Directory of Power Plants in Indiana
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
A B Brown | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 290.3 GWh | Feb 1979 | Aug 2024 | Bituminous Coal : 82.5% Natural Gas : 17.4% |
AES Petersburg | AES Indiana | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 TWh | May 1967 | Aug 2024 | Bituminous Coal : 99.7% |
Anderson | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 47.6 GWh | May 1992 | Dec 2023 | Natural Gas |
Anderson 3 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 16.6 GWh | Nov 2021 | Dec 2023 | Solar |
Anderson 4 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 15.0 GWh | Jul 2021 | Dec 2023 | Solar |
Anderson 5 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 6.0 GWh | Jul 2021 | Dec 2023 | Solar |
Anderson 6 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.4 GWh | May 2022 | Dec 2023 | Solar |
ArcelorMittal Burns Harbor | Cleveland-Cliffs Burns Harbor LLC | Burns Harbor, IN | Midcontinent Independent System Operator, Inc. (MISO) | 820.3 GWh | Dec 1968 | Dec 2023 | Blast Furnace Gas : 36.5% Other Gas : 35.3% Natural Gas : 28.3% |
Auburn Renewables LLC | Auburn Renewables, LLC | Garrett, IN | PJM Interconnection, LLC (PJM) | 16.4 GWh | Aug 2022 | Dec 2023 | Solar |
Bellflower Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Lewisville, IN | PJM Interconnection, LLC (PJM) | 258.9 GWh | Jan 2023 | Aug 2024 | Solar |
Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Oct 2015 | Dec 2023 | Solar |
Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 327.5 GWh | Apr 2008 | Dec 2023 | Wind |
BioTown Ag | Bio Town Biogas, LLC | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 30.2 GWh | May 2011 | Dec 2023 | Other Biomass Gas |
Bitter Ridge Wind Farm, LLC | Bitter Ridge Wind Farm, LLC | Redkey, IN | PJM Interconnection, LLC (PJM) | 351.9 GWh | Aug 2020 | Aug 2024 | Wind |
Bluff Point Wind Facility | Bluff Point Wind, LLC | Portland, IN | PJM Interconnection, LLC (PJM) | 358.7 GWh | Nov 2017 | Aug 2024 | Wind |
Bos Dairy, LLC | Bos Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Dec 2004 | Dec 2023 | Natural Gas |
Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.6 GWh | Oct 2022 | Dec 2023 | Solar |
Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | PJM Interconnection, LLC (PJM) | 9.2 GWh | Nov 1950 | Aug 2024 | Natural Gas |
C&B Graham Energy, LLC | SolRiver Capital LLC | Danville, IN | PJM Interconnection, LLC (PJM) | 4.3 GWh | Jul 2023 | Dec 2023 | Solar |
Camp Atterbury Microgrid Hybrid | Duke Energy Indiana, LLC | Edinburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 629.0 MWh | Oct 2019 | Dec 2023 | Solar |
Caterpillar | Caterpillar Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 22.8 GWh | Nov 1983 | Aug 2024 | Natural Gas : 99.7% |
Cavalry Solar Hybrid | Cavalry Energy Center LLC | Monon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 174.7 GWh | - | Aug 2024 | Solar |
Cayuga | Duke Energy Indiana, LLC | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 TWh | Sep 1970 | Aug 2024 | Bituminous Coal : 99.5% |
CC Perry K | Citizens Thermal Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.9 GWh | Dec 1924 | Jun 2024 | Natural Gas |
Centerville Solar Park | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 2.0 GWh | Sep 2020 | Dec 2023 | Solar |
Clifty Creek | Indiana-Kentucky Electric Corp | Madison, IN | PJM Interconnection, LLC (PJM) | 5.0 TWh | Jan 1955 | Aug 2024 | Bituminous Coal : 91.3% Subbituminous Coal : 8.6% |
Columbia City Solar Park | Indiana Municipal Power Agency | Columbia City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Mar 2021 | Dec 2023 | Solar |
