Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Forestport | Clear Energy Capital, LLC | Forestport, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 1987 | Dec 2022 | Water |
Ticonderoga Mill | IPC-Ticonderoga | Ticonderoga, NY | New York Independent System Operator (NYIS) | 197.2 GWh | Dec 1969 | Jun 2024 | Natural Gas : 60.6% Black Liquor : 31.6% Residual Fuel Oil : 4.6% Wood/Wood Waste Solids : 3.2% |
Kennedy International Airport Cogen | KIAC Partners | Jamaica, NY | New York Independent System Operator (NYIS) | 571.5 GWh | Nov 1994 | Oct 2023 | Natural Gas : 99.6% |
Fortistar North Tonawanda | North American Energy Services | North Tonawanda, NY | New York Independent System Operator (NYIS) | 57.6 GWh | Jun 1993 | Dec 2023 | Natural Gas |
Alice Falls Hydro Project | Eagle Creek Renewable Energy, LLC | Keeseville, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Oct 1991 | Dec 2023 | Water |
Stillwater Hydro Electric Project | GR Catalyst One, LLC | Stillwater, NY | New York Independent System Operator (NYIS) | 12.6 GWh | Mar 1993 | Dec 2023 | Water |
Sithe Independence Station | Sithe/Independence LLC | Oswego, NY | New York Independent System Operator (NYIS) | 5.8 TWh | Jul 1994 | Jun 2024 | Natural Gas |
Longfalls Facility | Ampersand Long Falls Hydro, LLC | West Carthage, NY | New York Independent System Operator (NYIS) | 881.0 MWh | Sep 1991 | Dec 2023 | Water |
Wappinger Falls Hydroelectric | Windsor Machinery Co Inc | Wappinger Falls, NY | New York Independent System Operator (NYIS) | 12.4 GWh | Nov 1988 | Dec 2023 | Water |
Saranac Facility | Saranac Power Partners LP | Plattsburgh, NY | New York Independent System Operator (NYIS) | 261.5 GWh | May 1994 | Dec 2023 | Natural Gas |
Curtis Palmer Hydroelectric | Palmer Hydroelectric | Corinth, NY | New York Independent System Operator (NYIS) | 418.3 GWh | Sep 1985 | Dec 2023 | Water |
Massena Energy Facility | Power City Partners LP | Massena, NY | New York Independent System Operator (NYIS) | 22.0 GWh | Jun 1992 | Oct 2023 | Natural Gas |
Indeck Corinth Energy Center | Indeck-Corinth Ltd Partnership | Corinth, NY | New York Independent System Operator (NYIS) | 563.6 GWh | Jan 1995 | Dec 2023 | Natural Gas |
Unionville Hydro Project 2499 NY | Erie Boulevard Hydropower LP | Norwood, NY | New York Independent System Operator (NYIS) | 16.1 GWh | Jun 1984 | Dec 2023 | Water |
Dahowa Hydro | GR Catalyst Two LLC | Greenwich, NY | New York Independent System Operator (NYIS) | 45.2 GWh | Nov 1987 | Dec 2023 | Water |
Bethpage Power Plant | Calpine Eastern Corp | Hicksville, NY | New York Independent System Operator (NYIS) | 647.1 GWh | Jul 1989 | Dec 2023 | Natural Gas |
Chasm Hydro Partnership | Ampersand Chasm Hydro LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 4.8 GWh | Feb 1982 | Dec 2023 | Water |
Newport Hydro | Eagle Creek Renewable Energy, LLC | Newport, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 1987 | Dec 2023 | Water |
Cornell University Central Heat | Cornell University | Ithaca, NY | New York Independent System Operator (NYIS) | 232.6 GWh | Jun 1988 | Dec 2023 | Natural Gas |
Tannery Island Power | Elevate Power Management LLC | Carthage, NY | New York Independent System Operator (NYIS) | 6.1 GWh | May 1986 | Dec 2022 | Water |
Bronx Zoo | New York Zoological Society | New York, NY | New York Independent System Operator (NYIS) | 21.8 GWh | Dec 1990 | Dec 2023 | Natural Gas |
