Directory of Power Plants in Nevada
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Ft. Churchill PV | Sierra Pacific Power Co | Yerington, NV | Nevada Power Company (NEVP) | 23.7 GWh | Apr 2015 | Dec 2023 | Solar |
Fort Churchill | Sierra Pacific Power Co | Yerington, NV | Nevada Power Company (NEVP) | 508.0 GWh | Aug 1968 | Aug 2024 | Natural Gas |
Whitegrass No. 1 | Open Mountain Energy LLC. | Yerington, NV | Nevada Power Company (NEVP) | 17.7 GWh | Sep 2018 | Dec 2023 | Geothermal |
NGP Blue Mountain I LLC | NGP Blue Mountain I LLC | Winnemucca, NV | Nevada Power Company (NEVP) | 193.9 GWh | Oct 2009 | Dec 2023 | Geothermal |
Verdi | Truckee Meadows Water Authority | Verdi, NV | Nevada Power Company (NEVP) | 19.1 GWh | Dec 1910 | Aug 2024 | Water |
Washoe | Truckee Meadows Water Authority | Verdi, NV | Nevada Power Company (NEVP) | 11.1 GWh | Dec 1903 | Dec 2023 | Water |
North Valmy | Sierra Pacific Power Co | Valmy, NV | Nevada Power Company (NEVP) | 1.2 TWh | Nov 1981 | Aug 2024 | Bituminous Coal : 50.3% Subbituminous Coal : 49.2% |
Gemini Solar | Gemini Solar | Unincorporated, NV | Nevada Power Company (NEVP) | 1.0 TWh | - | Aug 2024 | Solar |
Tuscarora Geothermal Power Plant | Ormat Nevada Inc | Tuscarora, NV | Nevada Power Company (NEVP) | 125.8 GWh | Dec 2011 | Dec 2023 | Geothermal |
Crescent Dunes Solar Energy | Tonopah Solar Energy LLC | Tonopah, NV | Nevada Power Company (NEVP) | 162.3 GWh | Oct 2015 | Aug 2024 | Solar |
Tesla Reno GigaFactory | Tesla Inc. | Sparks, NV | Nevada Power Company (NEVP) | 11.1 GWh | May 2019 | Dec 2023 | Solar |
Waste Management Lockwood LFGTE | WM Renewable Energy LLC | Sparks, NV | Nevada Power Company (NEVP) | 23.7 GWh | Feb 2012 | Dec 2023 | Landfill Gas |
Turquoise Nevada, LLC | Greenbacker Renewable Energy Corporation | Sparks, NV | Nevada Power Company (NEVP) | 106.3 GWh | Nov 2020 | Aug 2024 | Solar |
Tracy | Sierra Pacific Power Co | Sparks, NV | Nevada Power Company (NEVP) | 4.0 TWh | Jul 1963 | Aug 2024 | Natural Gas |
Turquoise Liberty Solar | Liberty Utilities (CalPeco Electric) LLC | Sparks, NV | Nevada Power Company (NEVP) | 14.8 GWh | Oct 2019 | Dec 2023 | Solar |
Searchlight Solar | Altus Power America Management, LLC | Searchlight, NV | Nevada Power Company (NEVP) | 42.6 GWh | Nov 2014 | Dec 2023 | Solar |
Galena 2 Geothermal Power Plant | Ormat Nevada Inc | Reno, NV | Nevada Power Company (NEVP) | 38.1 GWh | Mar 2007 | Dec 2023 | Geothermal |
Galena 3 Geothermal Power Plant | Ormat Nevada Inc | Reno, NV | Nevada Power Company (NEVP) | 92.1 GWh | Jan 2008 | Dec 2023 | Geothermal |
Richard Burdette Geothermal | Ormat Nevada Inc | Reno, NV | Nevada Power Company (NEVP) | 110.1 GWh | Oct 2005 | Dec 2023 | Geothermal |
Steamboat III | Steamboat Development Corp | Reno, NV | Nevada Power Company (NEVP) | 45.6 GWh | Sep 1992 | Dec 2023 | Geothermal |
Steamboat II | Steamboat Development Corp | Reno, NV | Nevada Power Company (NEVP) | 42.1 GWh | Jul 1992 | Dec 2023 | Geothermal |
