Summary of Electricity Activity in Penobscot County, ME
Summary of Penobscot County, ME Generation
Penobscot County, ME is ranked #450 out of 2,106 U.S. counties nationwide and #2 out of 16 Maine counties in terms of total annual net electricity generation.
Annual Generation | 2.4 TWh |
---|---|
Annual Consumption | 16.2 M MMBtu |
Last Update | Oct 2024 |
Power Plants | 43 |
Companies on File | 30 |
Map of Top Producing Plants in Penobscot County, ME
Register Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Penobscot County, ME.
Annual Net Generation From hydroelectric power
987.7 GWh
National Rank in Terms of hydroelectric Net Electricity Generation
#48 /550 U.S. Counties
State Rank in Terms of hydroelectric Net Electricity Generation
#2 /12 Maine Counties
Monthly Net Generation for Penobscot County, ME
Net Generation by Fuel Source
Net Generation by Fuel Source Breakdown
State Rank | National Rank | Generation | Fuel Consumption | |
---|---|---|---|---|
All | #2 / 16 | #450 / 2106 | 2.40 TWh | 16.15 M MMBtu |
Water | #2 / 12 | #48 / 550 | 987.75 GWh | 3.65 M MMBtu |
Natural Gas | #2 / 8 | #324 / 930 | 976.05 GWh | 7.97 M MMBtu |
Wind | #5 / 9 | #324 / 515 | 331.04 GWh | 1.25 M MMBtu |
Wood/Wood Waste Solids | #4 / 7 | #102 / 148 | 55.43 GWh | 1.39 M MMBtu |
NON-Biogenic Municipal Solid Waste | #2 / 3 | #47 / 52 | 17.03 GWh | 440.02 k MMBtu |
Black Liquor | #5 / 5 | #79 / 81 | 14.65 GWh | 908.31 k MMBtu |
Biogenic Municipal Solid Waste | #2 / 3 | #47 / 52 | 13.94 GWh | 360.01 k MMBtu |
Solar | #13 / 15 | #855 / 1104 | 5.59 GWh | 19.75 k MMBtu |
Residual Fuel Oil | #4 / 4 | #33 / 47 | 1.79 GWh | 148.69 k MMBtu |
Distillate Fuel Oil | #3 / 6 | #367 / 729 | 513.28 MWh | 11.91 k MMBtu |
Gaseous Propane | #1 / 1 | #8 / 10 | 37.97 MWh | 847 MMBtu |
Power Plants in Penobscot County, ME
Plant | Utility Name | Generation | Consumption | Fuel Types |
---|---|---|---|---|
Maine Independence Station | Casco Bay Energy Co LLC | 936.9 GWh | 7.1 M MMBtu | Natural Gas |
Great Lakes Hydro America - ME | Great Lakes Hydro America LLC | 737.2 GWh | 2.7 M MMBtu | Water |
Rollins Wind Project | Evergreen Wind, LLC | 132.2 GWh | 508.4 k MMBtu | Wind |
Passadumkeag Windpark LLC | Southern Power Co | 122.6 GWh | 454.1 k MMBtu | Wind |
West Enfield Hydro | Brookfield Black Bear Hydro, LLC | 100.4 GWh | 374.4 k MMBtu | Water |
Red Shield Envir Old Town Facility | ND Paper, Inc. | 66.3 GWh | 2.6 M MMBtu | Wood/Wood Waste Solids : 63.4% Black Liquor : 22.1% Natural Gas : 11.8% Residual Fuel Oil : 2.7% |
Milford Hydro Station | Brookfield Black Bear Hydro, LLC | 53.0 GWh | 196.3 k MMBtu | Water |
Silver Maple | WEB Silver Maple Wind LLC | 52.1 GWh | 196.9 k MMBtu | Wind |
Penobscot Energy Recovery | ESOCO Orrington LLC | 31.5 GWh | 811.8 k MMBtu | Non-biogenic Municipal Solid Waste : 54.1% Biogenic Municipal Solid Waste : 44.3% Distillate Fuel Oil : 1.6% |
Eastern Maine Medical Center | Eastern Maine Medical Center | 31.3 GWh | 474.3 k MMBtu | Natural Gas |
Medway Hydro | Brookfield Black Bear Hydro, LLC | 27.5 GWh | 104.3 k MMBtu | Water |
Orono B | Brookfield Black Bear Hydro, LLC | 25.5 GWh | 96.6 k MMBtu | Water |
Pisgah Mountain Wind | Pisgah Mountain, LLC | 24.2 GWh | 93.3 k MMBtu | Wind |
Indeck West Enfield Energy Center | Stored Solar J&WE | 13.5 GWh | 273.8 k MMBtu | Wood/Wood Waste Solids : 99.7% |
Stillwater B | Brookfield Black Bear Hydro, LLC | 12.8 GWh | 48.9 k MMBtu | Water |
Stillwater Hydro Station | Brookfield Black Bear Hydro, LLC | 12.1 GWh | 44.8 k MMBtu | Water |
Orono Hydro Station | Brookfield Black Bear Hydro, LLC | 11.6 GWh | 43.4 k MMBtu | Water |