Indeck Silver Springs Energy Center | Indeck-Energy Serv Silver Spg | Silver Springs, NY | New York Independent System Operator (NYIS) | 43.4 GWh | Apr 1991 | Dec 2023 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
Indeck Oswego Energy Center | Indeck-Oswego Ltd Partnership | Oswego, NY | New York Independent System Operator (NYIS) | 36.9 GWh | May 1990 | Dec 2023 | Natural Gas : 99.9% |
Indeck Yerkes Energy Center | Indeck-Yerkes Ltd Partnership | Tonawanda, NY | New York Independent System Operator (NYIS) | 15.2 GWh | Nov 1989 | Dec 2022 | Natural Gas : 99.7% |
Stony Brook Cogen Plant | Nissequoque Cogen Partners | Stony Brook, NY | New York Independent System Operator (NYIS) | 304.8 GWh | Mar 1995 | Dec 2022 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
Covanta Niagara I, LLC | Covanta Energy of Niagara LP | Niagara Falls, NY | New York Independent System Operator (NYIS) | 216.7 GWh | Jul 1980 | Jun 2024 | Non-biogenic Municipal Solid Waste : 51.6% Biogenic Municipal Solid Waste : 42.3% Natural Gas : 6.1% |
Glen Park Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Watertown, NY | New York Independent System Operator (NYIS) | 148.4 GWh | Sep 1999 | Dec 2023 | Water |
Stillwater Reservoir Hydro | Stillwater Associates | Webb, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Dec 1986 | Dec 2023 | Water |
Fort Miller Hydroelectric Facility | Fort Miller Associates | Northumberland, NY | New York Independent System Operator (NYIS) | 21.1 GWh | Nov 1984 | Dec 2023 | Water |
High Acres Gas Recovery | WM Renewable Energy LLC | Fairport, NY | New York Independent System Operator (NYIS) | 78.5 GWh | Apr 1991 | Dec 2023 | Landfill Gas |
Covanta Babylon Inc | Covanta Babylon Inc | West Babylon, NY | New York Independent System Operator (NYIS) | 131.3 GWh | Dec 1988 | Jun 2024 | Non-biogenic Municipal Solid Waste : 54.8% Biogenic Municipal Solid Waste : 44.8% |
Lyonsdale Associates | Eagle Creek Renewable Energy, LLC | Lyons Falls, NY | New York Independent System Operator (NYIS) | 13.3 GWh | Jun 1984 | Dec 2023 | Water |
Huntington Resource Recovery Facility | Huntington Resource Recovery | East Northport, NY | New York Independent System Operator (NYIS) | 214.4 GWh | Nov 1991 | Jun 2024 | Non-biogenic Municipal Solid Waste : 54.9% Biogenic Municipal Solid Waste : 44.9% |
Onondaga County Resource Recovery | Covanta Onondega LP | Jamesville, NY | New York Independent System Operator (NYIS) | 236.4 GWh | Oct 1994 | Jun 2024 | Non-biogenic Municipal Solid Waste : 54.8% Biogenic Municipal Solid Waste : 44.8% |
Sterling Power Plant | Sterling Power Partners LP | Sherrill, NY | New York Independent System Operator (NYIS) | 2.6 GWh | May 1991 | Dec 2023 | Natural Gas : 99.7% |
West End Dam Hydroelectric Project | Elevate Power Management LLC | Carthage, NY | New York Independent System Operator (NYIS) | 24.3 GWh | Sep 1985 | Dec 2023 | Water |
Chaffee Gas Recovery | WM Renewable Energy LLC | Chaffee, NY | New York Independent System Operator (NYIS) | 45.2 GWh | Jul 2007 | Dec 2023 | Landfill Gas |
Madison Windpower LLC | Madison Windpower LLC | Madison, NY | New York Independent System Operator (NYIS) | 12.4 GWh | Sep 2000 | Jun 2024 | Wind |
Edgewood Energy LLC | Edgewood Energy LLC | Brentwood, NY | New York Independent System Operator (NYIS) | 109.3 GWh | Jun 2002 | Dec 2023 | Natural Gas |
Ellenburg | Valcour Operating Services, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 125.0 GWh | Apr 2008 | Dec 2023 | Wind |
