Directory of Power Plants in Maryland
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Eastern Correctional Institute | Maryland Environmental Service | Westover, MD | PJM Interconnection, LLC (PJM) | 5.7 GWh | Jul 1987 | Jul 2023 | Wood/Wood Waste Solids : 95.8% Distillate Fuel Oil : 4.2% |
Criterion | Criterion Power Partners LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 233.8 GWh | Nov 2010 | Sep 2024 | Wind |
Roth Rock North Wind Farm, LLC | Roth Rock Wind Farm LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 23.1 GWh | Jul 2011 | Sep 2024 | Wind |
Roth Rock Wind Farm LLC | Roth Rock Wind Farm LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 92.5 GWh | Jul 2011 | Sep 2024 | Wind |
Fair Wind | Fair Wind Power Partners, LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 81.0 GWh | Oct 2015 | Sep 2024 | Wind |
Fourmile Ridge | Fourmile Wind Energy, LLC | Frostburg, MD | PJM Interconnection, LLC (PJM) | 110.4 GWh | Nov 2014 | Sep 2024 | Wind |
Deep Creek | BP Piney & Deep Creek LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 19.7 GWh | Jun 1925 | Dec 2023 | Water |
Conowingo | Constellation Power, Inc | Darlington, MD | PJM Interconnection, LLC (PJM) | 2.0 TWh | Feb 1928 | Sep 2024 | Water |
Brookville Smart Bus Depot Microgrid | AlphaStruxure Service Co LP | Silver Spring, MD | PJM Interconnection, LLC (PJM) | 2.2 GWh | Sep 2022 | Dec 2023 | Solar : 95.1% Natural Gas : 4.9% |
Federalsburg Energy Storage 1 LLC | Convergent Energy and Power LP | Federaslburg, MD | PJM Interconnection, LLC (PJM) | 2.6 GWh | Oct 2021 | Dec 2023 | Solar : 50.0% Electricity used for energy storage : 50.0% |
Timonium Fairgrounds | Madison Energy Holdings LLC | Timonium, MD | PJM Interconnection, LLC (PJM) | 3.1 GWh | Sep 2020 | Dec 2023 | Solar |
MD - CS - Potomac Edison Co - GA29 TPE | Forefront Power, LLC | Friendsville, MD | PJM Interconnection, LLC (PJM) | 3.8 GWh | Dec 2020 | Dec 2023 | Solar |
Pinesburg Solar LLC | Madison Energy Holdings LLC | Williamsport, MD | PJM Interconnection, LLC (PJM) | 8.1 GWh | Apr 2020 | Dec 2023 | Solar |
Sheriff Road | Sheriff Rd Solar LLC | Hyattsville, MD | PJM Interconnection, LLC (PJM) | 1.9 GWh | Mar 2020 | Dec 2023 | Solar |
Spruce - WCMD - Resh I | MN8 Energy LLC | Hagerstown, MD | PJM Interconnection, LLC (PJM) | 2.8 GWh | Feb 2016 | Dec 2023 | Solar |
Spruce - WCMD - Creek | MN8 Energy LLC | Hagerstown, MD | PJM Interconnection, LLC (PJM) | 2.6 GWh | Apr 2015 | Dec 2023 | Solar |
Spruce - WCMD - Rubble I | MN8 Energy LLC | Williamsport, MD | PJM Interconnection, LLC (PJM) | 2.9 GWh | Aug 2015 | Dec 2023 | Solar |
Spruce - WCMD - Rubble II | MN8 Energy LLC | Williamsport, MD | PJM Interconnection, LLC (PJM) | 3.0 GWh | Oct 2015 | Dec 2023 | Solar |
Bluegrass Solar | Bluegrass Solar, LLC | Church Hill, MD | PJM Interconnection, LLC (PJM) | 157.6 GWh | Sep 2022 | Sep 2024 | Solar |
Mason Solar One LLC | Nautilus Solar Solutions | Elkton, MD | PJM Interconnection, LLC (PJM) | 2.0 GWh | Oct 2020 | Dec 2023 | Solar |
6685 Santa Barbara Ct | 6685 Santa Barbara Ct | Elkridge, MD | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2020 | Dec 2023 | Solar |