Pumpkin Hill | KEI (Maine) Power Management (II) LLC | 5.5 GWh | 20.3 k MMBtu | Water |
Dynamic Corinth (CSG) | MN8 Energy LLC | 4.0 GWh | 14.3 k MMBtu | Solar |
Broadway Solar (CSG) | NextGrid Bitterbush, LLC | 1.3 GWh | 4.3 k MMBtu | Solar |
Corkwood Solar (CSG) | NextGrid Corkwood, LLC | 344.0 MWh | 1.2 k MMBtu | Solar |
Basin Mills | Versant Power | 0.0 Wh | 0 MMBtu | No Information Available |
Beaver Wood | Beaver Wood Joint Venture | 0.0 Wh | 0 MMBtu | No Information Available |
Boralex Sherman LLC | Boralex Sherman LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Bowers Wind Project | Evergreen Wind, LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Brewer | Nautilus Solar Solutions | 0.0 Wh | 0 MMBtu | No Information Available |
BWC Jimmie Pond | Navisun LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Dynamic - Enfield Hammett Road | MN8 Energy LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Dynamic - Exeter Solar | MN8 Energy LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Dynamic - Glenburn Broadway One | MN8 Energy LLC | 0.0 Wh | 0 MMBtu | No Information Available |
East Millinocket Mill | Katahdin KI 50 LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Great Works Hydro | Black Bear Hydro Partners LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Howland Hydro Station | Penobscot River Restoration Trust | 0.0 Wh | 0 MMBtu | No Information Available |
Lincoln ME 1 | Consolidated Edison Development Inc. | 0.0 Wh | 0 MMBtu | No Information Available |
Lincoln Paper & Tissue | Lincoln Paper and Tissue, LLC | 0.0 Wh | 0 MMBtu | No Information Available |
ME Novel Lighthouse - Penobscot | Luminace Sunbeam Development Holdings, LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Medway | Versant Power | 0.0 Wh | 0 MMBtu | No Information Available |
Millinocket Mill | HC-50 MAIN STREET, LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Our Katahdin | Greenbacker Renewable Energy Corporation | 0.0 Wh | 0 MMBtu | No Information Available |
Perma Treat Corporation | Perma Treat Corporation | 0.0 Wh | 0 MMBtu | No Information Available |
Pine Tree Landfill Gas to Energy | Pine Tree Landfill | 0.0 Wh | 0 MMBtu | No Information Available |
Veazie C | Versant Power | 0.0 Wh | 0 MMBtu | No Information Available |
Veazie Hydro Station | Black Bear Hydro Partners LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Electricity Generation for Neighboring Counties
National Rank | County | Net Generation | # Power Plants |
---|---|---|---|
#903 | Aroostook County | 545.2 GWh | 26 |
#734 | Franklin County | 842.1 GWh | 16 |
#976 | Hancock County | 455.8 GWh | 13 |
#1229 | Kennebec County | 214.5 GWh | 24 |
#1761 | Knox County | 17.4 GWh | 5 |
#1989 | Lincoln County | 2.5 GWh | 3 |
#963 | Piscataquis County | 476.5 GWh | 4 |
#521 | Somerset County | 1.8 TWh | 35 |
#1335 | Waldo County | 141.9 GWh | 6 |
#922 | Washington County | 518.9 GWh | 7 |
* Net Generation data is based on the last 12 months since Oct 2024
Electricity Generation for Cities Located in Penobscot County, ME
State Rank | City | Net Generation | # Power Plants |
---|---|---|---|
#46 | Bangor, ME | 32.5 GWh | 3 |
#41 | Bradley, ME | 52.1 GWh | 1 |
#51 | Brewer, ME | 24.2 GWh | 2 |
#70 | Dexter, ME | 4.0 GWh | 1 |
#49 | East Millinocket, ME | 27.5 GWh | 2 |
#47 | Hampden, ME | 31.5 GWh | 3 |
#23 | Howland, ME | 119.7 GWh | 6 |
#20 | Lincoln, ME | 132.2 GWh | 4 |
#16 | Milford, ME | 175.6 GWh | 2 |
#6 | Millinocket, ME | 737.2 GWh | 4 |
#62 | Newport, ME | 7.8 GWh | 1 |
#37 | Old Town, ME | 79.1 GWh | 3 |
#42 | Orono, ME | 49.2 GWh | 4 |
#5 | Veazie, ME | 936.9 GWh | 3 |
* Net Generation data is based on the last 12 months since Oct 2024