Steamboat Hills LP | Ormat Nevada Inc | Reno, NV | Nevada Power Company (NEVP) | 235.6 GWh | Jan 1988 | Dec 2023 | Geothermal |
Dodge Flat | Dodge Flat Solar, LLC | Reno, NV | Nevada Power Company (NEVP) | 540.8 GWh | Feb 2022 | Aug 2024 | Solar |
Fish Springs | Fish Springs Ranch Solar, LLC | Reno, NV | Nevada Power Company (NEVP) | 251.6 GWh | Feb 2022 | Aug 2024 | Solar |
Silver State Solar Power North | Silver State Solar Power North, LLC | Primm, NV | Nevada Power Company (NEVP) | 112.8 GWh | Apr 2012 | Aug 2024 | Solar |
Higgins Generating Station | Nevada Power Co | Primm, NV | Nevada Power Company (NEVP) | 2.3 TWh | Jan 2004 | Aug 2024 | Natural Gas |
Silver State Solar Power South | Silver State Solar Power South, LLC | Primm Valley, NV | California Independent System Operator (CISO) | 647.5 GWh | Oct 2015 | Aug 2024 | Solar |
MDU / NVSS-II | Greenbacker Renewable Energy Corporation | Pahrump, NV | Nevada Power Company (NEVP) | 18.7 GWh | Jan 2017 | Dec 2023 | Solar |
NVSS-II | NVSS-II | Pahrump, NV | Nevada Power Company (NEVP) | 32.7 GWh | Jan 2017 | Dec 2022 | Solar |
Silverhawk | Nevada Power Co | North Las Vegas, NV | Nevada Power Company (NEVP) | 2.8 TWh | Apr 2004 | Aug 2024 | Natural Gas |
Apex Solar PV Power Project | Southern Power Co | North Las Vegas, NV | Nevada Power Company (NEVP) | 49.7 GWh | Jun 2012 | Dec 2023 | Solar |
Mountain View Solar | NextEra Energy Mountain View Solar | North Las Vegas, NV | Nevada Power Company (NEVP) | 53.8 GWh | Dec 2013 | Aug 2024 | Solar |
IGS VGT | Greenbacker Renewable Energy Corporation | North Las Vegas, NV | Nevada Power Company (NEVP) | 86.0 MWh | Oct 2023 | Dec 2023 | Solar |
Playa Solar 2 | EDF Renewable Asset Holdings, Inc. | North Las Vegas, NV | Nevada Power Company (NEVP) | 245.8 GWh | Jul 2017 | Aug 2024 | Solar |
Nellis Solar PV II | Nevada Power Co | North Las Vegas, NV | Nevada Power Company (NEVP) | 38.0 GWh | Oct 2015 | Aug 2024 | Solar |
Playa Solar 1, LLC | EDF Renewable Asset Holdings, Inc. | North Las Vegas, NV | Nevada Power Company (NEVP) | 187.9 GWh | Sep 2017 | Aug 2024 | Solar |
Las Vegas Generating Station | Nevada Power Co | North Las Vegas, NV | Nevada Power Company (NEVP) | 410.0 GWh | Feb 1994 | Aug 2024 | Natural Gas |
Moapa Southern Paiute | Arevon Energy, Inc. | Moapa, NV | Nevada Power Company (NEVP) | 604.0 GWh | Nov 2016 | Aug 2024 | Solar |
Dry Lake Solar Energy Center | Nevada Power Co | Moapa, NV | Nevada Power Company (NEVP) | 165.8 GWh | - | Aug 2024 | Solar |
Arrow Canyon Solar Hybrid | Arrow Canyon Solar LLC | Moapa, NV | Nevada Power Company (NEVP) | 612.4 GWh | Nov 2023 | Aug 2024 | Solar |
Eagle Shadow Mountain Solar Farm | 325MK 8me LLC | Moapa River Indian Re, NV | Nevada Power Company (NEVP) | 908.6 GWh | Apr 2023 | Aug 2024 | Solar |
Western 102 Power Plant | Nevada Gold Mines | McCarran, NV | Nevada Power Company (NEVP) | 491.8 GWh | Nov 2005 | Aug 2024 | Natural Gas : 99.7% |