7448 Candlewood Road | Hartz Solar, LLC | Hanover, MD | PJM Interconnection, LLC (PJM) | 2.4 GWh | Mar 2020 | Dec 2023 | Solar |
Kirby Road Solar, LLC | Nautilus Solar Solutions | Clinton, MD | PJM Interconnection, LLC (PJM) | 2.6 GWh | May 2021 | Dec 2023 | Solar |
MNCPPC Randall Farm | Standard Solar | Upper Marlboro, MD | PJM Interconnection, LLC (PJM) | 2.4 GWh | Mar 2020 | Dec 2023 | Solar |
Burns Solar One LLC | Nautilus Solar Solutions | Reisterstown, MD | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2020 | Dec 2023 | Solar |
Hostetter Solar One, LLC | Nautilus Solar Solutions | Hagerstown, MD | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2020 | Dec 2023 | Solar |
P52ES 1755 Henryton Rd Phase 1 LLC CSG | Nautilus Solar Solutions | Marriottsville, MD | PJM Interconnection, LLC (PJM) | 3.1 GWh | May 2021 | Dec 2023 | Solar |
P52ES 1755 Henryton Rd Phase 2 LLC | Nautilus Solar Solutions | Marriottsville, MD | PJM Interconnection, LLC (PJM) | 3.6 GWh | May 2021 | Dec 2023 | Solar |
White Marsh Solar | Nautilus Solar Solutions | White Marsh, MD | PJM Interconnection, LLC (PJM) | 2.7 GWh | Nov 2020 | Dec 2023 | Solar |
Macy's MD Joppa Solar Project | Northstar Macy's Maryland 2015, LLC | Joppa, MD | PJM Interconnection, LLC (PJM) | 221.0 MWh | Feb 2016 | Sep 2024 | Solar |
MNCPPC Germantown Solar | Standard Solar | Boyds, MD | PJM Interconnection, LLC (PJM) | 1.7 GWh | Jan 2018 | Dec 2023 | Solar |
Bowie State Solar | Terraform Arcadia | Bowie, MD | PJM Interconnection, LLC (PJM) | 362.0 MWh | Feb 2018 | Dec 2023 | Solar |
Synergen Panorama, LLC CSG | Altus Power America Management, LLC | Fort Washington, MD | PJM Interconnection, LLC (PJM) | 8.1 GWh | Jun 2019 | Dec 2023 | Solar |
Sol Phoenix | Greenbacker Renewable Energy Corporation | Capitol Heights, MD | PJM Interconnection, LLC (PJM) | 4.0 GWh | Dec 2019 | Dec 2023 | Solar |
Blue Star | Greenbacker Renewable Energy Corporation | Massey, MD | PJM Interconnection, LLC (PJM) | 12.1 GWh | Feb 2020 | Dec 2023 | Solar |
UMCES Ground Mount | Standard Solar | Cambridge, MD | PJM Interconnection, LLC (PJM) | 3.5 GWh | Jan 2018 | Dec 2023 | Solar |
Anne Arundel County Public Schools | Standard Solar | Pasadena, MD | PJM Interconnection, LLC (PJM) | 1.7 GWh | Sep 2017 | Dec 2023 | Solar |
APG Old Bayside | Onyx Asset Services Group | Aberdeen, MD | PJM Interconnection, LLC (PJM) | 3.0 GWh | Sep 2018 | Dec 2023 | Solar |
APG New Chesapeake | Onyx Asset Services Group | Aberdeen, MD | PJM Interconnection, LLC (PJM) | 4.0 GWh | Sep 2018 | Dec 2023 | Solar |
Chester Woods Point Solar, LLC CSG | Chester Woods Point Solar, LLC | Chester, MD | PJM Interconnection, LLC (PJM) | 4.0 GWh | May 2019 | Dec 2023 | Solar |
Amazon Maryland DCA1 | Westbound Solar LLC | Sparrows Point, MD | PJM Interconnection, LLC (PJM) | 2.5 GWh | May 2019 | Dec 2023 | Solar |
Wor-Wic Community College - Offsite | Tesla Inc. | Hebron, MD | PJM Interconnection, LLC (PJM) | 3.5 GWh | Mar 2019 | Dec 2023 | Solar |
Solar Hagerstown | Greenbacker Renewable Energy Corporation | Hagerstown, MD | PJM Interconnection, LLC (PJM) | 17.2 GWh | Oct 2020 | Dec 2023 | Solar |
BTC2 Solar (CSG) | Nautilus Solar Solutions | Kingsville, MD | PJM Interconnection, LLC (PJM) | 3.8 GWh | Jun 2019 | Dec 2023 | Solar |
Upper Marlboro 1 CSG | Nautilus Solar Solutions | Upper Marlboro, MD | PJM Interconnection, LLC (PJM) | 2.8 GWh | Nov 2019 | Dec 2023 | Solar |
White CSG | Nautilus Solar Solutions | Baltimore, MD | PJM Interconnection, LLC (PJM) | 3.1 GWh | Dec 2019 | Dec 2023 | Solar |
Gibbons CSG | Nautilus Solar Solutions | Snow Hill, MD | PJM Interconnection, LLC (PJM) | 3.7 GWh | Nov 2019 | Dec 2023 | Solar |
Old Court Rd Solar | Old Court Rd Solar, LLC | Woodstock, MD | PJM Interconnection, LLC (PJM) | 3.4 GWh | Sep 2019 | Dec 2023 | Solar |
Francis Scott Key Mall | Francis Scott Key Mall | Frederick, MD | PJM Interconnection, LLC (PJM) | 1.2 GWh | Feb 2018 | Dec 2023 | Solar |
White Marsh Mall | White Marsh Mall | Baltimore, MD | PJM Interconnection, LLC (PJM) | 689.0 MWh | Nov 2015 | Dec 2023 | Solar |
Bluefin Origination 1 | Bluefin Origination 1, LLC | Brandywine, MD | PJM Interconnection, LLC (PJM) | 3.8 GWh | Oct 2019 | Dec 2023 | Solar |
Frederick County - Landfill | Tesla Inc. | Frederick, MD | PJM Interconnection, LLC (PJM) | 3.6 GWh | Jul 2019 | Dec 2023 | Solar |
KDC Solar CV Central MD Regional Transit | KDC Solar CV Central MD Regional Transit LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 568.0 MWh | Apr 2023 | Dec 2023 | Solar |
KDC Solar TC Blandair Park LLC | CleanCapital Holdings | West Friendship, MD | PJM Interconnection, LLC (PJM) | 1.1 GWh | Sep 2022 | Dec 2023 | Solar |
Friendship I | Greenbacker Renewable Energy Corporation | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.4 GWh | Mar 2023 | Dec 2023 | Solar |
Friendship II | Greenbacker Renewable Energy Corporation | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.5 GWh | Mar 2023 | Dec 2023 | Solar |
Ripley | Conductive Power | La Plata, MD | PJM Interconnection, LLC (PJM) | 53.1 GWh | Mar 2023 | Sep 2024 | Solar |
CPG - Duke 5300A Holabird | Solar DG MD Holabird Broening ACC, LLC | Baltimore, MD | PJM Interconnection, LLC (PJM) | 2.4 GWh | Nov 2022 | Dec 2023 | Solar |
CPG - Duke 5300B Holabird | Solar DG MD Holabird Broening ACC, LLC | Baltimore, MD | PJM Interconnection, LLC (PJM) | 2.4 GWh | Nov 2022 | Dec 2023 | Solar |
CPG - Duke 5900 Holabird | Solar DG MD Holabird AJCFB, LLC | Baltimore, MD | PJM Interconnection, LLC (PJM) | 2.2 GWh | Nov 2022 | Dec 2023 | Solar |
CPG - Duke 6000 Holabird | Solar DG MD Holabird AJCFB, LLC | Baltimore, MD | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2022 | Dec 2023 | Solar |
KDC Solar CV Ascend One LLC | KDC Solar CV Ascend One LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 761.0 MWh | Apr 2023 | Dec 2023 | Solar |
KDC Solar CV Cedar Lane Park LLC | KDC Solar CV Cedar Lane Park LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 647.0 MWh | Oct 2023 | Dec 2023 | Solar |
KDC Solar TC George Howard LLC | CleanCapital Holdings | West Friendship, MD | PJM Interconnection, LLC (PJM) | 1.3 GWh | Sep 2022 | Dec 2023 | Solar |
