Directory of Power Plants in New York
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Kearsarge Oppenheim CSG | Kearsarge Oppenheim LLC | St. Johnsville, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jun 2018 | Dec 2023 | Solar |
Sunlight Beacon | BQ Energy LLC | Beacon, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Jun 2018 | Dec 2023 | Solar |
Broadalbin-Perth Solar | AES Distributed Energy | Amsterdam, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Aug 2018 | Dec 2023 | Solar |
The Bank of New York | The Bank of New York | New York, NY | New York Independent System Operator (NYIS) | 44.9 MWh | Dec 1982 | Dec 2023 | Distillate Fuel Oil |
Brooklyn Hospital Center | Brooklyn Hospital Center | Brooklyn, NY | New York Independent System Operator (NYIS) | 35.3 MWh | Dec 1974 | Dec 2023 | Distillate Fuel Oil |
Saint Catherine of Siena Medical Center | Saint Catherine of Siena Medical Center | Smithtown, NY | New York Independent System Operator (NYIS) | 17.9 MWh | Dec 1971 | Dec 2023 | Distillate Fuel Oil |
Riverhead Solar Farm | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 32.1 GWh | Jun 2019 | Dec 2023 | Solar |
Baer Road CSG | Delaware River Solar, LLC | New York, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Dec 2017 | Dec 2023 | Solar |
St Johns Riverside Hospital | St Johns Riverside Hospital | Yonkers, NY | New York Independent System Operator (NYIS) | 7.7 MWh | Dec 1967 | Dec 2023 | Distillate Fuel Oil |
Minisink Solar 1 LLC | Minisink Solar 1 LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Sep 2018 | Dec 2023 | Solar |
Minisink Community Solar 2 LLC | Minisink Solar 2 LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Oct 2018 | Dec 2023 | Solar |
Hospital Rd Community Solar Farm CSG | Delaware River Solar, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Nov 2019 | Dec 2023 | Solar |
Sacket Lake Rd #2 Community Solar Farm | Delaware River Solar, LLC | Thompson, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Feb 2019 | Dec 2023 | Solar |
Turner Rd Community Solar Project | Delaware River Solar, LLC | Baldwin, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jan 2019 | Dec 2023 | Solar |
NYC-HH-New Bellevue Hospital | NYC-HH-New Bellevue Hospital | New York, NY | New York Independent System Operator (NYIS) | 211.2 MWh | Dec 1995 | Dec 2023 | Distillate Fuel Oil |
Mattas Farms | AES Distributed Energy | Amsterdam, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Oct 2018 | Dec 2023 | Solar |
Mechanicville Hydroelectric Station | Mechanicville Hydroelectric Station | Mechanicville, NY | New York Independent System Operator (NYIS) | 27.1 GWh | Apr 2011 | Dec 2023 | Water |
Gloversville Landfill Solar | Gloversville Community Solar LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Apr 2021 | Dec 2023 | Solar |
Regeneron Pharmaceuticals Inc. | Regeneron Pharmaceuticals Inc. | Tarrytown, NY | New York Independent System Operator (NYIS) | 85.7 MWh | Jul 2009 | Dec 2023 | Distillate Fuel Oil : 99.4% Natural Gas : 0.6% |
JLL-One Rockwood Road | JLL-One Rockwood Road | Sleppy Hollow, NY | New York Independent System Operator (NYIS) | 12.9 MWh | Dec 2002 | Dec 2023 | Distillate Fuel Oil |
Mount Sinai South Nassau Hospital | Mount Sinai South Nassau Hospital | Oceanside, NY | New York Independent System Operator (NYIS) | 39.4 MWh | Dec 1974 | Dec 2023 | Distillate Fuel Oil |
St. Johns Episcopal Hospital | St. Johns Episcopal Hospital | Far Rockaway, NY | New York Independent System Operator (NYIS) | 13.6 MWh | Dec 1994 | Dec 2023 | Distillate Fuel Oil |
Regeneron Tarrytown | Bloom Energy | Tarrytown, NY | New York Independent System Operator (NYIS) | 11.7 GWh | Sep 2018 | Dec 2023 | Natural Gas |
Gaskill Rd Community Solar Farm CSG | Delaware River Solar, LLC | Owego, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Nov 2019 | Dec 2023 | Solar |
