Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.6 GWh | Jul 2014 | Dec 2023 | Natural Gas |
Pixar - Emeryville | Bloom Energy | Emeryville, CA | California Independent System Operator (CISO) | 7.1 GWh | Dec 2013 | Dec 2023 | Natural Gas |
AT&T - Redwood City | Bloom Energy | Redwood City, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2013 | Dec 2023 | Natural Gas |
Yahoo! - HQ | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2014 | Dec 2023 | Natural Gas |
Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2015 | Dec 2023 | Natural Gas |
Intel Santa Clara | Bloom Energy | Santa Clara, CA | California Independent System Operator (CISO) | 7.3 GWh | Dec 2014 | Dec 2023 | Natural Gas |
AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.2 GWh | May 2016 | Dec 2023 | Natural Gas |
AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 8.3 GWh | Aug 2016 | Dec 2023 | Natural Gas |
Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.0 GWh | Feb 2013 | Dec 2023 | Natural Gas |
Taylor Farms Salinas | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Taylor Farms - Schilling Place | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 6.5 GWh | Jun 2019 | Dec 2023 | Natural Gas |
Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 9.1 GWh | May 2021 | Dec 2023 | Natural Gas |
Anheuser Busch - Fairfield | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 21.6 GWh | Nov 2022 | Dec 2023 | Natural Gas |
Kaiser - Woodland Hills | Bloom Energy | Woodland Hills, CA | California Independent System Operator (CISO) | 17.7 GWh | Aug 2019 | Dec 2023 | Natural Gas |
Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 33.1 GWh | May 2020 | Dec 2023 | Natural Gas |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 9.9 GWh | Nov 2020 | Dec 2023 | Natural Gas |
San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 6.5 GWh | Feb 2020 | Dec 2023 | Natural Gas |
Kaiser - Harbor City | Bloom Energy | Harbor City, CA | California Independent System Operator (CISO) | 16.4 GWh | Nov 2019 | Dec 2023 | Natural Gas |
Verizon-Torrance | Bloom Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.8 GWh | Nov 2013 | Dec 2023 | Natural Gas |
Beckton Dickenson - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 5.8 GWh | Jun 2016 | Dec 2023 | Natural Gas |
Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 3.8 GWh | Aug 2013 | Dec 2023 | Natural Gas |
CalTech - Pasadena Wilson Ave | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 8.3 GWh | Nov 2019 | Dec 2023 | Natural Gas |
AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 6.5 GWh | Feb 2016 | Dec 2023 | Natural Gas |
Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2021 | Dec 2023 | Natural Gas |
Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 13.5 GWh | May 2021 | Dec 2023 | Natural Gas |
AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 7.1 GWh | Oct 2016 | Dec 2023 | Natural Gas |
AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 5.8 GWh | Sep 2016 | Dec 2023 | Natural Gas |
AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2013 | Dec 2023 | Natural Gas |
Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 25.3 GWh | Aug 2019 | Dec 2023 | Natural Gas |
Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Feb 2019 | Dec 2023 | Natural Gas |
Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2018 | Dec 2023 | Natural Gas |
Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 14.7 GWh | Jun 2018 | Dec 2023 | Natural Gas |
Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 7.6 GWh | Feb 2017 | Dec 2023 | Natural Gas |
ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 7.0 GWh | Mar 2017 | Dec 2023 | Natural Gas |
ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.2 GWh | Jun 2017 | Dec 2023 | Natural Gas |
FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Jan 2017 | Dec 2023 | Natural Gas |
APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 27.1 GWh | Apr 2017 | Dec 2023 | Natural Gas |
ATT Ventura Blvd | Bloom Energy | Sherman Oaks, CA | Los Angeles Department of Water and Power (LDWP) | 7.3 GWh | Oct 2019 | Dec 2023 | Natural Gas |
ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 6.6 GWh | Nov 2019 | Dec 2023 | Natural Gas |
Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.0 GWh | Apr 2019 | Dec 2023 | Natural Gas |
Biola University Hybrid | Biola University | La Mirada, CA | California Independent System Operator (CISO) | 11.4 GWh | Mar 1990 | Aug 2024 | Natural Gas |
Big Creek Water Works | Big Creek Water Works Ltd | Hyampom, CA | California Independent System Operator (CISO) | 10.6 GWh | Dec 1986 | Jun 2024 | Water |
BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 299.9 GWh | Jan 2022 | Aug 2024 | Solar |
Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 71.7 GWh | Oct 2017 | Dec 2023 | Natural Gas |
Berry Cogen | Berry Petroleum Co | Taft, CA | California Independent System Operator (CISO) | 15.1 GWh | Nov 1986 | Aug 2024 | Natural Gas |
Berry Cogen Tanne Hills 18 | Berry Petroleum Co | Maricopa, CA | California Independent System Operator (CISO) | 137.2 GWh | Nov 1986 | Aug 2024 | Natural Gas |
PE Berkeley | Berkeley Cogeneration Facility | Berkeley, CA | California Independent System Operator (CISO) | 161.2 GWh | May 1987 | Aug 2024 | Natural Gas |
Bear Valley Power Plant | Bear Valley Electric Service | Big Bear Lake, CA | California Independent System Operator (CISO) | 1.9 GWh | Dec 2004 | Dec 2023 | Natural Gas |
Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2022 | Dec 2023 | Solar |
Bakersfield 111 | Bakersfield 111 LLC | Bakersfield, CA | PacifiCorp West (PACW) | 2.3 GWh | Jun 2015 | Dec 2023 | Solar |
Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2014 | Dec 2023 | Water |
