Directory of Power Plants in Minnesota
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Huneke CSG 2, LLC | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2020 | Dec 2023 | Solar |
Huneke I CSG | Huneke I CSG LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2018 | Dec 2023 | Solar |
FastSun 10 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2020 | Dec 2023 | Solar |
Huneke II CSG | Terraform Arcadia | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2018 | Dec 2023 | Solar |
Goodhue Community Solar One LLC CSG | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jan 2020 | Dec 2023 | Solar |
FastSun 11 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Feb 2020 | Dec 2023 | Solar |
Novel Huneke Solar LLC CSG | REA Investments, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Aug 2021 | Dec 2023 | Solar |
T Luhman CSG | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jul 2021 | Dec 2023 | Solar |
Huneke CSG 1, LLC | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Sep 2020 | Dec 2023 | Solar |
Goodhue Community Solar Three LLC CSG | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jan 2020 | Dec 2023 | Solar |
Zumbro Community Solar Garden | Zumbro Solar LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2018 | Dec 2023 | Solar |
FastSun 9 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Feb 2020 | Dec 2023 | Solar |
Goodhue Community Solar Two LLC | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Mar 2020 | Dec 2023 | Solar |
Brenda Luhman - CSG | Brenda Luhman Community Solar LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jul 2020 | Dec 2023 | Solar |
Carina Community Solar | Carina Community Solar | Zumbro Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Jan 2018 | Dec 2023 | Solar |
Lind Solar CSG | Terraform Arcadia | Young America, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Jan 2017 | Dec 2023 | Solar |
Wyoming 2 CSG, LLC | Ecoplexus, Inc | Wyoming, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Feb 2018 | Dec 2023 | Solar |
MP CSG 1 LLC | United States Solar Corporation | Wrenshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2017 | Dec 2023 | Solar |
Ewington Energy Systems, LLC | Ewington Energy Systems, LLC | Worthington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 88.3 GWh | Dec 2007 | Dec 2023 | Wind |
Worthington | City of Worthington - (MN) | Worthington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 GWh | Jan 2002 | Dec 2023 | Wind : 99.5% |
Fey Windfarm LLC | Fey Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Aug 2003 | Dec 2023 | Wind |
K-Brink Windfarm LLC | K-brink Windfarm, LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jan 2003 | Dec 2023 | Wind |
Windcurrent Farms LLC | Windcurrent Farms LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Aug 2003 | Dec 2023 | Wind |
Boeve Windfarm LLC | Boeve Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Jul 2003 | Dec 2023 | Wind |
Kas Brothers Windfarm | Kas Brothers Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Nov 2001 | Dec 2023 | Wind |
Moraine II Wind LLC | Avangrid Renewables LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 78.0 GWh | Jan 2009 | Dec 2023 | Wind |
Ridgewind | Ridgewind Power Partners LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 78.9 GWh | Dec 2010 | Dec 2023 | Wind |
Rock Aetna Power Partners | Northern States Power Co - Minnesota | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 79.3 GWh | Nov 2022 | Dec 2023 | Wind |
CG Windfarm LLC | CG Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Nov 2003 | Dec 2023 | Wind |
Stoneray Power Partners, LLC | EDF Renewable Asset Holdings, Inc. | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 316.6 GWh | Jan 2019 | Aug 2024 | Wind |
Moraine Wind LLC | Avangrid Renewables LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 70.6 GWh | Nov 2003 | Dec 2023 | Wind |
Woodstock Windfarm | Consolidated Edison Development Inc. | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 34.9 GWh | Apr 1999 | Dec 2023 | Wind |
Grant County Wind LLC | Grant County Wind, LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 51.3 GWh | Jul 2010 | Dec 2023 | Wind |
Westridge Windfarm LLC | Westridge Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Oct 2003 | Jan 2023 | Wind |
Woodbury Solar | MN CSG 2, LLC | Woodbury, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Jun 2020 | Dec 2023 | Solar |
