1219 West Tahoe Street, Merced, CA 95348Plant Summary Information
2097 Helton Solar Project is ranked #574 out of 799 solar farms in California in terms of total annual net electricity generation.
2097 Helton Solar Project generated 494.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | 2097 Helton Solar Project |
---|---|
Utility Name | Solarenewal LLC |
Location | Merced County, CA |
Initial Operation Date | April 2014 |
Last Update | Dec 2023 |
Annual Generation | 2.6 GWh |
Annual Consumption | 9.2 k MMBtu |
Ranked #9,359 out of 11,835 Power Plants Nationwide | |
Ranked #4,159 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,299 out of 1,569 California Power Plants | |
Ranked #574 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Pristine Sun LLC (2013 to 2016) Solarenewal LLC (2017 to 2023) |
Map of 2097 Helton Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2097 Helton Solar Project.
Monthly Net Generation for 2097 Helton Solar Project
2097 Helton Solar Project Details
Summary Information | |
---|---|
Plant Name | 2097 Helton Solar Project (58920) |
Plant Address | 1219 West Tahoe Street, Merced, CA 95348 |
Utility | Solarenewal LLC (61315) |
Latitude, Longitude | 37.35222, -120.50694 |
Generation Dates on File | Apr 2014 to Dec 2023 |
Initial Operation Date | April 2014 |
Annual Generation | 2.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator 2097 Details Operating April 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
2097 Helton Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4149 | South Atlantic Services Solar Farm I | Wilmington, NC | 2.6 GWh |
#4150 | John A Logan College Solar | Carterville, IL | 2.6 GWh |
#4151 | Falmouth 2 Solar | Falmouth, MA | 2.6 GWh |
#4152 | Silver Lake Solar Farm | Edison, NJ | 2.6 GWh |
#4153 | Snowden River CSG | Columbia, MD | 2.6 GWh |
#4154 | CID Solar (CA) | Corcoran, CA | 2.6 GWh |
#4155 | Camden CSD Solar Array | Camden, NY | 2.6 GWh |
#4156 | Cedar Creek PV | Seaford, NY | 2.6 GWh |
#4157 | West Tennessee Solar Farm | Stanton, TN | 2.6 GWh |
#4158 | ESA Selma | Selma, NC | 2.6 GWh |
#4160 | Royal Wine Corp Solar Power Plant | Bayonne, NJ | 2.6 GWh |
#4161 | Jeffco Community Solar Gardens LLC | Arvada, CO | 2.5 GWh |
#4162 | Washington Solar (SC) | Mullins, SC | 2.5 GWh |
#4163 | Broadway 3 - UCSB Lot 38 | Santa Barbara, CA | 2.5 GWh |
#4164 | Dartmouth Solar | Dartmouth, MA | 2.5 GWh |
#4165 | Acushnet-Braley Road 1 | Freetown, MA | 2.5 GWh |
#4166 | Cenergy - Wiscasset (CSG) | Wiscasset, ME | 2.5 GWh |
#4167 | 46 Meadowlands Parkway | Secaucus, NJ | 2.5 GWh |
#4168 | IGS Solar I - BWI2 | Baltimore, MD | 2.5 GWh |
#4169 | Skalbeck Solar | Sacred Heart, MN | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2097 Helton Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adera Solar | Chowchilla, CA | 27.4 GWh | 18.9 mi |
Ampersand Chowchilla Biomass LLC | Chowchilla, CA | 49.1 GWh | 22.1 mi |
Broadway 3 - UC Merced 1 | Merced, CA | 1.2 GWh | 4.3 mi |
Chowchilla II | Chowchilla, CA | 13.6 GWh | 22.1 mi |
El Nido Facility | El Nido, CA | 43.7 GWh | 11.5 mi |
Exchequer | Snelling, CA | 250.6 GWh | 20.7 mi |
Five H Farms Solar Array | Merced, CA | 2.3 GWh | 19.9 mi |
Henry Miller RD | Dos Palos, CA | 3.3 GWh | 21.8 mi |
Hickman | Hickman, CA | 3.0 GWh | 22.8 mi |
La Grange | La Grange, CA | 8.2 GWh | 22.2 mi |
McSwain | Snelling, CA | 45.9 GWh | 15.9 mi |
Merced Falls | Snelling, CA | 12.5 GWh | 15.3 mi |
Merced Solar LLC | Merced, CA | 4.1 GWh | 6 mi |
Mission Solar LLC | Merced, CA | 4.1 GWh | 6 mi |
Parker | Snelling, CA | 4.0 GWh | 9.3 mi |
Sun Harvest Solar NDP1 | Dos Palos, CA | 3.7 GWh | 21.9 mi |
Turlock Lake | Hickman, CA | 5.7 GWh | 18.5 mi |
UC Merced Solar Hybrid | Merced, CA | 8.5 GWh | 4.2 mi |
Upper Dawson | La Grange, CA | 11.5 GWh | 20.7 mi |
Walnut Energy Center | Turlock, CA | 1.5 TWh | 23.3 mi |