2127 Harris Solar Project

11160 Hampton Road, Live Oak, CA 95953

Plant Summary Information

2127 Harris Solar Project is ranked #712 out of 808 solar farms in California in terms of total annual net electricity generation.

2127 Harris Solar Project generated 245.0 MWh during the 3-month period between September 2023 to December 2023.

Plant Name2127 Harris Solar Project
Utility NameSolarenewal LLC
LocationButte County, CA
Initial Operation DateApril 2014
Last Update Dec 2023
Annual Generation 1.5 GWh
Annual Consumption 5.4 k MMBtu
Ranked #10,622 out of 11,993 Power Plants Nationwide
Ranked #5,259 out of 5,778 Solar Power Plants Nationwide
Ranked #1,452 out of 1,579 California Power Plants
Ranked #712 out of 808 California Solar Power Plants
Fuel Types Solar
Previous Operator Pristine Sun LLC (2013 to 2016)
Solarenewal LLC (2017 to 2023)

Map of 2127 Harris Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2127 Harris Solar Project.

Create Your Account Today

Monthly Net Generation for 2127 Harris Solar Project

400400320320240240160160808000201520152016201620172017201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

2127 Harris Solar Project Details

Summary Information
Plant Name2127 Harris Solar Project (58919)
Plant Address11160 Hampton Road, Live Oak, CA 95953
UtilitySolarenewal LLC (61315)
Latitude, Longitude39.29167, -121.66972
Generation Dates on FileApr 2014 to Dec 2023
Initial Operation DateApril 2014
Annual Generation 1.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 12.00 kV
Energy StorageNo

Generator 2127 Details Operating April 2014

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.3 MW
Summer Capacity1.3 MW
Winter Capacity1.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2014
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Solar Details
Single Axis TrackingYes
Azimuth Angle90
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

2127 Harris Solar Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5249115 G FisherMiddleborough, MA1.5 GWh
#5250Agriculture Capital - Legacy PackingDinuba, CA1.5 GWh
#5251Pittsfield 44 - M&W PVPittsfield, MA1.5 GWh
#5252ValdostaValdosta, GA1.5 GWh
#5253NorthropGrummanSolar(Rolling Meadows,IL)Rolling Meadows, IL1.5 GWh
#5254CSUF State CollegeFullerton, CA1.5 GWh
#5255Jefferson SolarLebanon, CT1.5 GWh
#5256Gilead Foster City Solar ProjectFoster City, CA1.5 GWh
#5257Cohasse Solar, LLC CSGSouthbridge, MA1.5 GWh
#5258Perdue Salisbury PhotovoltaicSalisbury, MD1.5 GWh
#5260Timber Creek HSSicklerville, NJ1.5 GWh
#5261Town of BranfordBranford, CT1.5 GWh
#5262BrooksideNorth Smithfield, RI1.5 GWh
#5263Carrizozo SolarCarrizozo, NM1.5 GWh
#5264Wollan Garden SolarStarbuck, MN1.5 GWh
#5265Manchester Community College NorthGreat Path, CT1.5 GWh
#5266Jordache Enterprises SolarSouth Plainfield, NJ1.5 GWh
#5267Novel Caroline Solar, LLC CSGNorth Branch, MN1.5 GWh
#5268Novel Novak Solar LLC CSGFoley, MN1.5 GWh
#5269Dodge County Solar HybridScribner, NE1.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding 2127 Harris Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
Abel Road BioenergyWilliams, CA17.3 GWh26.1 mi
Butte College Main Campus SolarOroville, CA6.7 GWh24.7 mi
ColgateDobbins, CA1.4 TWh25.7 mi
Edward C HyattOroville, CA2.4 TWh19.8 mi
Feather River Energy CenterYuba City, CA45.2 GWh13 mi
G2 Energy Ostrom Road LLCWheatland, CA25.2 GWh20.9 mi
Greenleaf 1Yuba City, CA2.6 GWh16.6 mi
Greenleaf 2 Power PlantYuba City, CA30.5 GWh10.8 mi
Gridley MainGridley, CA1.6 GWh5.7 mi
Gridley Main TwoGridley, CA4.0 GWh5.7 mi
Kelly RidgeOroville, CA65.0 GWh19.1 mi
Narrows 2Browns Valley, CA276.7 GWh21.7 mi
Narrows PHGrass Valley, CA73.5 GWh21.6 mi
Oroville Cogeneration LPOroville, CA235.0 MWh15 mi
Sacramento Municipal Util DistSacramento, CA24.4 GWh25.3 mi
Sutter Energy CenterYuba City, CA1.7 TWh16.5 mi
ThermalitoOroville, CA343.7 GWh15.6 mi
Thermalito Diverson DamOroville, CA16.5 GWh17.7 mi
Yuba City Cogen PartnersYuba City, CA19.0 GWh10.8 mi
Yuba City Energy CenterYuba City, CA49.3 GWh10.7 mi