Crane Solar Facility | Duke Energy Indiana, LLC | Crane, IN | Midcontinent Independent System Operator, Inc. (MISO) | 29.0 GWh | Dec 2016 | Dec 2023 | Solar |
Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.4 GWh | Nov 2019 | Dec 2022 | Solar |
Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.4 GWh | Nov 2019 | Dec 2023 | Solar |
Crawfordsville 5 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 18.1 GWh | Aug 2020 | Dec 2023 | Solar |
Crawfordsville Solar Park 4 | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | May 2020 | Dec 2023 | Solar |
Decatur Co. Solar RES (IN) | Hoosier Energy R E C, Inc | Greensburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2017 | Dec 2023 | Solar |
Deer Creek PV | Indiana Michigan Power Co | Marion, IN | PJM Interconnection, LLC (PJM) | 3.5 GWh | Dec 2015 | Aug 2024 | Solar |
Deercroft I & II LFGTE | Wabash Valley Power Assn, Inc | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.4 GWh | Jul 1999 | Dec 2023 | Landfill Gas |
Duke Building 129 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Nov 2014 | Dec 2023 | Solar |
Duke Building 87 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Nov 2014 | Dec 2023 | Solar |
Duke Building 98 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 2014 | Dec 2023 | Solar |
Dunn's Bridge 1 Solar | Dunns Bridge Solar Center LLC | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 505.0 GWh | May 2023 | Aug 2024 | Solar |
Eagle Valley (IN) | AES Indiana | Martinsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 TWh | Nov 1951 | Aug 2024 | Natural Gas |
Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 25.5 GWh | Sep 2010 | Dec 2023 | Landfill Gas |
East Chicago | Altus Power America Management, LLC | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Feb 2013 | Nov 2023 | Solar |
Edwardsport | Duke Energy Indiana, LLC | Edwardsport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 TWh | May 2013 | Aug 2024 | Coal-Derived Synthesis Gas : 54.9% Natural Gas : 36.1% Bituminous Coal : 9.0% |
Elkhart | Indiana Michigan Power Co | Elkhart, IN | PJM Interconnection, LLC (PJM) | 11.1 GWh | Dec 1912 | Dec 2023 | Water |
Ellettsville Solar RES | Hoosier Energy R E C, Inc | Ellettsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Sep 2016 | Dec 2023 | Solar |
Evonik Industries AG | Evonik Degussa Corporation | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Apr 1992 | Dec 2023 | Distillate Fuel Oil |
Expander Turbine | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 60.0 GWh | Apr 1981 | Aug 2024 | Blast Furnace Gas |
F B Culley | Southern Indiana Gas & Elec Co | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 TWh | Nov 1966 | Aug 2024 | Bituminous Coal : 97.5% Natural Gas : 2.5% |
Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 400.1 GWh | Dec 2015 | Aug 2024 | Wind |
Fowler Ridge Wind Farm LLC | AE Power Services LLC | Fowler, IN | PJM Interconnection, LLC (PJM) | 1.4 TWh | Jan 2009 | Aug 2024 | Wind |
Gary Works | United States Steel-Gary | Gary, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Mar 1997 | Aug 2024 | Blast Furnace Gas : 50.1% Natural Gas : 49.9% |
Gas City 2 | Indiana Municipal Power Agency | Gas City, IN | PJM Interconnection, LLC (PJM) | 3.4 GWh | Dec 2022 | Dec 2023 | Solar |
Gas City Solar Park | Indiana Municipal Power Agency | Gas City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | May 2020 | Dec 2023 | Solar |
Georgetown | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 239.4 GWh | May 2000 | Dec 2023 | Natural Gas |
Gibson | Duke Energy Indiana, LLC | Owensville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.7 TWh | Mar 1975 | Aug 2024 | Bituminous Coal : 99.7% |
