Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Dulles | Golden Springs Development Company LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 2.4 GWh | Aug 2016 | Dec 2023 | Solar |
Freeway Springs | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.7 GWh | Sep 2016 | Dec 2023 | Solar |
Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2012 | Dec 2023 | Solar |
Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2012 | Dec 2023 | Solar |
Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 269.0 GWh | Nov 2015 | Dec 2022 | Wind |
Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 147.7 GWh | Oct 2017 | Jun 2024 | Wind |
Golden Field Solar III, LLC | Golden Field Solar III, LLC | Rosamond, CA | California Independent System Operator (CISO) | 575.7 GWh | Nov 2020 | Jun 2024 | Solar |
Goal Line LP | Goal Line LP | Escondido, CA | California Independent System Operator (CISO) | 14.5 GWh | Jul 1994 | Mar 2024 | Natural Gas |
Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 50.3 GWh | Jul 2012 | Dec 2022 | Natural Gas |
Wolfskill Energy Center | Gilroy Energy Center LLC | Fairfield, CA | California Independent System Operator (CISO) | 8.6 GWh | Dec 2002 | Dec 2023 | Natural Gas |
Lambie Energy Center | Gilroy Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 15.1 GWh | Dec 2002 | Dec 2023 | Natural Gas |
Riverview Energy Center | Gilroy Energy Center for Riverview | Antioch, CA | California Independent System Operator (CISO) | 29.3 GWh | Apr 2003 | Dec 2023 | Natural Gas |
Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2022 | Solar |
Gilead Foster City Solar Project | Gilead Sciences Inc. Foster City | Foster City, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2021 | Dec 2022 | Solar |
Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2021 | Dec 2022 | Solar |
Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 23.1 GWh | May 2017 | Dec 2023 | Solar |
Sonoma California Geothermal | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 291.4 GWh | Nov 1983 | Dec 2022 | Geothermal |
Aidlin Geothermal Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 84.7 GWh | Apr 1989 | Dec 2023 | Geothermal |
Calistoga Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 507.7 GWh | Feb 1984 | Jun 2024 | Geothermal |
Geysers Unit 5-20 | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 4.8 TWh | Mar 1971 | Jun 2024 | Geothermal |
Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 689.7 GWh | Oct 2013 | Jun 2024 | Solar |
San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 38.5 GWh | Sep 2018 | Dec 2023 | Solar |
Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 6.2 GWh | Nov 2014 | Dec 2023 | Solar |
G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2013 | Dec 2023 | Landfill Gas |
G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 27.4 GWh | Jan 2009 | Dec 2023 | Landfill Gas |
FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2010 | Dec 2023 | Solar |
Frontier Solar LLC | Frontier Solar, LLC | Newman, CA | California Independent System Operator (CISO) | 42.1 GWh | May 2016 | Dec 2023 | Solar |
Friant Hydro Facility | Friant Power Authority | Friant, CA | California Independent System Operator (CISO) | 111.7 GWh | Mar 1985 | Dec 2023 | Water |
High Winds LLC | FPLE High Winds, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 322.2 GWh | Jun 2003 | Dec 2022 | Wind |
San Gorgonio Windplant WPP1993 | FPL Energy Operating Services, Inc. | North Palm Springs, CA | California Independent System Operator (CISO) | 170.5 GWh | Nov 2011 | Dec 2022 | Wind |
FPL Energy Montezuma Winds LLC | FPL Energy Montezuma Wind | Birds Landing, CA | California Independent System Operator (CISO) | 99.3 GWh | Oct 2010 | Dec 2022 | Wind |
Green Power I | FPL Energy Green Power | North Palm Springs, CA | California Independent System Operator (CISO) | 605.4 MWh | Jun 1975 | Dec 2022 | Wind |
Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.0 GWh | Oct 2011 | Dec 2023 | Wind |
Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.7 GWh | Sep 2010 | Dec 2023 | Wind |
Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 427.8 MWh | Nov 2011 | Dec 2023 | Wind |
Foundation ST | Foundation HA Energy Generation, LLC | Tracy, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2011 | Dec 2023 | Wind |
Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2014 | Jun 2024 | Wind |
Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 4.8 GWh | Jun 2014 | Jun 2024 | Wind |
City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2014 | Dec 2023 | Wind |
Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 4.2 GWh | Oct 2014 | Dec 2023 | Wind |
Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 19.0 GWh | Jul 2022 | Dec 2023 | Wind |
Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2017 | Dec 2023 | Wind |
Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 4.2 GWh | Aug 2017 | Dec 2023 | Wind |
Foundation Wal-Mart Red Bluff | Foundation CA Fund VI Manager LLC | Red Bluff, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2012 | Jun 2024 | Wind |
Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 911.0 MWh | Nov 2012 | Jun 2024 | Wind |
Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2012 | Dec 2023 | Wind |
Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2012 | Dec 2023 | Wind |
Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 24.2 GWh | Nov 2012 | Dec 2023 | Wind |
Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2012 | Dec 2023 | Wind |
Foundation Cemex Madison | Foundation CA Fund V Manager, LLC | Madison, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2012 | Dec 2023 | Wind |
Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.7 GWh | Jul 2018 | Dec 2023 | Wind |
Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 6.2 GWh | Mar 2019 | Dec 2023 | Wind |
Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2018 | Dec 2023 | Wind |
Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2018 | Dec 2023 | Solar |
CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2022 | Dec 2023 | Solar |
UC Santa Cruz Solar | Forefront Power, LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2022 | Solar |
Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2023 | Solar |
SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 4.0 GWh | Sep 2018 | Dec 2023 | Solar |
SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2018 | Dec 2023 | Solar |
Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2020 | Dec 2023 | Solar |
CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2020 | Dec 2023 | Solar |
DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2020 | Dec 2023 | Solar |
Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2020 | Dec 2023 | Solar : 99.3% Electricity used for energy storage : 0.7% |
DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 2021 | Dec 2023 | Solar |
Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2020 | Dec 2023 | Solar |
CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.7 GWh | Apr 2023 | Dec 2023 | Solar |
CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2022 | Dec 2023 | Solar |
CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 462.0 MWh | Aug 2023 | Dec 2023 | Solar |
Five Points Solar Park | Five Points Solar Park, LLC | Five Points, CA | California Independent System Operator (CISO) | 107.7 GWh | Aug 2016 | Dec 2023 | Solar |
Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 562.6 MWh | Nov 2011 | Dec 2023 | Solar |
FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2013 | Dec 2023 | Solar |
Exeter Bulk Plant Array | Exeter Bulk Plant | Exeter, CA | California Independent System Operator (CISO) | 1.6 GWh | Dec 2014 | Dec 2023 | Solar |
Medline Ind. Phase 2 Tracy | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.1 GWh | Mar 2018 | Dec 2023 | Solar |
Preferred Freezer San Leandro | EnterSolar | San Leandro, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2017 | Dec 2023 | Solar |
Prologis L.P | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2018 | Dec 2023 | Solar |
Niagara Bottling Stockton | EnterSolar | Stockton, CA | California Independent System Operator (CISO) | 1.8 GWh | Dec 2017 | Dec 2023 | Solar |
FAA NorCal TRACON | Enfinity NorCal 1 FAA LLC | Mather AFB, CA | Balancing Authority of Northern California (BANC) | 1.3 GWh | Nov 2012 | Dec 2023 | Solar |
Enerparc CA1 LLC | Enerparc CA 1, LLC | Hollister, CA | California Independent System Operator (CISO) | 2.6 GWh | May 2014 | Dec 2023 | Solar |
Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 31.7 GWh | Oct 2004 | Dec 2023 | Landfill Gas |
Encina Water Pollution Control | Encina Joint Powers Authority | Carlsbad, CA | California Independent System Operator (CISO) | 15.5 GWh | Oct 2008 | Jun 2024 | Other Biomass Gas : 96.4% Natural Gas : 3.6% |
Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 4.2 GWh | Jul 1974 | Dec 2023 | Natural Gas |
Elk Hills Power LLC | Elk Hills Power LLC | Tupman, CA | California Independent System Operator (CISO) | 2.9 TWh | Jun 2003 | Jun 2024 | Natural Gas |
El Segundo Energy Center LLC | El Segundo Energy Center, LLC | El Segundo, CA | California Independent System Operator (CISO) | 164.4 GWh | Jun 2013 | Jun 2024 | Natural Gas |
El Dorado | El Dorado Irrigation District | Pollock Pines, CA | California Independent System Operator (CISO) | 103.9 GWh | Dec 1923 | Dec 2023 | Water |
Haypress | EIF Haypress LLC | Sierra City, CA | California Independent System Operator (CISO) | 23.3 GWh | Nov 1988 | Aug 2023 | Water |
E F Oxnard Energy Facility | EF Oxnard, LLC | Oxnard, CA | California Independent System Operator (CISO) | 8.2 GWh | May 1990 | Jun 2024 | Natural Gas |
Kettleman Solar -Centaurus | EE Kettleman California LLC | Kettleman City, CA | California Independent System Operator (CISO) | 39.9 GWh | Jun 2015 | Dec 2023 | Solar |
Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 46.4 GWh | Nov 2019 | Dec 2023 | Solar |
Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 27.7 GWh | - | Jun 2024 | Solar |
Edom Hills Project 1 LLC | Edom Hills Project 1 LLC | Cathedral City, CA | California Independent System Operator (CISO) | 11.2 GWh | Aug 2008 | Dec 2023 | Wind |
EDF Renewable Windfarm V Inc | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 22.1 GWh | Dec 1989 | Dec 2023 | Wind |
Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 425.5 GWh | Dec 2008 | Dec 2022 | Wind |
Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 699.6 GWh | Jul 2012 | Dec 2022 | Wind |
Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 303.3 GWh | Nov 2012 | Dec 2022 | Wind |
Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 273.8 GWh | Nov 2012 | Dec 2023 | Solar |
Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 291.8 GWh | Nov 2011 | Dec 2022 | Wind |
Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 309.8 GWh | Oct 2019 | Jun 2024 | Solar |
Bear Creek Solar | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 4.0 GWh | Jan 2014 | Dec 2023 | Solar |
Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.1 GWh | Mar 2014 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2022 generation numbers.County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |