Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Innovative Solar 14, LLC | AES Distributed Energy | Hendersonville, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Jul 2014 | Dec 2023 | Solar |
Crockett Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2014 | Dec 2023 | Solar |
Eastover Farm | Strata Manager, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Aug 2014 | Dec 2023 | Solar |
Foxfire Solar Farm | Strata Manager, LLC | West End, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Jul 2015 | Dec 2023 | Solar |
Tart Farm | Strata Manager, LLC | Godwin, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | May 2016 | Dec 2023 | Solar |
Keen Farm | Strata Manager, LLC | Four Oaks, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Nov 2015 | Dec 2023 | Solar |
Candace Solar | Cypress Creek Renewables | Princeton, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jul 2016 | Dec 2023 | Solar |
Franklin Solar 2 | Strata Manager, LLC | Louisburg, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Feb 2014 | Dec 2023 | Solar |
Spring Valley Farm 2, LLC | Strata Manager, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Mar 2017 | Dec 2023 | Solar |
Quincy Solar | Cypress Creek Renewables | Fayetteville, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | Oct 2015 | Dec 2023 | Solar |
Sedberry Farm | Heelstone Energy Holdings, LLC | Carthage, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Nov 2016 | Dec 2023 | Solar |
Sun Devil Solar | Cypress Creek Renewables | Littleton, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Nov 2015 | Dec 2023 | Solar |
Kenneth Solar | Cypress Creek Renewables | Warrenton, NC | Duke Energy Progress East (CPLE) | 4.8 GWh | Dec 2015 | Dec 2023 | Solar |
Bearford Farm Solar Project | Strata Manager, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Feb 2017 | Dec 2023 | Solar |
Porter Solar | Cypress Creek Renewables | New Bern, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jul 2015 | Dec 2023 | Solar |
Murdock Solar | Cypress Creek Renewables | Clayton, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Dec 2015 | Dec 2023 | Solar |
Melinda Solar | Cypress Creek Renewables | Henderson, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Jul 2015 | Dec 2023 | Solar |
Walters Solar (FLS 260) | Cypress Creek Renewables | Orrum, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Jul 2015 | Dec 2023 | Solar |
Clovelly Solar | Clovelly Solar, LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Mar 2021 | Dec 2023 | Solar |
Coogee Solar | Coogee Solar, LLC | Grantsboro, NC | Duke Energy Progress East (CPLE) | 11.5 GWh | Nov 2021 | Dec 2023 | Solar |
Millers Chapel Solar | Millers Chapel Solar, LLC | La Grange, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Nov 2021 | Dec 2023 | Solar |
Overman Solar | Overman Solar, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.9 GWh | Nov 2021 | Dec 2023 | Solar |
Whiskey Solar | Whiskey Solar, LLC | Cumberland, NC | Duke Energy Progress East (CPLE) | 11.8 GWh | May 2021 | Dec 2023 | Solar |
Mule Farm Solar, LLC | Mule Farm Solar, LLC | Benson, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Apr 2022 | Dec 2023 | Solar |
Ramp Solar, LLC | Ramp Solar, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Apr 2022 | Dec 2023 | Solar |
Hubble Solar, LLC | Hubble Solar, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 2.3 GWh | Mar 2023 | Dec 2023 | Solar |
ESA Albemarle NC Solar | ESA Albemarle NC Solar, LLC | Albemarle, NC | Duke Energy Carolinas (DUK) | 4.4 GWh | Mar 2021 | Dec 2023 | Solar |
Oakwood Solar | Oakwood Solar, LLC | Mebane, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | May 2021 | Dec 2023 | Solar |
Saw Solar | Saw Solar, LLC | China Grove, NC | Duke Energy Carolinas (DUK) | 10.8 GWh | May 2022 | Dec 2023 | Solar |
Sawtell Solar | Sawtell Solar, LLC | Hendersonville, NC | Duke Energy Carolinas (DUK) | 5.9 GWh | Mar 2021 | Dec 2023 | Solar |
Southwick Solar | Southwick Solar, LLC | Graham, NC | Duke Energy Carolinas (DUK) | 6.0 GWh | Nov 2020 | Dec 2023 | Solar |
Strider Solar, LLC | Cardinal Renewables | Asheboro, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Mar 2018 | Dec 2023 | Solar |
Woodsdale Farm, LLC | Cardinal Renewables | Roxboro, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Oct 2018 | Dec 2023 | Solar |
Hayes Solar, LLC | Hayes Solar, LLC | Dobson, NC | Duke Energy Carolinas (DUK) | 6.8 GWh | Nov 2020 | Dec 2023 | Solar |
Ward WTP | City Of High Point | High Point, NC | Duke Energy Carolinas (DUK) | 24.0 MWh | Jan 1999 | Dec 2023 | Distillate Fuel Oil |
Murphy Farm Power, LLC | Duke Energy Renewables Services | Culberson, NC | Duke Energy Carolinas (DUK) | 1.2 GWh | Apr 2011 | Dec 2023 | Solar |
Westside WWTP | City Of High Point | Thomasville, NC | Duke Energy Carolinas (DUK) | 30.0 MWh | Apr 2005 | Dec 2023 | Distillate Fuel Oil |
232 Long Branch 29 Solar I, LLC | Cardinal Renewables | Shelby, NC | Duke Energy Carolinas (DUK) | 2.3 GWh | Jul 2018 | Dec 2023 | Solar |
Eastside WWTP | City Of High Point | High Point, NC | Duke Energy Carolinas (DUK) | 213.0 MWh | Jul 2004 | Dec 2023 | Distillate Fuel Oil |
Gaston Memorial Hospital | City of Gastonia | Gastonia, NC | Duke Energy Carolinas (DUK) | 39.0 MWh | Apr 2006 | Aug 2024 | Distillate Fuel Oil |
Long Creek Waste Water Plant | City of Gastonia | Dallas, NC | Duke Energy Carolinas (DUK) | 428.0 MWh | Dec 1994 | Aug 2024 | Distillate Fuel Oil |
Monroe Generating Station | North Carolina Mun Power Agny #1 | Monroe, NC | Duke Energy Carolinas (DUK) | 218.0 MWh | Mar 2010 | Dec 2023 | Natural Gas : 99.9% |
Sugar Solar, LLC | Sugar Solar, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 109.9 GWh | Nov 2021 | Aug 2024 | Solar |
Lick Creek Solar, LLC | Lick Creek Solar, LLC | Walnut Cove, NC | Duke Energy Carolinas (DUK) | 110.4 GWh | Feb 2022 | Aug 2024 | Solar |
DE Solar 10240 Old Dowd Rd | Duke Energy Carolinas, LLC | Charlotte, NC | Duke Energy Carolinas (DUK) | 1.4 GWh | Aug 2010 | Dec 2023 | Solar |
1001 Ebenezer Church Solar | 1001 Ebenezer Church Solar, LLC | StateRoad, NC | Duke Energy Carolinas (DUK) | 5.1 GWh | Mar 2021 | Dec 2023 | Solar |
DE Solar 657 Brigham Rd | Duke Energy Carolinas, LLC | Greensboro, NC | Duke Energy Carolinas (DUK) | 810.0 MWh | Mar 2010 | Dec 2023 | Solar |
DE Solar 1725 Drywall Dr | Duke Energy Carolinas, LLC | Mt. Holly, NC | Duke Energy Carolinas (DUK) | 796.0 MWh | Dec 2009 | Dec 2023 | Solar |
Lang Solar Farm | Lang Solar Farm, LLC | La Grange, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Sep 2016 | Dec 2023 | Solar |
1045 Tomlin Mill Solar | 1045 Tomlin Mill Solar, LLC | Statesville, NC | Duke Energy Carolinas (DUK) | 8.1 GWh | Apr 2021 | Dec 2023 | Solar |
Mayberry Solar LLC | Oppidum Renewables USA, LLC | Mt. Airy, NC | Duke Energy Carolinas (DUK) | 1.5 GWh | Sep 2011 | Dec 2023 | Solar |
1008 Matthews Solar | 1008 Matthews Solar, LLC | East Bend, NC | Duke Energy Carolinas (DUK) | 8.6 GWh | Apr 2021 | Dec 2023 | Solar |
1073 Onslow Solar | 1073 Onslow Solar, LLC | Hubert, NC | Duke Energy Carolinas (DUK) | 6.7 GWh | Apr 2021 | Dec 2023 | Solar |
1009 Yadkin Solar | 1009 Yadkin Solar, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Mar 2021 | Dec 2023 | Solar |
Martins Creek Solar NC, LLC | Duke Energy Renewables Services | Murphy, NC | Duke Energy Carolinas (DUK) | 1.1 GWh | Feb 2011 | Dec 2023 | Solar |
Shelby Solar Energy Generation Facility | Duke Energy Renewables Services | Shelby, NC | Duke Energy Carolinas (DUK) | 1.1 GWh | Apr 2010 | Dec 2023 | Solar |
Mas Durham Power, LLC | Mas Durham Power, LLC | Durham, NC | Duke Energy Carolinas (DUK) | 6.6 GWh | Jan 2010 | Dec 2023 | Landfill Gas |
Waste Management Piedmont LFGTE Project | WM Renewable Energy LLC | Kernersville, NC | Duke Energy Carolinas (DUK) | 10.0 GWh | Feb 2011 | Dec 2023 | Landfill Gas |
Ventura Solar, LLC | Sol Systems | Taylorsville, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Oct 2020 | Dec 2023 | Solar |
Ashley Solar Farm | Ashley Solar Farm, LLC | Hamptonville, NC | Duke Energy Carolinas (DUK) | 7.2 GWh | Feb 2015 | Dec 2023 | Solar |
Taylorsville Solar LLC | Duke Energy Renewables Services | Taylorsville, NC | Duke Energy Carolinas (DUK) | 1.3 GWh | Sep 2010 | Dec 2023 | Solar |
Cleveland Cnty Generating Facility | Southern Power Co | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 640.9 GWh | Nov 2012 | Dec 2023 | Natural Gas : 99.9% |
Davidson Gas Producers LLC | Davidson Gas Producers LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 12.3 GWh | Oct 2010 | Dec 2023 | Landfill Gas |
Cline Solar Farm, LLC | Cline Solar, LLC | Hildebran, NC | Duke Energy Carolinas (DUK) | 8.1 GWh | Aug 2017 | Dec 2023 | Solar |
Marshville Farm | Strata Manager, LLC | Marshville, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Sep 2013 | Dec 2023 | Solar |
Old Catawba PV 1 | Ecoplexus, Inc | Claremont, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2015 | Dec 2023 | Solar |
Moore Solar Farm | Strata Manager, LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 7.9 GWh | Nov 2013 | Dec 2023 | Solar |
Ruff Solar LLC | Sol Systems | Ellenboro, NC | Duke Energy Carolinas (DUK) | 42.0 GWh | Jun 2020 | Dec 2023 | Solar |
Freemont Solar Center LLC | Heelstone Energy Holdings, LLC | Stanley, NC | Duke Energy Carolinas (DUK) | 6.2 GWh | Nov 2016 | Dec 2023 | Solar |
Beetle Solar | Cypress Creek Renewables | Mooresboro, NC | Duke Energy Carolinas (DUK) | 6.0 GWh | Nov 2016 | Dec 2023 | Solar |
White Cross Farm | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Carolinas (DUK) | 7.9 GWh | Aug 2013 | Dec 2023 | Solar |
Husky Solar | Cypress Creek Renewables | Reidsville, NC | Duke Energy Carolinas (DUK) | 8.4 GWh | Nov 2016 | Dec 2023 | Solar |
Vance Solar Farm, LLC | Cypress Creek Renewables | Kittrell, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Dec 2015 | Dec 2023 | Solar |
Manning PV 1 | Ecoplexus, Inc | Elon, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2018 | Dec 2023 | Solar |
BG Stewart Solar Farm, LLC | Cypress Creek Renewables | Marshville, NC | Duke Energy Carolinas (DUK) | 8.2 GWh | Oct 2015 | Dec 2023 | Solar |
Dibrell Farm | Strata Manager, LLC | Pelham, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Feb 2013 | Dec 2023 | Solar |
Two Lines Farm | Strata Manager, LLC | Hickory, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Feb 2013 | Dec 2023 | Solar |
Meadowbrook Solar Farm | Cypress Creek Renewables | Rockwell, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Oct 2016 | Dec 2023 | Solar |
Coats Solar Farm, LLC | Cypress Creek Renewables | Coats, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Dec 2015 | Dec 2023 | Solar |
Jordan Hydroelectric Project | Jordan Hydroelectric LTD PTP | Moncure, NC | Duke Energy Carolinas (DUK) | 5.2 GWh | Dec 2011 | Dec 2022 | Water |
Dixon Dairy Road Solar | Palmetto Power Management LLC | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 5.2 GWh | Nov 2011 | Dec 2023 | Solar |
Arthur Solar, LLC | MN8 Energy LLC | Tabor City, NC | Duke Energy Carolinas (DUK) | 10.1 GWh | Jun 2018 | Dec 2023 | Solar |
Stony Knoll Solar, LLC | Duke Energy Renewables Services | Rockford, NC | Duke Energy Carolinas (DUK) | 39.4 GWh | Feb 2022 | Dec 2023 | Solar |
Ray Wilson Solar | Ray Wilson Solar, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 8.1 GWh | Mar 2021 | Dec 2023 | Solar |
Carolina Lily Solar | Carolina Lily Solar, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Apr 2021 | Dec 2023 | Solar |
Concord Energy | Concord Energy LLC | Concord, NC | Duke Energy Carolinas (DUK) | 57.5 GWh | Jan 2012 | Aug 2024 | Landfill Gas |
Apple Data Center PV | Apple, Inc | Maiden, NC | Duke Energy Carolinas (DUK) | 35.6 GWh | Jan 2013 | Dec 2023 | Solar |
Concord Farm | Shoe Show, Inc. | Concord, NC | Duke Energy Carolinas (DUK) | 2.2 GWh | Aug 2011 | Dec 2023 | Solar |
Lee Combined Cycle Plant | Duke Energy Progress - (NC) | Goldsboro, NC | Duke Energy Carolinas (DUK) | 6.5 TWh | Nov 2012 | Aug 2024 | Natural Gas |
Broad River Solar, LLC | Duke Energy Renewables Services | Mooresboro, NC | Duke Energy Carolinas (DUK) | 91.9 GWh | Nov 2021 | Aug 2024 | Solar |
Speedway Solar NC, LLC | Duke Energy Renewables Services | Midland, NC | Duke Energy Carolinas (DUK) | 42.6 GWh | Nov 2021 | Dec 2023 | Solar |
CS Murphy Point, LLC | Duke Energy Renewables Services | Murphy, NC | Duke Energy Carolinas (DUK) | 1.2 GWh | Jul 2011 | Dec 2023 | Solar |
Hutchinson Farm | Strata Manager, LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Nov 2014 | Dec 2023 | Solar |
Innovative Solar 15, LLC | AES Distributed Energy | Ellenboro, NC | Duke Energy Carolinas (DUK) | 3.1 GWh | Jul 2014 | Dec 2023 | Solar |
Gaston Solar Power Plant | Duke Energy Carolinas, LLC | Cherryville Township, NC | Duke Energy Carolinas (DUK) | 48.1 GWh | Nov 2020 | Aug 2024 | Solar |
Maiden Creek Solar Power Plant | Duke Energy Carolinas, LLC | Maiden, NC | Duke Energy Carolinas (DUK) | 132.8 GWh | Dec 2020 | Aug 2024 | Solar |
Arndt Farm | Strata Manager, LLC | Claremont, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Oct 2012 | Dec 2023 | Solar |
1047 Little Mountain Solar, LLC | CI-II Mitchell Holding LLC | Jonesville, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Oct 2019 | Dec 2023 | Solar |
Haynes Farm | Strata Manager, LLC | Lincolnton, NC | Duke Energy Carolinas (DUK) | 7.8 GWh | Aug 2013 | Dec 2023 | Solar |
Little River PV 1 | Ecoplexus, Inc | Randolph, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Nov 2015 | Dec 2023 | Solar |