B Braun Medical | B Braun Medical Inc | Irvine, CA | California Independent System Operator (CISO) | 27.2 GWh | Oct 1982 | Dec 2023 | Natural Gas |
Axium Modesto Solar | Axium US Solar Holdings LLC | Modesto, CA | California Independent System Operator (CISO) | 53.7 GWh | Nov 2012 | Dec 2023 | Solar |
Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 25.5 GWh | Apr 2014 | Dec 2023 | Solar |
Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 34.3 GWh | Jul 2011 | Dec 2023 | Solar |
Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 10.6 GWh | Jul 2011 | Dec 2023 | Solar |
Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.4 GWh | Jul 2011 | Dec 2023 | Solar |
Manzana Wind LLC | Avangrid Renewables LLC | Rosamond, CA | California Independent System Operator (CISO) | 468.5 GWh | Nov 2012 | Dec 2023 | Wind |
Dillon Wind LLC | Avangrid Renewables LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 151.4 GWh | Mar 2008 | Dec 2023 | Wind |
Mountain View III | Avangrid Renewables LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 68.7 GWh | Nov 2003 | Dec 2023 | Wind |
Shiloh I Wind Project | Avangrid Renewables LLC | Rio Vista, CA | California Independent System Operator (CISO) | 418.3 GWh | Apr 2006 | Dec 2023 | Wind |
Tule Wind LLC | Avangrid Renewables LLC | Boulevard, CA | California Independent System Operator (CISO) | 342.5 GWh | Nov 2017 | Aug 2024 | Wind |
AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 576.3 GWh | Jul 2014 | Aug 2024 | Solar |
Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 263.6 GWh | Jul 2022 | Aug 2024 | Solar |
Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 596.9 GWh | Feb 2022 | Aug 2024 | Solar |
SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2023 | Solar |
Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 387.7 GWh | - | Aug 2024 | Solar |
Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 28.6 GWh | Apr 2015 | Dec 2023 | Solar |
Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 5.7 GWh | Jun 2014 | Dec 2023 | Solar |
Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 30.0 GWh | Aug 2016 | Dec 2023 | Solar |
Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 636.0 MWh | Dec 2013 | Dec 2023 | Solar |
Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 43.8 GWh | Aug 2016 | Dec 2023 | Solar |
Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 56.2 GWh | Mar 2016 | Dec 2023 | Solar |
Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 491.6 GWh | Jun 2013 | Dec 2023 | Solar |
Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 213.5 GWh | Oct 2015 | Dec 2023 | Solar |
CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 327.9 GWh | Jan 2019 | Aug 2024 | Solar |
Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.6 GWh | Mar 2016 | Dec 2023 | Solar |
Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 4.6 GWh | Jul 2014 | Dec 2023 | Solar |
Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2014 | Dec 2023 | Solar |
Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 93.1 GWh | Nov 2017 | Aug 2024 | Solar |
Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 113.0 GWh | Nov 2017 | Aug 2024 | Solar |
Watson Cogeneration | ARCO Products Co-Watson | Carson, CA | California Independent System Operator (CISO) | 2.4 TWh | Nov 1987 | Aug 2024 | Natural Gas : 83.9% Other Gas : 15.7% |
Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 406.2 GWh | Aug 2021 | Aug 2024 | Solar |
Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 25.9 GWh | May 2017 | Dec 2023 | Landfill Gas |
Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 15.6 GWh | May 2017 | Dec 2023 | Solar |
AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 27.6 GWh | Jul 2015 | Dec 2023 | Solar |
Anaheim Solar Energy Plant | Anaheim Public Utilities | Anaheim, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2014 | Dec 2023 | Solar |
Ampersand Chowchilla Biomass LLC | Ampersand Chowchilla Biomass LLC | Chowchilla, CA | California Independent System Operator (CISO) | 49.1 GWh | Apr 2008 | Mar 2023 | Wood/Wood Waste Solids : 99.8% |
Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 31.5 GWh | Feb 2013 | Dec 2023 | Landfill Gas |
Ameresco Santa Cruz Energy | AMERESCO Santa Cruz Energy LLC | Watsonville, CA | California Independent System Operator (CISO) | 18.8 GWh | Dec 2005 | Dec 2023 | Landfill Gas |
Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.9 GWh | Mar 2014 | Dec 2023 | Landfill Gas |
Foothill Sanitary Landfill - Solar Array | Ameresco San Joaquin Solar LLC | Linden, CA | PacifiCorp West (PACW) | 8.2 GWh | Dec 2020 | Dec 2022 | Solar |
Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 84.0 GWh | Nov 2008 | Aug 2024 | Landfill Gas |
Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 28.7 GWh | Jun 2009 | Dec 2023 | Landfill Gas |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 9.3 GWh | Apr 2013 | Dec 2023 | Landfill Gas |
Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 32.1 GWh | Jan 2014 | Dec 2023 | Landfill Gas |
Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 32.6 GWh | Oct 2010 | Dec 2023 | Landfill Gas |
Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.0 GWh | Jan 2013 | Dec 2023 | Landfill Gas |
Nickel 1 Solar Facility | Altus Power America Management, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 2.8 GWh | Oct 2012 | Dec 2023 | Solar |
Aerojet I | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 5.9 GWh | Nov 2009 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Madera County, CA | # 29 | 26 | 1.3 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.8 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
Kern County, CA | # 1 | 293 | 32.9 TWh |