Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Pit 5 | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 672.9 GWh | Mar 1944 | Apr 2024 | Water |
Pit 6 | Pacific Gas & Electric Co. | Montgomery Creek, CA | California Independent System Operator (CISO) | 287.0 GWh | Jul 1965 | Oct 2023 | Water |
Pit 7 | Pacific Gas & Electric Co. | Montgomery Creek, CA | California Independent System Operator (CISO) | 342.5 GWh | Aug 1965 | Apr 2024 | Water |
Pixar - Emeryville | Bloom Energy | Emeryville, CA | California Independent System Operator (CISO) | 7.8 GWh | Dec 2013 | Dec 2023 | Natural Gas |
Plant No 1 Orange County | Orange County Sanitation Dist | Fountain Valley, CA | California Independent System Operator (CISO) | 42.7 GWh | May 1993 | Dec 2023 | Other Biomass Gas : 81.6% Natural Gas : 18.4% |
Plant No 2 Orange County | Orange County Sanitation Dist | Huntington Beach, CA | California Independent System Operator (CISO) | 63.2 GWh | May 1993 | Dec 2023 | Other Biomass Gas : 77.7% Natural Gas : 22.3% |
Pleasant Valley Hydro | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 9.3 GWh | Jan 1958 | Dec 2023 | Water |
Pleasanton - Amador Valley High School | Westbound Solar LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2022 | Solar |
Poe | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 677.2 GWh | Sep 1958 | Jun 2024 | Water |
Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 259.3 GWh | Feb 2021 | Jun 2024 | Wind |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2021 | Dec 2023 | Solar |
POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 358.2 MWh | Jun 2021 | Dec 2023 | Solar |
POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2023 | Solar |
POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 292.0 MWh | Nov 2021 | Dec 2023 | Solar |
Ponderosa Bailey Creek | Snow Mountain Hydro LLC | Manton, CA | California Independent System Operator (CISO) | 3.1 GWh | Feb 1990 | Dec 2023 | Water |
Poole | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 36.8 GWh | Apr 1924 | Dec 2023 | Water |
Port of LA Solar FiT Project | Los Angeles Department of Water & Power | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 1.9 GWh | Sep 2015 | Dec 2022 | Solar |
Portal | Southern California Edison Co | Lakeshore, CA | California Independent System Operator (CISO) | 22.6 GWh | Nov 1956 | Dec 2023 | Water |
Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 40.3 GWh | Jan 2017 | Dec 2023 | Solar |
Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 18.1 GWh | Jan 2017 | Dec 2023 | Solar |
Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 3.4 GWh | Jun 2014 | Dec 2023 | Solar |
Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2013 | Dec 2023 | Solar |
Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 64.0 GWh | Mar 2016 | Dec 2023 | Landfill Gas |
Power Generation Station (PGS) 2 | East Bay Municipal Util Dist | Oakland, CA | California Independent System Operator (CISO) | 22.2 GWh | Nov 2011 | Dec 2023 | Other Biomass Gas |
Powhatan Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2013 | Dec 2023 | Solar |
Prairie | Prairie Street Operating, LLC | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Mar 2021 | Dec 2022 | Solar |
Preferred Freezer San Leandro | EnterSolar | San Leandro, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2017 | Dec 2023 | Solar |
Prologis L.P | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2018 | Dec 2023 | Solar |
Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 68.2 GWh | - | Jun 2024 | Solar |
PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 5.4 GWh | Aug 2018 | Dec 2023 | Solar |
Puente Hills Energy Recovery | Los Angeles County Sanitation | Whittier, CA | California Independent System Operator (CISO) | 175.3 GWh | Sep 1986 | Jun 2024 | Landfill Gas |
Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 45.8 GWh | Dec 2014 | Dec 2023 | Solar |
Putah Creek Solar Farm | Solvida Energy Group/Blue Oak Energy | Winters, CA | California Independent System Operator (CISO) | 5.4 GWh | Nov 2014 | Dec 2022 | Solar |
Putah Creek Solar Farm North | Putah Creek Solar Farms LLC | Winters, CA | California Independent System Operator (CISO) | 5.2 GWh | Sep 2022 | Dec 2022 | Solar |
PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.9 GWh | May 2017 | Dec 2023 | Solar |
Q Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 27.5 GWh | Jun 2013 | Jul 2023 | Natural Gas |
Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 225.2 GWh | Oct 2015 | Dec 2023 | Solar |
R C Kirkwood | City & County of San Francisco | Groveland, CA | California Independent System Operator (CISO) | 547.7 GWh | Jan 1967 | Jun 2024 | Water |
Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 290.7 GWh | Sep 2022 | Jun 2024 | Solar |
Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 82.9 GWh | - | Jun 2024 | Solar |
Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2023 | Solar |
Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.4 GWh | Jun 2013 | Dec 2022 | Solar |
Ralston | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 14.3 GWh | Sep 1966 | Dec 2022 | Water |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 9.4 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 2.7 GWh | Mar 2017 | Dec 2023 | Solar |
Rancho Cordova Medical Offices | KP Rancho Cordova Medical Offices Solar, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Mar 2021 | Dec 2023 | Solar |
Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2015 | Dec 2023 | Solar |
Rancho Seco Solar II, LLC | Rancho Seco Solar II, LLC | Twin Cities, CA | Balancing Authority of Northern California (BANC) | 243.4 GWh | Jan 2021 | Jun 2024 | Solar |