Clinton | Valcour Operating Services, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 135.3 GWh | Apr 2008 | Dec 2023 | Wind |
Shoreham Energy LLC | Shoreham Energy LLC | Shoreham, NY | New York Independent System Operator (NYIS) | 16.4 GWh | Jun 2002 | Dec 2023 | Kerosene |
Fenner Wind | CHI Energy Inc | Cazenovia, NY | New York Independent System Operator (NYIS) | 80.3 GWh | Sep 2001 | Dec 2023 | Wind |
Munnsville Wind Farm LLC | RWE Renewables Americas, LLC | Madison, NY | New York Independent System Operator (NYIS) | 86.1 GWh | Sep 2007 | Dec 2023 | Wind |
Steel Winds Wind Farm | Evergreen Wind, LLC | Lackawanna, NY | New York Independent System Operator (NYIS) | 64.6 GWh | May 2007 | Dec 2023 | Wind |
Hawkeye Energy Greenport LLC | Hawkeye Energy Greenport LLC | Greenport, NY | New York Independent System Operator (NYIS) | 17.8 GWh | Jun 2003 | Dec 2023 | Kerosene |
Equus Freeport Power | Equus Power I, L.P. | Village of Freeport, NY | New York Independent System Operator (NYIS) | 72.5 GWh | May 2004 | Dec 2022 | Natural Gas : 99.0% Kerosene : 1.0% |
Lower Beaver Falls Project | Eagle Creek Renewable Energy, LLC | Beaver Falls, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Nov 1979 | Dec 2023 | Water |
Colonie LFGTE Facility | Innovative Energy Systems Inc | Cohoes, NY | New York Independent System Operator (NYIS) | 37.8 GWh | Jan 2006 | Dec 2023 | Landfill Gas |
Jamaica Bay Peaking | Jamaica Bay Peaking Facility, LLC | Far Rockaway, NY | New York Independent System Operator (NYIS) | 60.9 GWh | Jun 2003 | Dec 2023 | Natural Gas : 85.6% Kerosene : 14.4% |
Modern Innovative Energy LLC | Innovative Energy Systems Inc | Youngstown, NY | New York Independent System Operator (NYIS) | 36.5 GWh | Jan 2006 | Dec 2023 | Landfill Gas |
Maple Ridge Wind Farm | Flat Rock Windpower, LLC | Lowville, NY | New York Independent System Operator (NYIS) | 631.9 GWh | Nov 2005 | Jun 2024 | Wind |
Empire Generating Co LLC | Empire Generating Co LLC | Rensselaer, NY | New York Independent System Operator (NYIS) | 3.7 TWh | Aug 2010 | Jun 2024 | Natural Gas |
Pinelawn Power LLC | Pinelawn Power LLC | West Babylon, NY | New York Independent System Operator (NYIS) | 174.2 GWh | Jun 2005 | Dec 2022 | Natural Gas : 99.4% Kerosene : 0.6% |
500MW CC | New York Power Authority | Astoria, NY | New York Independent System Operator (NYIS) | 4.1 TWh | Nov 2005 | Jun 2024 | Natural Gas |
Caithness Long Island Energy Center | Caithness Long Island, LLC | Yaphank, NY | New York Independent System Operator (NYIS) | 2.3 TWh | Jul 2009 | May 2024 | Natural Gas |
Ontario LFGTE | Seneca Energy II | Stanley, NY | New York Independent System Operator (NYIS) | 85.1 GWh | Oct 2003 | Dec 2023 | Landfill Gas |
Phoenix Hydro Project | Eagle Creek Renewable Energy, LLC | Phoenix, NY | New York Independent System Operator (NYIS) | 11.8 GWh | Dec 1990 | Dec 2023 | Water |
Hudson Falls Hydroelectric Project | Boralex Hydro Operations Inc | South Glens Falls, NY | New York Independent System Operator (NYIS) | 258.1 GWh | Oct 1995 | Dec 2023 | Water |
MM Albany Energy | MM Albany Energy LLC | Albany, NY | New York Independent System Operator (NYIS) | 9.9 GWh | Feb 1998 | Dec 2023 | Landfill Gas |
Batavia Power Plant | Seneca Power Partners LP | Batavia, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Aug 1992 | Dec 2023 | Natural Gas |
Astoria Gas Turbines | NRG Astoria Gas Turbine Operations Inc | Astoria, NY | New York Independent System Operator (NYIS) | 51.2 GWh | Dec 1969 | Dec 2022 | Natural Gas : 85.6% Kerosene : 14.4% |
Astoria Energy | Astoria Energy LLC | New York, NY | New York Independent System Operator (NYIS) | 4.6 TWh | Apr 2006 | Jun 2024 | Natural Gas : 99.9% |
Brooklyn Navy Yard Cogeneration | Brooklyn Navy Yard Cogen PLP | Brooklyn, NY | New York Independent System Operator (NYIS) | 2.3 TWh | Feb 1996 | Jun 2024 | Natural Gas |
Dunn Paper | BiOrigin Specialty Products | Gouverneur, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Dec 1958 | Dec 2023 | Water |
Athens Generating Plant | New Athens Generating Company LLC | Athens, NY | New York Independent System Operator (NYIS) | 2.8 TWh | Mar 2003 | Jun 2024 | Natural Gas |
New York University Central Plant | New York University | New York, NY | New York Independent System Operator (NYIS) | 80.8 GWh | Dec 1983 | Dec 2023 | Natural Gas : 91.9% Distillate Fuel Oil : 8.1% |
Seneca Energy | Seneca Energy II | Seneca Falls, NY | New York Independent System Operator (NYIS) | 84.7 GWh | Feb 1996 | Jun 2024 | Landfill Gas |
South Glens Falls Hydroelectric | Boralex Hydro Operations Inc | South Glens Falls, NY | New York Independent System Operator (NYIS) | 107.1 GWh | Jul 1994 | Dec 2023 | Water |
NYU Luthern Medical Center | NYU Langone Health | New York City, NY | New York Independent System Operator (NYIS) | 138.0 MWh | Dec 1993 | Dec 2023 | Distillate Fuel Oil |
Model City Energy Facility | Model City Energy LLC | Youngstown, NY | New York Independent System Operator (NYIS) | 31.1 GWh | May 2001 | Dec 2023 | Landfill Gas |
Bayswater Peaking Facility LLC | Bayswater Peaking Facility LLC | Far Rockaway, NY | New York Independent System Operator (NYIS) | 66.6 GWh | May 2002 | Dec 2023 | Natural Gas |
Glenmere Lake | AES Distributed Energy | Goshen, NY | ISO New England (ISNE) | 4.1 GWh | May 2021 | Dec 2023 | Solar : 99.7% |
Knapp West(CSG) | AES Distributed Energy | Akron, NY | ISO New England (ISNE) | 6.3 GWh | Nov 2021 | Dec 2023 | Solar |
Onondaga County- Clearwater | Tesla Inc. | Oswego, NY | ISO New England (ISNE) | 2.8 GWh | Jun 2017 | Dec 2023 | Solar |
Greene County Meter #1 | Tesla Inc. | Cairo, NY | ISO New England (ISNE) | 1.6 GWh | Jan 2018 | Dec 2023 | Solar |
Rowe (CSG) | AES Distributed Energy | Olean, NY | ISO New England (ISNE) | 8.4 GWh | Oct 2021 | Dec 2023 | Solar |
Redman South Community Solar | AES Distributed Energy | Brockport, NY | ISO New England (ISNE) | 8.7 GWh | Jan 2022 | Dec 2023 | Solar |
Townline Community Solar | AES Distributed Energy | Batavia, NY | ISO New England (ISNE) | 7.2 GWh | Jan 2022 | Dec 2023 | Solar |
Fredonia Solar LLC | Greenbacker Renewable Energy Corporation | Fredonia, NY | ISO New England (ISNE) | 1.6 GWh | Aug 2021 | Dec 2023 | Solar |
Dusenberry | AES Distributed Energy | Troy, NY | ISO New England (ISNE) | 8.3 GWh | Nov 2021 | Dec 2023 | Solar |
Knapp East (CSG) | AES Distributed Energy | Akron, NY | ISO New England (ISNE) | 7.5 GWh | Nov 2021 | Dec 2023 | Solar |
Main Rd Community Solar | AES Distributed Energy | Newstead, NY | ISO New England (ISNE) | 8.7 GWh | Jun 2022 | Dec 2023 | Solar |
Williams Rd | AES Distributed Energy | Ransomville, NY | ISO New England (ISNE) | 6.3 GWh | Aug 2021 | Dec 2023 | Solar |