Woodoak Drive Community Solar Farm CSG | Delaware River Solar, LLC | Tusten, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Nov 2019 | Dec 2023 | Solar |
CMR Solar LLC | CMR Solar, LLC | Pine Bush, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Apr 2019 | Dec 2023 | Solar |
Frey Rd #1 Community Solar Farm | KSI II Consolidated, LLC | Macedon, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2020 | Dec 2023 | Solar |
County Route 11 Community Solar Farm | KSI II Consolidated, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2020 | Dec 2023 | Solar |
Furnace Rd Community Solar Farm | KSI II Consolidated, LLC | Ontario, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2020 | Dec 2023 | Solar |
Frey Rd #2 Community Solar Farm | KSI II Consolidated, LLC | Macedon, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2020 | Dec 2023 | Solar |
Route 22 Community Solar Farm CSG | KSI II Consolidated, LLC | Plattsburgh, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Sep 2021 | Dec 2023 | Solar |
Villa Roma Rd #3 CSG | Delaware River Solar, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2019 | Dec 2023 | Solar |
Villa Roma Rd #4 CSG | Delaware River Solar, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Nov 2019 | Dec 2023 | Solar |
Kearsarge Johnstown 1 CSG | Kearsarge Johnstown 1 LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2018 | Dec 2023 | Solar |
Kearsarge Johnstown 2 CSG | Kearsarge Johnstown 2 LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2018 | Dec 2023 | Solar |
ATT Jericho | Bloom Energy | Huntington, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Feb 2017 | Dec 2023 | Natural Gas |
MER Queens | Bloom Energy | Elmhurst, NY | New York Independent System Operator (NYIS) | 8.5 GWh | Feb 2017 | Dec 2023 | Natural Gas |
Route 14A CDG Solar North and South LLC | Route 14A CDG Solar North and South, LLC | Geneva, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Nov 2018 | Dec 2023 | Solar |
Newfield Community Solar LLC | Newfield Solar LLC | Newfield, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Dec 2018 | Dec 2023 | Solar |
CBP Solar | EnterSolar | Buchanan, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2018 | Dec 2023 | Solar |
Kinder Morgan Fordham | EnterSolar | Staten Island, NY | New York Independent System Operator (NYIS) | 4.0 GWh | May 2018 | Dec 2023 | Solar |
Rockland Bakery Inc. | Rockland Bakery Inc. | Nanuet, NY | New York Independent System Operator (NYIS) | 19.0 MWh | Dec 1995 | Dec 2023 | Natural Gas : 93.8% Distillate Fuel Oil : 6.2% |
Greenville CSG | Altus Power America Management, LLC | Port Jervis, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Jul 2019 | Dec 2023 | Solar |
Chester CSG | Altus Power America Management, LLC | Chester, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jun 2019 | Dec 2023 | Solar |
Westtown CSG | Altus Power America Management, LLC | Westtown, NY | ISO New England (ISNE) | 3.4 GWh | Apr 2019 | Dec 2023 | Solar |
Ulster County Solar | Ulster Solar LLC | Kingston, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Apr 2018 | Dec 2023 | Solar |
Franklin Solar Site | Helios NY I, LLC | Malone, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Nov 2018 | Dec 2023 | Solar |
Malone Solar Site | Helios NY I, LLC | Malone, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Nov 2018 | Dec 2023 | Solar |
Sugarhill Road - Solitude Solar CSG | Standard Solar | Rexford, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Aug 2019 | Dec 2023 | Solar |
RIT Henrietta Solar 1, LLC | SolRiver Capital LLC | Rochester, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Nov 2018 | Dec 2023 | Solar |
Burrstone Energy Center | Burrstone Energy Center | New Hartford, NY | New York Independent System Operator (NYIS) | 18.5 GWh | Jul 2009 | Dec 2023 | Natural Gas |
25 Ashdown Road Solar, LLC | AES Distributed Energy | Clifton Park, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2019 | Dec 2023 | Solar |
Finchville Solar, LLC Hybrid CSG | AES Distributed Energy | Mt. Hope, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2020 | Dec 2023 | Solar : 99.4% Electricity used for energy storage : 0.6% |
RT 52 Walden Solar 1, LLC Hybrid | AES Distributed Energy | Montgomery, NY | New York Independent System Operator (NYIS) | 6.7 GWh | Nov 2019 | Dec 2023 | Solar : 99.7% |
Ransomville Solar 1, LLC | AES Distributed Energy | Ransomville, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2019 | Dec 2023 | Solar |
Johnstown Solar 1, LLC | AES Distributed Energy | Gloversville, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Nov 2019 | Dec 2023 | Solar |
Hollygrove CSG | Nautilus Solar Solutions | Red Creek, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2018 | Dec 2023 | Solar |
Guildlerland CSG | Nautilus Solar Solutions | Guilderland, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2018 | Dec 2023 | Solar |
Howland CSG | Nautilus Solar Solutions | Sandy Creek, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2018 | Dec 2023 | Solar |
Czub CSG | Nautilus Solar Solutions | Schagticoke, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Nov 2018 | Dec 2023 | Solar |
Mereand CSG | Nautilus Solar Solutions | Watertown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2018 | Dec 2023 | Solar |
Aegis CSG | Nautilus Solar Solutions | Canadaigua, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Nov 2018 | Dec 2023 | Solar |
Pearl CSG | Nautilus Solar Solutions | Batavia, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2018 | Dec 2023 | Solar |
Bethlehem Solar | Nautilus Solar Solutions | New Scotland, NY | New York Independent System Operator (NYIS) | 2.6 GWh | May 2019 | Dec 2023 | Solar |
Frog Hollow CSG | Nautilus Solar Solutions | Ellenville, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Sep 2019 | Dec 2023 | Solar |
Dover CSG | Nautilus Solar Solutions | Dover Plains, NY | New York Independent System Operator (NYIS) | 3.9 GWh | Aug 2019 | Dec 2023 | Solar |
Howell CSG | Nautilus Solar Solutions | Middletown, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jan 2020 | Dec 2023 | Solar |
Strauss CSG | Nautilus Solar Solutions | Geneva, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Aug 2019 | Dec 2023 | Solar |
Ellsworth I CSG | Nautilus Solar Solutions | Mechanicville, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Aug 2019 | Dec 2023 | Solar |
Allis Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Jun 2020 | Dec 2023 | Solar |
Beals Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Apr 2020 | Dec 2023 | Solar |
AES Tonawanda Solar LLC | AES Distributed Energy | Tonawanda, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Dec 2019 | Dec 2023 | Solar |
Knaggs Brothers Farm | Dynamic Energy Holdings LLC | Altamont, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2018 | Dec 2023 | Solar |
Barneveld Solar | Citizens Enterprises Corporation | Barneveld, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Apr 2019 | Dec 2023 | Solar |
100 Brook Hill Drive Solar | Diamond Properties | West Nyack, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2015 | Dec 2023 | Solar |
Hobart & William Smith College Gates Rd. | Dynamic Energy Holdings LLC | Geneva, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2017 | Dec 2023 | Solar |
Hales Mills Solar, LLC | Hales Mills Solar, LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Sep 2020 | Dec 2023 | Solar |
Riley Road LLC | Green Street Power Partners | New Windsor, NY | New York Independent System Operator (NYIS) | 6.7 GWh | Jul 2019 | Dec 2023 | Solar |
Hope Solar Farm LLC | Green Street Power Partners | Troy, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2019 | Dec 2023 | Solar |
Catlin Solar 1 LLC | Green Street Power Partners | Beaver Dams, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Nov 2019 | Dec 2023 | Solar |
Saratoga Solar LLC | Green Street Power Partners | Milton, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Nov 2019 | Dec 2023 | Solar |