KDC Solar CV Animal Control LLC | KDC Solar CV Animal Control LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 634.0 MWh | Oct 2023 | Dec 2023 | Solar |
KDC Solar CV O'Donnell Property LLC | KDC Solar CV O'Donnell Property LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 636.0 MWh | Jun 2023 | Dec 2023 | Solar |
THD Baltimore DC - 5830 Project Tiger | Distributed Solar Development, LLC | Edgemere, MD | PJM Interconnection, LLC (PJM) | 1.3 GWh | Dec 2020 | Nov 2023 | Solar |
Holly Spring Meadows | Standard Solar | District Heights, MD | PJM Interconnection, LLC (PJM) | 656.0 MWh | Jun 2023 | Dec 2023 | Solar |
Union Bridge Solar | Citizens Enterprises Corporation | Union Bridge, MD | PJM Interconnection, LLC (PJM) | 12.3 GWh | Mar 2022 | Dec 2023 | Solar |
THD Baltimore DCs - 5829 Project Lion | Distributed Solar Development, LLC | Edgemere, MD | PJM Interconnection, LLC (PJM) | 2.6 GWh | Dec 2020 | Nov 2023 | Solar |
FFP - MD Foxhall | FFP MD Freeland Project1, LLC | Freeland, MD | PJM Interconnection, LLC (PJM) | 1.4 GWh | Jul 2023 | Dec 2023 | Solar |
Meeting House | Nautilus Solar Solutions | North East, MD | PJM Interconnection, LLC (PJM) | 1.3 GWh | Jul 2023 | Dec 2023 | Solar |
Bear One | Nautilus Solar Solutions | Hancock, MD | PJM Interconnection, LLC (PJM) | 98.0 MWh | Oct 2023 | Dec 2023 | Solar |
OER Monarch CSG | Standard Solar | Upper Marlboro, MD | PJM Interconnection, LLC (PJM) | 3.4 GWh | Nov 2021 | Dec 2023 | Solar |
Bulldog Solar One, LLC | Nautilus Solar Solutions | Bowie, MD | PJM Interconnection, LLC (PJM) | 3.4 GWh | Oct 2020 | Dec 2023 | Solar |
MD - PR97 (CSG) | Distributed Solar Development, LLC | Bowie, MD | PJM Interconnection, LLC (PJM) | 4.4 GWh | Jul 2022 | Dec 2023 | Solar |
Todd Solar | Invenergy Services LLC | Hurlock, MD | PJM Interconnection, LLC (PJM) | 43.5 GWh | Jun 2021 | Dec 2023 | Solar |
OER Checkerspot | Standard Solar | Tracy's Landing, MD | PJM Interconnection, LLC (PJM) | 3.0 GWh | Nov 2021 | Dec 2023 | Solar |
City of Bowie | Tesla Inc. | Mitchellville, MD | PJM Interconnection, LLC (PJM) | 3.8 GWh | May 2021 | Dec 2023 | Solar |
Bomber CSG | Hampstead Solar, LLC | Hampstead, MD | PJM Interconnection, LLC (PJM) | 9.0 GWh | Nov 2021 | Dec 2023 | Solar |
Hollins Ferry CSG | ICFTS MD Solar, LLC | Halethorpe, MD | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2021 | Dec 2023 | Solar |
MD - CS - Potomac Edison Co - GA25 TPE (Community Solar) | Distributed Solar Development, LLC | Accident, MD | PJM Interconnection, LLC (PJM) | 4.0 GWh | May 2022 | Dec 2023 | Solar |
MD - CS - BGE - PR24 TPE | Distributed Solar Development, LLC | Mitchellville, MD | PJM Interconnection, LLC (PJM) | 4.1 GWh | Aug 2022 | Dec 2023 | Solar |
Pittman Solar One LLC | Nautilus Solar Solutions | Hancock, MD | PJM Interconnection, LLC (PJM) | 3.4 GWh | Nov 2020 | Dec 2023 | Solar |
OER Patuxent CSG | Standard Solar | Lothian, MD | PJM Interconnection, LLC (PJM) | 4.2 GWh | Oct 2022 | Dec 2023 | Solar |
Shepherds Mill CSG | Standard Solar | Union Bridge, MD | PJM Interconnection, LLC (PJM) | 3.5 GWh | Aug 2021 | Dec 2023 | Solar |