Rancho Seco Solar, LLC | Rancho Seco Solar, LLC | Herald, CA | Balancing Authority of Northern California (BANC) | 14.0 GWh | Jul 2016 | Dec 2023 | Solar |
Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 8.3 GWh | Nov 2018 | Dec 2023 | Natural Gas |
RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 8.6 GWh | May 2016 | Dec 2023 | Solar |
RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 31.6 GWh | Nov 2014 | Dec 2023 | Solar |
RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 279.5 GWh | Nov 2016 | Jun 2024 | Solar |
RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 191.4 GWh | Nov 2016 | Jun 2024 | Solar |
RE Barren Ridge 1 | RE Barren Ridge 1, LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 176.5 GWh | Jul 2016 | Dec 2023 | Solar |
RE Bruceville 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Dec 2011 | Dec 2023 | Solar |
RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.2 GWh | Jan 2012 | Dec 2023 | Solar |
RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Jan 2012 | Dec 2023 | Solar |
RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 122.6 GWh | Nov 2014 | Dec 2023 | Solar |
RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 22.8 GWh | Dec 2013 | Dec 2023 | Solar |
RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 35.8 GWh | Nov 2014 | Dec 2023 | Solar |
RE Dillard 1 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.5 GWh | Dec 2011 | Dec 2023 | Solar |
RE Dillard 2 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.5 GWh | Dec 2011 | Dec 2023 | Solar |
RE Dillard 3 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.5 GWh | Dec 2011 | Dec 2023 | Solar |
RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 451.8 GWh | Oct 2016 | Dec 2022 | Solar |
RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 49.9 GWh | Aug 2016 | Dec 2023 | Solar |
RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 117.5 GWh | Apr 2023 | Jun 2024 | Solar |
RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 46.3 GWh | Apr 2023 | Dec 2023 | Solar |
RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 44.2 GWh | Apr 2023 | Dec 2023 | Solar |
RE Kammerer 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.7 GWh | Dec 2011 | Dec 2023 | Solar |
RE Kammerer 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.7 GWh | Jan 2012 | Dec 2023 | Solar |
RE Kammerer 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.7 GWh | Jan 2012 | Dec 2023 | Solar |
RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 40.5 GWh | Nov 2014 | Dec 2023 | Solar |
RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 53.3 GWh | May 2013 | Dec 2023 | Solar |
RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 42.7 GWh | Nov 2014 | Dec 2023 | Solar |
RE McKenzie 1 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 12.1 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 2 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 12.0 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 3 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 12.1 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 4 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 12.0 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 5 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.9 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 6 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.9 GWh | Oct 2012 | Dec 2023 | Solar |
RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 210.4 GWh | Jul 2016 | Dec 2022 | Solar |
RE Old River One, LLC | Onward Energy | Bakersfield, CA | California Independent System Operator (CISO) | 36.6 GWh | Nov 2014 | Dec 2023 | Solar |
RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 9.9 GWh | Nov 2013 | Dec 2023 | Solar |
RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 51.4 GWh | Dec 2013 | Dec 2023 | Solar |
RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 39.7 GWh | Dec 2013 | Dec 2023 | Solar |
RE Tranquillity | Southern Power Co | Cantua Creek, CA | California Independent System Operator (CISO) | 444.4 GWh | Jun 2016 | Dec 2022 | Solar |
RE-VFO LLC | RE-VFO LLC | Visalia, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2009 | Dec 2022 | Solar |
RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 41.3 GWh | Nov 2013 | Dec 2023 | Solar |
Red Bluff | California Power Holdings LLC | Red Bluff, CA | California Independent System Operator (CISO) | 13.4 GWh | Jul 2001 | Dec 2023 | Natural Gas |
Red Mountain | Metropolitan Water District of S CA | Fallbrook, CA | California Independent System Operator (CISO) | 24.5 GWh | May 1985 | Dec 2023 | Water |
Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 29.2 GWh | Sep 2015 | Dec 2023 | Solar |
Redding Power | City of Redding - (CA) | Redding, CA | Balancing Authority of Northern California (BANC) | 374.3 GWh | Dec 1988 | Jun 2024 | Natural Gas |
Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 10.0 GWh | May 2021 | Dec 2023 | Natural Gas |
Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 50.8 GWh | Nov 2017 | Dec 2022 | Solar |
Redwood Coast Airport Microgrid | Redwood Coast Energy Authority | McKinleyville, CA | California Independent System Operator (CISO) | 30.7 MWh | Nov 2021 | Dec 2023 | Solar |
Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2018 | Dec 2023 | Solar |
Regional Wastewater Control Facility | City of Stockton MUD | Stockton, CA | California Independent System Operator (CISO) | 4.6 GWh | Oct 2000 | Dec 2023 | Other Biomass Gas : 97.5% Natural Gas : 2.4% |
Regulus Solar Project | Regulus Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 151.1 GWh | Oct 2014 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |