Directory of Power Plants in Indiana
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Sagamore Plant Cogeneration | Tate & Lyle Ingredients Americas Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 26.9 GWh | Sep 1984 | Aug 2024 | Natural Gas |
Caterpillar | Caterpillar Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 22.8 GWh | Nov 1983 | Aug 2024 | Natural Gas : 99.7% |
Evonik Industries AG | Evonik Degussa Corporation | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Apr 1992 | Dec 2023 | Distillate Fuel Oil |
Primient | Primary Products Ingredients Americas, LLC d/b/a Primient | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 389.3 GWh | May 2021 | Dec 2023 | Natural Gas |
Meadow Lake Wind Farm LLC | Meadow Lake Wind Farm LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 399.0 GWh | Sep 2009 | Dec 2023 | Wind |
Meadow Lake Wind Farm III LLC | Meadow Lake Wind Farm III LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 234.3 GWh | Aug 2010 | Dec 2023 | Wind |
Meadow Lake Wind Farm IV | Meadow Lake Wind Farm IV LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 172.8 GWh | Sep 2010 | Dec 2023 | Wind |
Kokomo Solar 1, LLC | NJR Clean Energy Ventures Corporation | Kokomo, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 GWh | Nov 2016 | Dec 2023 | Solar |
IMPA Knightstown Solar Park | Indiana Municipal Power Agency | Knightstown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.0 MWh | Sep 2023 | Dec 2023 | Solar |
Jordan Creek Wind Farm, LLC | Jordan Creek Wind Farm, LLC | Judyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 2020 | Aug 2024 | Wind |
Indianapolis Motor Speedway Solar PV | Blue Renewable Energy IMS, LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.2 GWh | May 2014 | Dec 2023 | Solar |
Duke Building 87 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Nov 2014 | Dec 2023 | Solar |
Harding Street | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 TWh | May 1958 | Aug 2024 | Natural Gas : 99.9% |
CC Perry K | Citizens Thermal Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.9 GWh | Dec 1924 | Jun 2024 | Natural Gas |
Georgetown | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 239.4 GWh | May 2000 | Dec 2023 | Natural Gas |
Duke Building 98 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 2014 | Dec 2023 | Solar |
Duke Building 129 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Nov 2014 | Dec 2023 | Solar |
Marion Solar LNG | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Sep 2015 | Dec 2023 | Solar |
Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Oct 2015 | Dec 2023 | Solar |
Rockville Solar II, LLC | Greenbacker Renewable Energy Corporation | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Jul 2014 | Dec 2023 | Solar |
Rockville Solar I LLC | Greenbacker Renewable Energy Corporation | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Mar 2014 | Dec 2023 | Solar |
Indy Grocers | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | May 2015 | Dec 2023 | Solar |
IND Solar Farm (Phase IIA) | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.8 GWh | Nov 2014 | Dec 2023 | Solar |
Indy Solar II, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 14.8 GWh | Nov 2013 | Aug 2024 | Solar |
Indy Solar III, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.6 GWh | Nov 2013 | Aug 2024 | Solar |
Maywood Photovoltaic Project | Hanwha Q CELLS USA | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.6 GWh | Feb 2014 | Dec 2023 | Solar |
Indy Solar I, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.0 GWh | Nov 2013 | Aug 2024 | Solar |
IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 14.9 GWh | Oct 2013 | Dec 2022 | Solar |
M. G. Emmett J. Bean Federal Center | U.S. General Services Administration | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 40.9 MWh | Mar 2011 | Jul 2023 | Solar |
Lenape II | Lenape Solar II, LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Oct 2015 | Dec 2023 | Solar |
INDY III | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Jul 2015 | Dec 2023 | Solar |
IMPA Huntingburg Solar Park | Indiana Municipal Power Agency | Huntingburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Aug 2016 | Dec 2023 | Solar |
Hobart Solar, LLC | AES Distributed Energy | Hobart, IN | Midcontinent Independent System Operator, Inc. (MISO) | 695.0 MWh | Oct 2012 | Dec 2023 | Solar |