Don A Campbell 2 Geothermal | ORNI 37 LLC | Luning, NV | Nevada Power Company (NEVP) | 99.5 GWh | Aug 2015 | Dec 2023 | Geothermal |
Luning Energy | Liberty Utilities (CalPeco Electric) LLC | Luning, NV | Nevada Power Company (NEVP) | 109.2 GWh | Jan 2017 | Aug 2024 | Solar |
Solar Las Vegas MB-1 | NRG Solar Las Vegas MB-1 | Las Vegas, NV | Nevada Power Company (NEVP) | 8.7 GWh | Jan 2015 | Dec 2023 | Solar |
Dignity - San Martin | MN8 Energy LLC | Las Vegas, NV | Nevada Power Company (NEVP) | 3.7 GWh | Apr 2018 | Dec 2023 | Solar |
IKEA Las Vegas 462 | IKEA Property Inc | Las Vegas, NV | Nevada Power Company (NEVP) | 1.4 GWh | Apr 2016 | Dec 2023 | Solar |
Clark (NVE) | Nevada Power Co | Las Vegas, NV | Nevada Power Company (NEVP) | 693.0 GWh | May 1973 | Aug 2024 | Natural Gas |
Spectrum Solar PV Power Project | Southern Power Co | Las Vegas, NV | Nevada Power Company (NEVP) | 83.0 GWh | Aug 2013 | Dec 2023 | Solar |
Solar Las Vegas MB 2, LLC | NRG Solar Las Vegas MB 2 | Las Vegas, NV | Nevada Power Company (NEVP) | 3.7 GWh | Jun 2016 | Dec 2023 | Solar |
Republic Services Renewable Energy, LLC | Republic Services Renewable Energy, LLC | Las Vegas, NV | Nevada Power Company (NEVP) | 30.0 GWh | Feb 2012 | Dec 2023 | Landfill Gas |
Las Vegas WPCF Solar Plant | City of Las Vegas | Las Vegas, NV | Nevada Power Company (NEVP) | 5.8 GWh | Apr 2013 | Dec 2023 | Solar |
Sun Peak Generating Station | Nevada Power Co | Las Vegas, NV | Nevada Power Company (NEVP) | 31.6 GWh | May 1991 | Dec 2023 | Natural Gas |
Nevada Cogen Assoc#1 GarnetVly | Nevada Cogeneration Assoc # 1 | Las Vegas, NV | Nevada Power Company (NEVP) | 421.0 GWh | Mar 1992 | Aug 2024 | Natural Gas |
Nevada Cogen Associates 2 Black Mountain | Nevada Cogeneration Assoc # 2 | Las Vegas, NV | Nevada Power Company (NEVP) | 454.0 GWh | Oct 1992 | Aug 2024 | Natural Gas |
CityCenter Central Plant Cogen Units | CityCenter Land LLC | Las Vegas, NV | Nevada Power Company (NEVP) | 63.8 GWh | Nov 2009 | Aug 2024 | Natural Gas |
Apex Generating Station | Apex Generating Station | Las Vegas, NV | Nevada Power Company (NEVP) | 2.4 TWh | Apr 2003 | Aug 2024 | Natural Gas |
Nellis Air Force Base Solar Array | Solar Star NAFB LLC | Las Vegas, NV | Nevada Power Company (NEVP) | 21.7 GWh | Sep 2007 | Dec 2023 | Solar |
Harry Allen | Nevada Power Co | Las Vegas, NV | Nevada Power Company (NEVP) | 2.4 TWh | Apr 1995 | Aug 2024 | Natural Gas |
Goodsprings Waste Heat Recovery | Nevada Power Co | Jean, NV | Nevada Power Company (NEVP) | 22.2 GWh | Oct 2010 | Aug 2024 | Waste Heat |
Jersey Valley Geothermal Power Plant | Ormat Nevada Inc | Imlay, NV | Nevada Power Company (NEVP) | 66.7 GWh | Nov 2010 | Dec 2023 | Geothermal |
Star Peak Geothermal Plant | Star Peak Geothermal LLC. | Imlay, NV | Nevada Power Company (NEVP) | 51.8 GWh | Jul 2022 | Dec 2023 | Geothermal |
Dignity - Siena Campus | MN8 Energy LLC | Henderson, NV | Nevada Power Company (NEVP) | 2.9 GWh | Apr 2018 | Dec 2023 | Solar |
IGS LAS1 | Greenbacker Renewable Energy Corporation | Henderson, NV | Nevada Power Company (NEVP) | 1.0 GWh | Jun 2023 | Dec 2023 | Solar |
Saguaro Power | Saguaro Power Co | Henderson, NV | Nevada Power Company (NEVP) | 210.4 GWh | Aug 1991 | Aug 2024 | Natural Gas |
River Mountains Solar | River Mountains Solar, LLC | Henderson, NV | Nevada Power Company (NEVP) | 28.9 GWh | Dec 2015 | Dec 2023 | Solar |
Patua Acquisition Project, LLC | Patua Acquisition Company, LLC | Hazen, NV | Nevada Power Company (NEVP) | 137.1 GWh | Nov 2013 | Dec 2023 | Geothermal : 81.1% Solar : 18.9% |
North Valley | North Valley | Gerlach, NV | Nevada Power Company (NEVP) | 215.3 GWh | Mar 2023 | Aug 2024 | Geothermal |
San Emidio | USG Nevada LLC | Gerlach, NV | Nevada Power Company (NEVP) | 83.0 GWh | Apr 2012 | Dec 2023 | Geothermal |
Don A Campbell 1 Geothermal | ORNI 47, LLC | Gabbs, NV | Nevada Power Company (NEVP) | 118.8 GWh | Dec 2013 | Dec 2023 | Geothermal |
Fleish | Truckee Meadows Water Authority | Fleish, NV | Nevada Power Company (NEVP) | 20.7 GWh | Dec 1913 | Aug 2024 | Water |
Desert Peak Power Plant | Ormat Nevada Inc | Fernley, NV | Nevada Power Company (NEVP) | 91.9 GWh | May 2006 | Dec 2023 | Geothermal |
Lahontan | Truckee-Carson Irrigation District | Fallon, NV | Nevada Power Company (NEVP) | 8.4 GWh | Dec 1910 | Nov 2023 | Water |
New Lahontan | Truckee-Carson Irrigation District | Fallon, NV | Nevada Power Company (NEVP) | 17.2 GWh | Mar 1989 | Nov 2023 | Water |
Soda Lake 3 | AMOR IX, LLC | Fallon, NV | Nevada Power Company (NEVP) | 108.4 GWh | Oct 2019 | Aug 2024 | Geothermal |
Stillwater Facility | Enel Stillwater LLC | Fallon, NV | Nevada Power Company (NEVP) | 123.7 GWh | Feb 2009 | Dec 2023 | Geothermal : 70.0% Solar : 30.0% |
Tungsten Mountain | Tungsten Mountain | Fallon, NV | Nevada Power Company (NEVP) | 347.9 GWh | Nov 2017 | Aug 2024 | Geothermal : 92.1% Solar : 7.9% |
Brady | Ormat Nevada Inc | Fallon, NV | Nevada Power Company (NEVP) | 95.0 GWh | May 1992 | Dec 2023 | Geothermal |
Dixie Valley | Ormat Nevada Inc | Fallon, NV | California Independent System Operator (CISO) | 415.9 GWh | May 1988 | Aug 2024 | Geothermal |
ENEL Salt Wells LLC | ENEL Salt Wells LLC | Fallon, NV | Nevada Power Company (NEVP) | 73.2 GWh | Feb 2009 | Dec 2023 | Geothermal |
EGP Stillwater Solar PV II, LLC | EGP Stillwater Solar PV II, LLC | Fallon, NV | Nevada Power Company (NEVP) | 32.4 GWh | May 2018 | Dec 2023 | Solar |
Yellow Pine Solar | Yellow Pine Solar, LLC | Enterprise, NV | Nevada Power Company (NEVP) | 377.8 GWh | Jun 2023 | Aug 2024 | Solar |
Yellow Pine II | Yellow Pine Solar II, LLC | Enterprise, NV | Nevada Power Company (NEVP) | 109.8 GWh | - | Aug 2024 | Solar |
Spring Valley Wind Project | Pattern Operators LP | Ely, NV | Nevada Power Company (NEVP) | 289.9 GWh | Jul 2012 | Aug 2024 | Wind |
Techren Solar II LLC | Techren Solar II LLC | Boulder, NV | Nevada Power Company (NEVP) | 515.8 GWh | Sep 2019 | Aug 2024 | Solar |
Techren Solar III LLC | Techren Solar III LLC | Boulder, NV | Nevada Power Company (NEVP) | 59.4 GWh | Sep 2020 | Aug 2024 | Solar |
Techren Solar IV LLC | Techren Solar IV LLC | Boulder, NV | Nevada Power Company (NEVP) | 58.5 GWh | Sep 2020 | Aug 2024 | Solar |
Techren Solar I LLC | Techren Solar I LLC | Boulder, NV | Nevada Power Company (NEVP) | 196.8 GWh | Feb 2019 | Aug 2024 | Solar |
Techren Solar V | Techren Solar V LLC | Boulder, NV | Nevada Power Company (NEVP) | 118.5 GWh | Nov 2020 | Aug 2024 | Solar |
Boulder Solar Power, LLC | Southern Power Co | Boulder City, NV | Nevada Power Company (NEVP) | 268.2 GWh | Nov 2016 | Aug 2024 | Solar |
Copper Mountain Solar 2 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 348.7 GWh | Jun 2012 | Dec 2023 | Solar |
Hoover Dam (NV) | U S Bureau of Reclamation | Boulder City, NV | Western Area Power Administration - Desert Southwest Region (WALC) | 1.4 TWh | Aug 1936 | Aug 2024 | Water |
Copper Mountain Solar 3 | Consolidated Edison Development Inc. | Boulder City, NV | Los Angeles Department of Water and Power (LDWP) | 610.5 GWh | Apr 2014 | Aug 2024 | Solar |
CM48 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 93.3 GWh | May 2010 | Dec 2023 | Solar |
Copper Mountain Solar 4, LLC | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 214.2 GWh | Aug 2016 | Dec 2023 | Solar |
CM10 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 19.2 GWh | Nov 2008 | Dec 2023 | Solar |
Nevada Solar One | Acciona Solar Power | Boulder City, NV | Nevada Power Company (NEVP) | 94.1 GWh | May 2007 | Aug 2024 | Solar : 97.9% Natural Gas : 2.1% |
Copper Mountain Solar 5, LLC | Consolidated Edison Development Inc. | Boulder City, NV | Nevada Power Company (NEVP) | 685.2 GWh | Feb 2021 | Aug 2024 | Solar |
Desert Star Energy Center | Desert Star Energy Center SDG&E | Boulder City, NV | California Independent System Operator (CISO) | 1.2 TWh | Apr 2000 | Aug 2024 | Natural Gas |
Townsite Solar Project Hybrid | Townsite Solar, LLC | Boulder City, NV | Western Area Power Administration - Desert Southwest Region (WALC) | 444.2 GWh | Nov 2021 | Aug 2024 | Solar |
Browse Power Plants By Nevada Counties
Figures are based on December 2023 generation numbers.County | State Rank | Active Plants | Dec 2023 Generation |
---|---|---|---|
Pershing County, NV | # 13 | 2 | 118.5 GWh |
Elko County, NV | # 12 | 1 | 125.8 GWh |
White Pine County, NV | # 11 | 3 | 289.9 GWh |
Mineral County, NV | # 10 | 3 | 327.4 GWh |
Nye County, NV | # 9 | 7 | 467.3 GWh |
Lyon County, NV | # 8 | 5 | 641.4 GWh |
Lander County, NV | # 7 | 7 | 1.3 TWh |
County | State Rank | Active Plants | Dec 2023 Generation |
---|---|---|---|
Eureka County, NV | # 6 | 1 | 1.3 TWh |
Churchill County, NV | # 5 | 13 | 1.4 TWh |
Humboldt County, NV | # 4 | 6 | 1.6 TWh |
Washoe County, NV | # 3 | 21 | 1.9 TWh |
Storey County, NV | # 2 | 5 | 4.5 TWh |
Clark County, NV | # 1 | 77 | 31.1 TWh |