2081 Terzian Solar Project
4735 South Englehart Ave, Reedley, CA 93654Plant Summary Information
2081 Terzian Solar Project is ranked #634 out of 799 solar farms in California in terms of total annual net electricity generation.
2081 Terzian Solar Project generated 379.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | 2081 Terzian Solar Project |
---|---|
Utility Name | Solarenewal LLC |
Location | Fresno County, CA |
Initial Operation Date | February 2014 |
Last Update | Dec 2023 |
Annual Generation | 2.0 GWh |
Annual Consumption | 7.3 k MMBtu |
Ranked #9,888 out of 11,852 Power Plants Nationwide | |
Ranked #4,618 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,364 out of 1,570 California Power Plants | |
Ranked #634 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Pristine Sun LLC (2013 to 2016) Solarenewal LLC (2017 to 2023) |
Map of 2081 Terzian Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2081 Terzian Solar Project.
Monthly Net Generation for 2081 Terzian Solar Project
2081 Terzian Solar Project Details
Summary Information | |
---|---|
Plant Name | 2081 Terzian Solar Project (58918) |
Plant Address | 4735 South Englehart Ave, Reedley, CA 93654 |
Utility | Solarenewal LLC (61315) |
Latitude, Longitude | 36.67, -119.41583 |
Generation Dates on File | Feb 2014 to Dec 2023 |
Initial Operation Date | February 2014 |
Annual Generation | 2.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator 2081 Details Operating February 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | No |
---|---|
Dual Axis Tracking | Yes |
DC Net Capacity | 1.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
2081 Terzian Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4608 | WWRF Solar Plant | Rifle, CO | 2.0 GWh |
#4609 | Prudential 55 Livingston Roseland Solar | Roseland, NJ | 2.0 GWh |
#4610 | Amphitheater High School Solar | Tucson, AZ | 2.0 GWh |
#4611 | Newton Grove | Newton Grove, NC | 2.0 GWh |
#4612 | Sullivan Solar | New Bedford, MA | 2.0 GWh |
#4613 | USS Brockway Solar CSG | Sartell, MN | 2.0 GWh |
#4614 | RIT Henrietta Solar 1, LLC | Rochester, NY | 2.0 GWh |
#4615 | Carver | North Carver, MA | 2.0 GWh |
#4616 | Plymouth Solar LLC | Plymouth, NC | 2.0 GWh |
#4617 | Milhurst Solar | Manalapan, NJ | 2.0 GWh |
#4619 | Bainbridge Solar | Bainbridge, GA | 2.0 GWh |
#4620 | Franklin Solar Site | Malone, NY | 2.0 GWh |
#4621 | Solar Mule, LLC | Oakland, ME | 2.0 GWh |
#4622 | USS Nillie Corn Solar CSG | North Branch, MN | 2.0 GWh |
#4623 | DG Webster LLC CSG | Webster, MA | 2.0 GWh |
#4624 | Brookfield Solar 2013 LLC | North Brookfield, MA | 2.0 GWh |
#4625 | Pelzer Solar I | Pelzer, SC | 2.0 GWh |
#4626 | Agawam Solar | Agawam, MA | 2.0 GWh |
#4627 | USS Dubhe Solar CSG | North Branch, MN | 2.0 GWh |
#4628 | Hudson County Solar | Kearny, NJ | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2081 Terzian Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agriculture Capital - Legacy Packing | Dinuba, CA | 1.5 GWh | 12.4 mi |
Algonquin Power Sanger LLC | Sanger, CA | 8.3 GWh | 7.6 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 5.4 GWh | 17.2 mi |
Clovis East High School | Clovis, CA | 1.4 GWh | 15.3 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 17.9 mi |
Dinuba Wastewater Treatment Plant | Dinuba, CA | 1.6 GWh | 9.1 mi |
Dover Dairy | Hanford, CA | 2.7 GWh | 19.2 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh | 17.3 mi |
FTF-PackingShed | Reedley, CA | 1.1 GWh | 8.5 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 6.7 mi |
Kingsburg Cogen | Kingsburg, CA | 4.6 GWh | 12.8 mi |
Kingsburg Solar | Kingsburg, CA | 2.8 GWh | 13.3 mi |
Malaga Power LLC | Fresno, CA | 10.8 GWh | 18 mi |
Moonlight Packing - Phase 2 | Reedley, CA | 2.7 GWh | 6.5 mi |
National Raisin | Fowler, CA | 4.8 GWh | 14.6 mi |
Pine Flat | Piedra, CA | 485.0 GWh | 12.3 mi |
POM Plant 1 | Del Rey, CA | 2.1 GWh | 9.5 mi |
POM Plant 2 | Del Rey, CA | 292.0 MWh | 9.8 mi |
Reedley Community College Solar | Reedley, CA | 4.0 GWh | 5 mi |
Rio Bravo Fresno | Fresno, CA | 145.1 GWh | 17.1 mi |