Griffith | Altus Power America Management, LLC | Griffith, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Feb 2013 | Dec 2023 | Solar |
Hurricane Creek Lift Station | Johnson County Rural E M C | Greenwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 130.0 MWh | Aug 2004 | Dec 2023 | Distillate Fuel Oil |
Decatur Co. Solar RES (IN) | Hoosier Energy R E C, Inc | Greensburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2017 | Dec 2023 | Solar |
Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.7 GWh | Nov 2017 | Dec 2023 | Solar |
St. Joseph Solar | Indiana Michigan Power Co | Granger, IN | PJM Interconnection, LLC (PJM) | 32.4 GWh | Feb 2021 | Dec 2023 | Solar |
Green Cow Power | Green Cow Power LLC | Goshen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.8 GWh | Mar 2015 | Dec 2023 | Other Biomass Gas |
Hoosier Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Goodland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.8 GWh | Oct 2009 | Dec 2023 | Wind |
Gas City 2 | Indiana Municipal Power Agency | Gas City, IN | PJM Interconnection, LLC (PJM) | 3.4 GWh | Dec 2022 | Dec 2023 | Solar |
Gas City Solar Park | Indiana Municipal Power Agency | Gas City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | May 2020 | Dec 2023 | Solar |
Gary Works | United States Steel-Gary | Gary, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Mar 1997 | Aug 2024 | Blast Furnace Gas : 50.1% Natural Gas : 49.9% |
Auburn Renewables LLC | Auburn Renewables, LLC | Garrett, IN | PJM Interconnection, LLC (PJM) | 16.4 GWh | Aug 2022 | Dec 2023 | Solar |
IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jun 2014 | Dec 2023 | Solar |
Hardy Hills Solar Energy LLC | Hardy Hills Solar LLC | Frankfort, IN | Midcontinent Independent System Operator, Inc. (MISO) | 191.6 GWh | - | Aug 2024 | Solar |
Fowler Ridge Wind Farm LLC | AE Power Services LLC | Fowler, IN | PJM Interconnection, LLC (PJM) | 1.4 TWh | Jan 2009 | Aug 2024 | Wind |
Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 400.1 GWh | Dec 2015 | Aug 2024 | Wind |
Markland | Duke Energy Indiana, LLC | Florence, IN | Midcontinent Independent System Operator, Inc. (MISO) | 394.7 GWh | Dec 1966 | Dec 2023 | Water |
Herrema Dairy | Herrema Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.1 GWh | Mar 2022 | Dec 2023 | Natural Gas |
Bos Dairy, LLC | Bos Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Dec 2004 | Dec 2023 | Natural Gas |
Volkman Road Solar Array Hybrid | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Oct 2018 | Dec 2023 | Solar |
Oak Hill Solar Array | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Oct 2018 | Dec 2023 | Solar |
Wildcat Wind Farm I, LLC | RWE Renewables Americas, LLC | Elwood, IN | PJM Interconnection, LLC (PJM) | 649.9 GWh | Nov 2012 | Dec 2023 | Wind |
Ellettsville Solar RES | Hoosier Energy R E C, Inc | Ellettsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Sep 2016 | Dec 2023 | Solar |
Elkhart | Indiana Michigan Power Co | Elkhart, IN | PJM Interconnection, LLC (PJM) | 11.1 GWh | Dec 1912 | Dec 2023 | Water |
Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 25.5 GWh | Sep 2010 | Dec 2023 | Landfill Gas |
Edwardsport | Duke Energy Indiana, LLC | Edwardsport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 TWh | May 2013 | Aug 2024 | Coal-Derived Synthesis Gas : 54.9% Natural Gas : 36.1% Bituminous Coal : 9.0% |
Camp Atterbury Microgrid Hybrid | Duke Energy Indiana, LLC | Edinburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 629.0 MWh | Oct 2019 | Dec 2023 | Solar |
Indiana Harbor West | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 229.3 GWh | Sep 1939 | Dec 2023 | Natural Gas |
Expander Turbine | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 60.0 GWh | Apr 1981 | Aug 2024 | Blast Furnace Gas |
East Chicago | Altus Power America Management, LLC | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Feb 2013 | Nov 2023 | Solar |
Indiana Harbor E 5 AC Station | Northlake Energy | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 663.0 GWh | Apr 1996 | Dec 2023 | Blast Furnace Gas : 93.8% Natural Gas : 6.2% |
Heat Recovery Coke Facility | Cokenergy Inc | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 450.6 GWh | Mar 1998 | Aug 2024 | Waste Heat |
Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 327.5 GWh | Apr 2008 | Dec 2023 | Wind |
Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | PJM Interconnection, LLC (PJM) | 9.2 GWh | Nov 1950 | Aug 2024 | Natural Gas |
C&B Graham Energy, LLC | SolRiver Capital LLC | Danville, IN | PJM Interconnection, LLC (PJM) | 4.3 GWh | Jul 2023 | Dec 2023 | Solar |
Hendricks Regional Health | Hendricks Regional Health | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 26.0 MWh | Aug 1992 | Aug 2024 | Distillate Fuel Oil |
Twin Bridges LFGTE | Wabash Valley Power Assn, Inc | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.1 GWh | Sep 1994 | Dec 2023 | Landfill Gas |
New Haven Solar RES | Hoosier Energy R E C, Inc | Dale, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2016 | Dec 2023 | Solar |
Crawfordsville 5 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 18.1 GWh | Aug 2020 | Dec 2023 | Solar |
Crawfordsville Solar Park 4 | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | May 2020 | Dec 2023 | Solar |
Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.4 GWh | Nov 2019 | Dec 2022 | Solar |
Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.4 GWh | Nov 2019 | Dec 2023 | Solar |
IMPA Crawfordsville Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Aug 2015 | Dec 2023 | Solar |
Crane Solar Facility | Duke Energy Indiana, LLC | Crane, IN | Midcontinent Independent System Operator, Inc. (MISO) | 29.0 GWh | Dec 2016 | Dec 2023 | Solar |
Jackson Co. Solar RES | Hoosier Energy R E C, Inc | Columbus, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2017 | Dec 2023 | Solar |
Columbia City Solar Park | Indiana Municipal Power Agency | Columbia City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Mar 2021 | Dec 2023 | Solar |
Meadow Lake Wind Farm V LLC | Meadow Lake Wind Farm V LLC | Chalmers, IN | PJM Interconnection, LLC (PJM) | 335.0 GWh | Jun 2017 | Aug 2024 | Wind |
Rosewater Wind Farm | Rosewater Wind Farm LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 293.6 GWh | Nov 2020 | Aug 2024 | Wind |
Indiana Crossroads Wind Farm LLC | Indiana Crossroads Wind Farms LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 878.6 GWh | Nov 2021 | Aug 2024 | Wind |
Richmond | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 13.6 GWh | Apr 1992 | Dec 2023 | Natural Gas |
Centerville Solar Park | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 2.0 GWh | Sep 2020 | Dec 2023 | Solar |
Vermillion Energy Facility | Duke Energy Ohio Inc | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 568.9 GWh | May 2000 | Dec 2023 | Natural Gas |
Cayuga | Duke Energy Indiana, LLC | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 TWh | Sep 1970 | Aug 2024 | Bituminous Coal : 99.5% |
ArcelorMittal Burns Harbor | Cleveland-Cliffs Burns Harbor LLC | Burns Harbor, IN | Midcontinent Independent System Operator, Inc. (MISO) | 820.3 GWh | Dec 1968 | Dec 2023 | Blast Furnace Gas : 36.5% Other Gas : 35.3% Natural Gas : 28.3% |
Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.6 GWh | Oct 2022 | Dec 2023 | Solar |
Pastime Farm, LLC | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Nov 2015 | Dec 2023 | Solar |
Staunton | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Nov 2018 | Dec 2023 | Solar |
Zimmerman Energy | Landfill Energy Systems | Argos, IN | Midcontinent Independent System Operator, Inc. (MISO) | 45.7 GWh | Oct 2014 | Aug 2024 | Landfill Gas |
IMPA Anderson Solar Park | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 3.7 GWh | Dec 2016 | Dec 2023 | Solar |
IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 14.0 GWh | Nov 2017 | Dec 2023 | Solar |
Anderson 4 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 15.0 GWh | Jul 2021 | Dec 2023 | Solar |
Anderson | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 47.6 GWh | May 1992 | Dec 2023 | Natural Gas |
Anderson 3 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 16.6 GWh | Nov 2021 | Dec 2023 | Solar |
Anderson 5 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 6.0 GWh | Jul 2021 | Dec 2023 | Solar |
Anderson 6 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.4 GWh | May 2022 | Dec 2023 | Solar |
POET Biorefining- Alexandria, LLC | POET Biorefining - Alexandria, LLC. | Alexandria, IN | PJM Interconnection, LLC (PJM) | 16.5 GWh | Mar 2008 | Dec 2023 | Natural Gas |