel, TX | 875.9 GWh |
#8 | Solar Star 1 | Rosamond, CA | 868.6 GWh |
#9 | Daggett 3 | Daggett, CA | 842.2 GWh |
#10 | Aktina Solar | El Campo, TX | 844.6 GWh |
#11 | Solana Generating Station | Gila Bend, AZ | 805.4 GWh |
#12 | Juno Solar Project | Lamesa, TX | 795.1 GWh |
#13 | Prospero Solar | Andrews, TX | 746.0 GWh |
#14 | Neptune Energy Center Hybrid | Boone, CO | 707.3 GWh |
#15 | Solar Star 2 | Rosamond, CA | 701.3 GWh |
#16 | IP Radian, LLC | Brookesmith, TX | 687.2 GWh |
#17 | Copper Mountain Solar 5, LLC | Boulder City, NV | 685.2 GWh |
#18 | Slate Hybrid | Stratford, CA | 656.4 GWh |
#19 | Prospero Solar II | Andrews, TX | 675.9 GWh |
#20 | Agua Caliente Solar Project | Dateland, AZ | 674.0 GWh |
#21 | Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2W Permian Solar Project Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bakke | Andrews, TX | 877.0 MWh | 12.4 mi |
Ector County Energy Center | Goldsmith, TX | 425.6 GWh | 4.7 mi |
Frankel | Andrews, TX | 645.0 MWh | 23.6 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 11.6 mi |
Jumbo Hill Wind Project | Andrews, TX | 588.6 GWh | 30.8 mi |
Lapetus | Andrews, TX | 184.7 GWh | 25.2 mi |
N. Mary Francis | Odessa, TX | 782.0 MWh | 14.6 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 227.1 GWh | 19.5 mi |
Oberon IA | Odessa, TX | 276.9 GWh | 30.3 mi |
Oberon IB | Odessa, TX | 56.3 GWh | 30.9 mi |
Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh | 22.4 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 10.1 mi |
Phoebe Solar | Kermit, TX | 518.7 GWh | 27.4 mi |
Prospero Solar | Andrews, TX | 746.0 GWh | 21.8 mi |
Prospero Solar II | Andrews, TX | 675.9 GWh | 21.5 mi |
Quail Run Energy Center | Odessa, TX | 2.3 TWh | 22.7 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 35.7 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 38.6 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 16.3 mi |
Westover | Odessa, TX | 709.0 MWh | 19.9 mi |