Green Cow Power | Green Cow Power LLC | Goshen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.8 GWh | Mar 2015 | Dec 2023 | Other Biomass Gas |
Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.7 GWh | Nov 2017 | Dec 2023 | Solar |
Griffith | Altus Power America Management, LLC | Griffith, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Feb 2013 | Dec 2023 | Solar |
Harding Street | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 TWh | May 1958 | Aug 2024 | Natural Gas : 99.9% |
Hardy Hills Solar Energy LLC | Hardy Hills Solar LLC | Frankfort, IN | Midcontinent Independent System Operator, Inc. (MISO) | 191.6 GWh | - | Aug 2024 | Solar |
Headwaters Wind Farm II LLC | EDP Renewables North America LLC | Losanville, IN | PJM Interconnection, LLC (PJM) | 533.6 GWh | May 2021 | Aug 2024 | Wind |
Headwaters Wind Farm LLC | Headwaters Wind Farm LLC | Winchester, IN | PJM Interconnection, LLC (PJM) | 622.9 GWh | Nov 2014 | Dec 2023 | Wind |
Heat Recovery Coke Facility | Cokenergy Inc | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 450.6 GWh | Mar 1998 | Aug 2024 | Waste Heat |
Hendricks Regional Health | Hendricks Regional Health | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 26.0 MWh | Aug 1992 | Aug 2024 | Distillate Fuel Oil |
Henry County | Duke Energy Indiana, LLC | New Castle, IN | Midcontinent Independent System Operator, Inc. (MISO) | 243.9 GWh | Jun 2001 | Dec 2023 | Natural Gas |
Henryville Solar RES | Hoosier Energy R E C, Inc | Underwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2016 | Dec 2023 | Solar |
Herrema Dairy | Herrema Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.1 GWh | Mar 2022 | Dec 2023 | Natural Gas |
Hidden View Dairy, LLC | Hidden View Dairy, LLC | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Jan 2007 | Dec 2023 | Natural Gas |
Hobart Solar, LLC | AES Distributed Energy | Hobart, IN | Midcontinent Independent System Operator, Inc. (MISO) | 695.0 MWh | Oct 2012 | Dec 2023 | Solar |
Honeysuckle Solar Farm | Lightsource Renewable Energy Asset Management, LLC | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 70.1 GWh | - | Aug 2024 | Solar |
Hoosier Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Goodland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.8 GWh | Oct 2009 | Dec 2023 | Wind |
Hurricane Creek Lift Station | Johnson County Rural E M C | Greenwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 130.0 MWh | Aug 2004 | Dec 2023 | Distillate Fuel Oil |
IMPA Anderson Solar Park | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 3.7 GWh | Dec 2016 | Dec 2023 | Solar |
IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 14.0 GWh | Nov 2017 | Dec 2023 | Solar |
IMPA Crawfordsville Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Aug 2015 | Dec 2023 | Solar |
IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jun 2014 | Dec 2023 | Solar |
IMPA Huntingburg Solar Park | Indiana Municipal Power Agency | Huntingburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Aug 2016 | Dec 2023 | Solar |
IMPA Knightstown Solar Park | Indiana Municipal Power Agency | Knightstown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.0 MWh | Sep 2023 | Dec 2023 | Solar |
IMPA Middletown Solar Park | Indiana Municipal Power Agency | Middletown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 663.0 MWh | Jul 2023 | Dec 2023 | Solar |
IMPA Pendleton Solar Park | Indiana Municipal Power Agency | Pendleton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Sep 2015 | Dec 2023 | Solar |
IMPA Peru Solar Park | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Jul 2015 | Dec 2023 | Solar |
IMPA Rensselaer Solar Park | Indiana Municipal Power Agency | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Apr 2014 | Aug 2023 | Solar |