Fishers Island 1 | Connecticut Mun Elec Engy Coop | Fisher's Island, NY | ISO New England (ISNE) | 159.9 MWh | Nov 2010 | Dec 2023 | Distillate Fuel Oil |
Westtown CSG | Altus Power America Management, LLC | Westtown, NY | ISO New England (ISNE) | 3.4 GWh | Apr 2019 | Dec 2023 | Solar |
Redman North Community Solar | AES Distributed Energy | Brockport, NY | ISO New England (ISNE) | 2.8 GWh | Jan 2022 | Dec 2023 | Solar |
RT405 Westerlo Solar 2 | RT405 Westerlo Solar 2, LLC | Albany, NY | ISO New England (ISNE) | 8.4 GWh | Feb 2020 | Dec 2023 | Solar |
LR Wheatfield Solar 1 | LR Wheatfield Solar 1, LLC | Wheatfield, NY | ISO New England (ISNE) | 8.8 GWh | Sep 2020 | Dec 2023 | Solar |
Pendleton Solar 1 | Pendleton Solar 1, LLC | Lockport, NY | ISO New England (ISNE) | 7.5 GWh | Sep 2020 | Dec 2023 | Solar |
Cream Street Solar | Cream Street Solar, LLC | Hyde Park, NY | ISO New England (ISNE) | 3.8 GWh | Nov 2020 | Dec 2023 | Solar |
Little Falls Solar | Little Falls Solar | Little Falls, NY | ISO New England (ISNE) | 3.6 GWh | Sep 2020 | Dec 2023 | Solar |
Little Falls Solar 1 | Little Falls Solar 1, LLC | Little Falls, NY | ISO New England (ISNE) | 3.5 GWh | Aug 2020 | Dec 2023 | Solar |
1639 RT 29 Solar 1 | 1639 RT 29 Solar 1, LLC | Gloversville, NY | ISO New England (ISNE) | 7.6 GWh | Nov 2020 | Dec 2023 | Solar |
1639 RT 29 Solar 2 | 1639 RT 29 Solar 2, LLC | Gloversville, NY | ISO New England (ISNE) | 4.8 GWh | Nov 2020 | Dec 2023 | Solar |
Lenox Renewables | Lenox Renewables, LLC | Canastota, NY | ISO New England (ISNE) | 5.7 GWh | Aug 2021 | Dec 2023 | Solar |
Carver Falls | Green Mountain Power Corp | Hampton, NY | ISO New England (ISNE) | 11.6 GWh | Jan 1922 | Dec 2023 | Water |
Sugar Hill Solar 1 | Sugar Hill Solar 1, LLC | Clifton Park, NY | ISO New England (ISNE) | 8.6 GWh | Nov 2020 | Dec 2023 | Solar |
3104 Batavia Solar | 3104 Batavia Solar, LLC | Batavia, NY | ISO New England (ISNE) | 5.2 GWh | Feb 2021 | Dec 2022 | Solar |
3232 Batavia Solar | 3232 Batavia Solar, LLC | Batavia, NY | ISO New England (ISNE) | 7.2 GWh | Feb 2021 | Dec 2023 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2023 generation numbers.County | State Rank | Active Plants | Dec 2023 Generation |
---|---|---|---|
Franklin County, NY | # 29 | 13 | 427.2 GWh |
Westchester County, NY | # 28 | 30 | 468.1 GWh |
Bronx County, NY | # 27 | 14 | 475.3 GWh |
Onondaga County, NY | # 26 | 28 | 492.6 GWh |
Monroe County, NY | # 25 | 34 | 549.0 GWh |
Yates County, NY | # 24 | 3 | 686.8 GWh |
Chautauqua County, NY | # 23 | 17 | 741.3 GWh |
Jefferson County, NY | # 22 | 36 | 833.8 GWh |
Wyoming County, NY | # 21 | 15 | 911.3 GWh |
Steuben County, NY | # 20 | 21 | 1.1 TWh |
Clinton County, NY | # 19 | 22 | 1.3 TWh |
Rockland County, NY | # 18 | 10 | 1.4 TWh |
Richmond County, NY | # 17 | 15 | 1.4 TWh |
Lewis County, NY | # 16 | 27 | 1.6 TWh |
Saratoga County, NY | # 15 | 33 | 2.4 TWh |
Kings County, NY | # 14 | 29 | 2.5 TWh |
Greene County, NY | # 13 | 12 | 2.8 TWh |
Nassau County, NY | # 12 | 25 | 3.0 TWh |
New York County, NY | # 11 | 18 | 3.5 TWh |
Rensselaer County, NY | # 10 | 20 | 4.0 TWh |
Albany County, NY | # 9 | 26 | 5.0 TWh |
Dutchess County, NY | # 8 | 21 | 5.3 TWh |
Wayne County, NY | # 7 | 10 | 5.4 TWh |
Orange County, NY | # 6 | 52 | 5.7 TWh |
Suffolk County, NY | # 5 | 63 | 8.3 TWh |
St. Lawrence County, NY | # 4 | 58 | 9.5 TWh |
Niagara County, NY | # 3 | 18 | 17.4 TWh |
Queens County, NY | # 2 | 21 | 18.0 TWh |
Oswego County, NY | # 1 | 30 | 31.0 TWh |