Macedon | Solar Planet Power | Macedon, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jan 2019 | Dec 2023 | Solar |
Whittier | Solar Planet Power | Ogden, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Feb 2019 | Dec 2023 | Solar |
Williamson | Solar Planet Power | Williamson, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Feb 2019 | Dec 2023 | Solar |
Bennett | Solar Planet Power | East Bloomfield, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Feb 2019 | Dec 2023 | Solar |
Greenwich Solar 1, LLC CSG | AES Distributed Energy | Greenwich, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Nov 2020 | Dec 2023 | Solar |
Middletown Solar 1, LLC Hybrid CSG | AES Distributed Energy | Middletown, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2020 | Dec 2023 | Solar : 99.7% |
Chenango Solar | Citizens Enterprises Corporation | Castle Creek, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2019 | Dec 2023 | Solar |
Calabro Airport North Solar Project | CVI Renewables Holdings, LLC. | Shirley, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2019 | Dec 2023 | Solar |
Calabro Airport South Solar Project | CVI Renewables Holdings, LLC. | Shirley, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Nov 2019 | Dec 2023 | Solar |
Mohonasen Central School District | Tesla Inc. | Schenectady, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Aug 2019 | Dec 2023 | Solar |
Fordham University | Fordham University | Bronx, NY | New York Independent System Operator (NYIS) | 53.9 MWh | Dec 1998 | Dec 2023 | Distillate Fuel Oil |
SDM000 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 14.4 GWh | Apr 2018 | Dec 2023 | Natural Gas |
NHH003 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Aug 2018 | Dec 2023 | Natural Gas |
NHH004 Winthrop Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Aug 2018 | Dec 2023 | Natural Gas |
MSAP 13 | MSAP 13, LLC | Troy, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2020 | Dec 2023 | Solar |
1639 RT 29 Solar 1 | 1639 RT 29 Solar 1, LLC | Gloversville, NY | ISO New England (ISNE) | 7.6 GWh | Nov 2020 | Dec 2023 | Solar |
Little Falls Solar | Little Falls Solar | Little Falls, NY | ISO New England (ISNE) | 3.6 GWh | Sep 2020 | Dec 2023 | Solar |
Little Falls Solar 1 | Little Falls Solar 1, LLC | Little Falls, NY | ISO New England (ISNE) | 3.5 GWh | Aug 2020 | Dec 2023 | Solar |
Cream Street Solar | Cream Street Solar, LLC | Hyde Park, NY | ISO New England (ISNE) | 3.8 GWh | Nov 2020 | Dec 2023 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2023 generation numbers.County | State Rank | Active Plants | Dec 2023 Generation |
---|---|---|---|
Franklin County, NY | # 29 | 13 | 427.2 GWh |
Westchester County, NY | # 28 | 30 | 468.1 GWh |
Bronx County, NY | # 27 | 14 | 475.3 GWh |
Onondaga County, NY | # 26 | 28 | 492.6 GWh |
Monroe County, NY | # 25 | 34 | 549.0 GWh |
Yates County, NY | # 24 | 3 | 686.8 GWh |
Chautauqua County, NY | # 23 | 17 | 741.3 GWh |
Jefferson County, NY | # 22 | 36 | 833.8 GWh |
Wyoming County, NY | # 21 | 15 | 911.3 GWh |
Steuben County, NY | # 20 | 21 | 1.1 TWh |
Clinton County, NY | # 19 | 22 | 1.3 TWh |
Rockland County, NY | # 18 | 10 | 1.4 TWh |
Richmond County, NY | # 17 | 15 | 1.4 TWh |
Lewis County, NY | # 16 | 27 | 1.6 TWh |
Saratoga County, NY | # 15 | 33 | 2.4 TWh |
Kings County, NY | # 14 | 29 | 2.5 TWh |
Greene County, NY | # 13 | 12 | 2.8 TWh |
Nassau County, NY | # 12 | 25 | 3.0 TWh |
New York County, NY | # 11 | 18 | 3.5 TWh |
Rensselaer County, NY | # 10 | 20 | 4.0 TWh |
Albany County, NY | # 9 | 26 | 5.0 TWh |
Dutchess County, NY | # 8 | 21 | 5.3 TWh |
Wayne County, NY | # 7 | 10 | 5.4 TWh |
Orange County, NY | # 6 | 52 | 5.7 TWh |
Suffolk County, NY | # 5 | 63 | 8.3 TWh |
St. Lawrence County, NY | # 4 | 58 | 9.5 TWh |
Niagara County, NY | # 3 | 18 | 17.4 TWh |
Queens County, NY | # 2 | 21 | 18.0 TWh |
Oswego County, NY | # 1 | 30 | 31.0 TWh |