USS Wolf Solar LLC | United States Solar Corporation | Wood Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 GWh | Jun 2023 | Dec 2023 | Solar |
Winton | ALLETE, Inc. | Winton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Jul 1923 | Dec 2023 | Water |
Nautilus Winsted Solar (CSG) | Nautilus Solar Solutions | Winsted, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Mar 2019 | Aug 2024 | Solar |
Montgomery Winsted CSG | Minnesota Solar CSG 4, LLC | Winsted, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Oct 2017 | Dec 2023 | Solar |
South Garden | South Garden LLC | Winstead, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Jun 2023 | Dec 2023 | Solar |
Eichtens II CSG | Terraform Arcadia | Winstead, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2018 | Dec 2023 | Solar |
Barone CSG | Terraform Arcadia | Winstead, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Sep 2018 | Dec 2023 | Solar |
Stockton (MN) | Greenbacker Renewable Energy Corporation | Winona, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Oct 2021 | Dec 2023 | Solar |
Windom | City of Windom | Windom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 56.0 MWh | May 1980 | Dec 2023 | Distillate Fuel Oil |
Noble Ridge LLC | RENEW Energy Inc | Wilmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 80.8 MWh | Nov 2001 | Nov 2023 | Wind |
Nobles 2 Wind Project | Nobles 2 Power Partners, LLC | Wilmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 958.7 GWh | Nov 2020 | Aug 2024 | Wind |
Willmar | Willmar Municipal Utilities | Willmar, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Aug 1956 | Dec 2023 | Wind |
Willmar Municipal SW Substation | Willmar Municipal Utilities | Willmar, MN | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 MWh | May 2000 | Dec 2023 | Distillate Fuel Oil |
Willmar Municipal East Substation | Willmar Municipal Utilities | Willmar, MN | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 MWh | May 2000 | Dec 2023 | Distillate Fuel Oil |
Westbrook | City of Westbrook | Westbrook, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Sep 2003 | Dec 2023 | Distillate Fuel Oil |
Wells IC | City of Wells - (MN) | Wells, MN | Midcontinent Independent System Operator, Inc. (MISO) | 128.0 MWh | Oct 1950 | Dec 2023 | Natural Gas : 62.7% Distillate Fuel Oil : 37.3% |
Welcome Wind Turbine | Federated Rural Electric Assn | Welcome, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Apr 2008 | Dec 2023 | Wind |
Prairie Island | Northern States Power Co - Minnesota | Welch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 TWh | Jan 1974 | Aug 2024 | Nuclear |
USS Centerfield Solar CSG | Standard Solar | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Oct 2019 | Dec 2023 | Solar |
Veseli Community Solar Garden | Veseli Solar I LLC | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Jan 2018 | Dec 2023 | Solar |
Schultz CSG | DG Minnesota CSG, LLC | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Oct 2018 | Dec 2023 | Solar |
Webster Holdco Solar CSG | Webster Holdco LLC | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Jun 2017 | Dec 2023 | Solar |
USS Webster Solar CSG | Standard Solar | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Apr 2019 | Dec 2023 | Solar |
WaveSun Community Solar | Generate Capital | Waverly, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Nov 2017 | Dec 2023 | Solar |
Waterville CSG Solar Holdings LLC | Altus Power America Management, LLC | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Feb 2018 | Aug 2024 | Solar |
Lyra Community Solar | Lyra Community Solar | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Jan 2018 | Dec 2023 | Solar |
USS Water Town Solar LLC CSG | United States Solar Corporation | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Oct 2021 | Dec 2023 | Solar |
USS Water City Solar LLC CSG | United States Solar Corporation | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Sep 2021 | Dec 2023 | Solar |
Marigold Community Solar Garden, LLC | National Grid Renewables | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Dec 2020 | Dec 2023 | Solar |
Novel Peter Solar CSG | REA Investments, LLC | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2021 | Dec 2023 | Solar |
LeSun CSG, LLC | Cypress Creek Renewables | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.5 GWh | Dec 2017 | Dec 2023 | Solar |