IMPA Richmond Solar Park | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 770.0 MWh | Aug 2014 | Dec 2023 | Solar |
IMPA Richmond Solar Park 7 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 986.0 MWh | Sep 2023 | Dec 2023 | Solar |
IMPA Tell City Solar Park | Indiana Municipal Power Agency | Tell City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Jun 2015 | Dec 2023 | Solar |
IMPA Washington Solar Park | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Aug 2016 | Dec 2023 | Solar |
IMPA Washington Solar Park 2 | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Jun 2023 | Dec 2023 | Solar |
IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 14.9 GWh | Oct 2013 | Dec 2022 | Solar |
IND Solar Farm (Phase IIA) | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.8 GWh | Nov 2014 | Dec 2023 | Solar |
Indiana Crossroads Solar Park | Meadow Lake Solar Park | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 365.5 GWh | May 2023 | Aug 2024 | Solar |
Indiana Crossroads Wind Farm LLC | Indiana Crossroads Wind Farms LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 878.6 GWh | Nov 2021 | Aug 2024 | Wind |
Indiana Harbor E 5 AC Station | Northlake Energy | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 663.0 GWh | Apr 1996 | Dec 2023 | Blast Furnace Gas : 93.8% Natural Gas : 6.2% |
Indiana Harbor West | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 229.3 GWh | Sep 1939 | Dec 2023 | Natural Gas |
Indianapolis Motor Speedway Solar PV | Blue Renewable Energy IMS, LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.2 GWh | May 2014 | Dec 2023 | Solar |
Indy Grocers | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | May 2015 | Dec 2023 | Solar |
INDY III | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Jul 2015 | Dec 2023 | Solar |
Indy Solar I, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.0 GWh | Nov 2013 | Aug 2024 | Solar |
Indy Solar II, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 14.8 GWh | Nov 2013 | Aug 2024 | Solar |
Indy Solar III, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.6 GWh | Nov 2013 | Aug 2024 | Solar |
Jackson Co. Solar RES | Hoosier Energy R E C, Inc | Columbus, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2017 | Dec 2023 | Solar |
Browse Power Plants By Indiana Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Adams County, IN | # 49 | 1 | 9.2 GWh |
Benton County, IN | # 15 | 5 | 3.0 TWh |
Carroll County, IN | # 42 | 1 | 20.0 GWh |
Cass County, IN | # 36 | 4 | 46.1 GWh |
Clark County, IN | # 58 | 3 | 1.7 GWh |
Clay County, IN | # 45 | 2 | 14.4 GWh |
Clinton County, IN | # 29 | 1 | 191.6 GWh |
Daviess County, IN | # 51 | 2 | 6.8 GWh |
Dearborn County, IN | # 2 | 2 | 8.9 TWh |
Decatur County, IN | # 59 | 1 | 1.7 GWh |
DeKalb County, IN | # 44 | 3 | 16.9 GWh |
Dubois County, IN | # 56 | 3 | 2.8 GWh |
Elkhart County, IN | # 35 | 5 | 50.9 GWh |
Gibson County, IN | # 1 | 2 | 9.7 TWh |
Grant County, IN | # 47 | 5 | 11.0 GWh |
Greene County, IN | # 33 | 4 | 71.2 GWh |
Hamilton County, IN | # 20 | 2 | 1.3 TWh |
Hancock County, IN | # 55 | 1 | 4.7 GWh |
Harrison County, IN | # 62 | 1 | 1.6 GWh |
Hendricks County, IN | # 48 | 3 | 10.5 GWh |
Henry County, IN | # 27 | 6 | 505.0 GWh |
Howard County, IN | # 53 | 1 | 6.3 GWh |
Jackson County, IN | # 61 | 1 | 1.6 GWh |
Jasper County, IN | # 17 | 10 | 2.2 TWh |
Jay County, IN | # 24 | 5 | 747.7 GWh |
Jefferson County, IN | # 8 | 1 | 5.0 TWh |
Johnson County, IN | # 57 | 4 | 2.6 GWh |
Knox County, IN | # 16 | 2 | 2.8 TWh |
Lake County, IN | # 3 | 17 | 6.1 TWh |
LaPorte County, IN | # 19 | 2 | 1.5 TWh |
Lawrence County, IN | # 38 | 2 | 44.7 GWh |