MO32 (CSG) | TPE MD MO32 LLC | Spencerville, MD | PJM Interconnection, LLC (PJM) | 3.7 GWh | Apr 2022 | Dec 2023 | Solar |
MO33 CSG | TPE MD MO33 LLC | Gaithersburg, MD | PJM Interconnection, LLC (PJM) | 2.7 GWh | Mar 2022 | Jul 2023 | Solar |
Snowden River CSG | Snowden River Parkway, LLC | Columbia, MD | PJM Interconnection, LLC (PJM) | 2.6 GWh | May 2021 | Dec 2023 | Solar |
Rockdale | Conductive Power | Williamsport, MD | PJM Interconnection, LLC (PJM) | 1.8 GWh | Sep 2019 | Dec 2023 | Solar |
WMATA - Naylor Rd. Metro | MN8 Energy LLC | Temple Hills, MD | PJM Interconnection, LLC (PJM) | 29.0 MWh | Oct 2023 | Dec 2023 | Solar |
WMATA - S. Ave. Carport (East) (CSG) | MN8 Energy LLC | Hillcrest Heights, MD | PJM Interconnection, LLC (PJM) | 956.0 MWh | Jun 2023 | Dec 2023 | Solar |
KDC Solar TC Little Patuxent WWTP LLC | CleanCapital Holdings | West Friendship, MD | PJM Interconnection, LLC (PJM) | 981.0 MWh | Sep 2022 | Dec 2023 | Solar |
Back River Waste Water Treatment | Mayor and City Council of Baltimore City | Baltimore, MD | PJM Interconnection, LLC (PJM) | 983.0 MWh | Dec 2008 | Dec 2023 | Solar |
MEBA | Altus Power America Management, LLC | Easton, MD | PJM Interconnection, LLC (PJM) | 2.3 GWh | Oct 2014 | Dec 2023 | Solar |
Chesapeake College | Tesla Inc. | Wye Mills, MD | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 2016 | Dec 2023 | Solar |
The Clorox Company | Tesla Inc. | Aberdeen, MD | PJM Interconnection, LLC (PJM) | 2.6 GWh | Jul 2016 | Dec 2023 | Solar |
Presbyterian Senior Living Service | Terraform Arcadia | Glen Arm, MD | PJM Interconnection, LLC (PJM) | 744.6 MWh | Aug 2013 | Sep 2023 | Solar |
Cecil County CCVT HS | SunE DB42, LLC | Elkton, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2015 | Dec 2023 | Solar |
Town of Chestertown- Chestertown WWTP | Tesla Inc. | Chestertown, MD | PJM Interconnection, LLC (PJM) | 1.6 GWh | Nov 2015 | Dec 2023 | Solar |
Browse Power Plants By Maryland Counties
Figures are based on September 2024 generation numbers.County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Talbot County, MD | # 23 | 3 | 541.0 MWh |
Caroline County, MD | # 22 | 2 | 2.6 GWh |
Worcester County, MD | # 21 | 4 | 13.6 GWh |
Kent County, MD | # 20 | 6 | 18.3 GWh |
Carroll County, MD | # 19 | 4 | 24.7 GWh |
Howard County, MD | # 18 | 21 | 36.8 GWh |
Wicomico County, MD | # 17 | 7 | 43.8 GWh |
Dorchester County, MD | # 16 | 6 | 55.8 GWh |
Frederick County, MD | # 15 | 11 | 58.2 GWh |
Baltimore County, MD | # 14 | 25 | 60.5 GWh |
Washington County, MD | # 13 | 19 | 77.9 GWh |
Somerset County, MD | # 12 | 7 | 153.6 GWh |
County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Queen Anne's County, MD | # 11 | 9 | 195.8 GWh |
Baltimore city, MD | # 10 | 11 | 386.0 GWh |
Garrett County, MD | # 9 | 12 | 570.1 GWh |
Allegany County, MD | # 8 | 4 | 725.4 GWh |
Montgomery County, MD | # 7 | 18 | 799.6 GWh |
Anne Arundel County, MD | # 6 | 9 | 1.8 TWh |
Harford County, MD | # 5 | 18 | 2.3 TWh |
Cecil County, MD | # 4 | 7 | 3.5 TWh |
Charles County, MD | # 3 | 6 | 4.0 TWh |
Prince George's County, MD | # 2 | 34 | 6.5 TWh |
Calvert County, MD | # 1 | 2 | 14.8 TWh |