Nesvold Watertown Solar | SoCore Energy LLC | Watertown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Dec 2017 | Dec 2023 | Solar |
Waterford Holdco CSG | Waterford Holdco LLC | Waterford, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Oct 2017 | Dec 2023 | Solar |
CF Novel Solar CSG Gardens Five, LLC | Cypress Creek Renewables | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Nov 2017 | Dec 2023 | Solar |
Silver Lake Garden | Excelsior Energy Capital | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Dec 2020 | Jan 2023 | Solar |
Novel David Solar LLC CSG | REA Investments, LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Feb 2022 | Dec 2023 | Solar |
Novel Winegar Partnership Solar CSG | REA Investments, LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Mar 2021 | Dec 2023 | Solar |
Novel Kanewischer Solar CSG | REA Investments, LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Sep 2020 | Dec 2023 | Solar |
Severson Garden | Severson HoldCo LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Sep 2020 | Dec 2023 | Solar |
Everson Garden | Everson Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Apr 2022 | Dec 2023 | Solar |
Lily Garden | Lily Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 GWh | Jun 2023 | Dec 2023 | Solar |
WasecaSun | National Grid Renewables | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.6 GWh | Jan 2018 | Dec 2023 | Solar |
Novel Haley Solar CSG | REA Investments, LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | May 2020 | Dec 2023 | Solar |
Clear Garden CSG | Clear Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2019 | Dec 2023 | Solar |
Waseca Solar | Enel Green Power NA, Inc. | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 20.9 GWh | Nov 2016 | Dec 2023 | Solar |
Loon Garden | Loon Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jan 2020 | Dec 2023 | Solar |
Buffalo Garden | Buffalo Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2020 | Dec 2023 | Solar |
Winegar CSG | Terraform Arcadia | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Sep 2018 | Dec 2023 | Solar |
Lahr 1, LLC | SoCore Energy LLC | Wakefield Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 GWh | Dec 2017 | Dec 2023 | Solar |
Held Solar Project | DG Minnesota CSG, LLC | Waite Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Feb 2019 | Dec 2023 | Solar |
GSSP Schneider LLC | Green Street Power Partners | Waite Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Sep 2019 | Dec 2023 | Solar |
Lake Waconia IV Community Solar Garden | Lake Waconia Solar IV LLC | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 785.0 MWh | Jan 2018 | Dec 2023 | Solar |
Lake Waconia Community Solar Garden | Lake Waconia Solar LLC | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 785.0 MWh | Jan 2018 | Dec 2023 | Solar |
USS DVL Solar CSG | Standard Solar | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jul 2019 | Dec 2023 | Solar |
Porter Way Community Solar Garden | AEP Onsite Partners, LLC | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Jan 2018 | Aug 2024 | Solar |
USS King 2 CSG | Standard Solar | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2019 | Dec 2023 | Solar |
Wabasha Solar | Wabasha Solar LLC | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Jul 2019 | Dec 2023 | Solar |
Wabasha Holdco Solar CSG | Wabasha Holdco LLC | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Feb 2017 | Dec 2023 | Solar |
SolarClub 20 LLC | Nautilus Solar Solutions | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2020 | Dec 2023 | Solar |
Swan Garden | Swan Garden LLC | Villard, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Sep 2021 | Dec 2023 | Solar |
Leven Garden Solar | Leven Garden LLC | Villard, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2020 | Dec 2023 | Solar |
Community Wind North LLC | Northern States Power Co - Minnesota | Verdi Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 109.4 GWh | Apr 2011 | Dec 2023 | Wind |
Truman | City of Truman | Truman, MN | Midcontinent Independent System Operator, Inc. (MISO) | 18.0 MWh | Aug 1938 | Dec 2023 | Distillate Fuel Oil |
OREG 3 Inc | Ormat Nevada Inc | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 35.8 GWh | Jul 2010 | Aug 2024 | Waste Heat |
Elm Creek Wind LLC | Avangrid Renewables LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 208.9 GWh | Nov 2008 | Dec 2023 | Wind |