Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
USG 1 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 2.7 GWh | Mar 2014 | Dec 2023 | Solar |
Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2019 | Dec 2023 | Solar |
USG 2 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 1.6 GWh | Nov 2015 | Dec 2023 | Solar |
Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2018 | Dec 2023 | Solar |
Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 917.0 MWh | Mar 2016 | Dec 2023 | Solar |
Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2017 | Dec 2023 | Solar |
Zero Waste Energy Development Co LLC | Zero Waste Energy Development Company LLC | San Jose, CA | California Independent System Operator (CISO) | 2.3 GWh | Jan 2015 | Dec 2023 | Other Biomass Gas |
Siphon Drop Power Plant | Yuma County Water User's Association | Winterhaven, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 12.8 GWh | Aug 1987 | Dec 2023 | Water |
Narrows PH | Yuba County Water Agency | Grass Valley, CA | California Independent System Operator (CISO) | 73.5 GWh | Nov 1942 | Dec 2023 | Water |
Narrows 2 | Yuba County Water Agency | Browns Valley, CA | California Independent System Operator (CISO) | 276.7 GWh | Nov 1969 | Dec 2023 | Water |
Colgate | Yuba County Water Agency | Dobbins, CA | California Independent System Operator (CISO) | 1.3 TWh | Sep 1969 | Aug 2024 | Water |
Yolo County Solar Project | Yolo County of | Woodland, CA | California Independent System Operator (CISO) | 534.0 MWh | Nov 2010 | Dec 2023 | Solar |
Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.9 GWh | Jun 2013 | Dec 2023 | Solar |
Grassland 3&4 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Nov 2023 | Solar |
Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 5.9 GWh | Sep 1983 | Sep 2023 | Water |
MM Yolo Power | Yolo County Community Services Department | Woodland, CA | California Independent System Operator (CISO) | 17.9 GWh | Sep 1990 | Dec 2023 | Landfill Gas |
SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 201.0 MWh | Aug 2011 | Aug 2024 | Distillate Fuel Oil |
Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 370.5 GWh | Nov 2019 | Aug 2024 | Solar |
Wonderful Kings | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2022 | Dec 2023 | Solar |
Wonderful Nursery | Wonderful Renewable Energy, LLC. | Wasco, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2021 | Dec 2023 | Solar |
POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2023 | Solar |
Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 48.3 GWh | Aug 2021 | Dec 2023 | Solar |
Wonderful Huller & Shellling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 3.8 GWh | Jul 2021 | Dec 2023 | Solar |
POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 352.0 MWh | Jun 2021 | Dec 2023 | Solar |
POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 292.0 MWh | Nov 2021 | Dec 2023 | Solar |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2021 | Dec 2023 | Solar |
Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2020 | Dec 2023 | Solar |
Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.1 GWh | Jul 2022 | Dec 2023 | Solar |
Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.8 GWh | Jul 2021 | Dec 2023 | Solar |
Wonderful Orchards - New Columbia | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 9.4 GWh | Aug 2020 | Dec 2023 | Solar |
Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 5.9 GWh | Apr 2017 | Dec 2023 | Landfill Gas |
Altamont Gas Recovery | WM Renewable Energy LLC | Livermore, CA | California Independent System Operator (CISO) | 39.4 GWh | Feb 1969 | Dec 2023 | Landfill Gas |
Wister Solar | Wister Solar | Niland, CA | Imperial Irrigation District (IID) | 29.7 GWh | Jun 2022 | Dec 2023 | Solar |
85 B | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 86.9 GWh | Dec 1984 | Dec 2023 | Wind |
85 A | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 62.9 GWh | Dec 1984 | Dec 2023 | Wind |
ZCO | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 1.1 GWh | Nov 1985 | Dec 2023 | Wind |
Helzel & Schwarzhoff 86 | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 1986 | Dec 2023 | Wind |
Victory Garden (Tehachapi) | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 25.3 GWh | Nov 1981 | Dec 2023 | Wind |
Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 238.0 GWh | Dec 2018 | Aug 2024 | Solar |
Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 49.7 GWh | Feb 2017 | Dec 2023 | Solar |
Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 5.6 GWh | Jan 2016 | Dec 2023 | Solar |
NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 47.7 GWh | Feb 2017 | Dec 2023 | Solar |
Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2016 | Dec 2023 | Solar |
Westlands Solar PV Farm | Westlands Solar Farms, LLC | Huron, CA | California Independent System Operator (CISO) | 37.8 GWh | Jan 2014 | Dec 2023 | Solar |
Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 502.3 GWh | Nov 2023 | Aug 2024 | Solar : 94.4% Electricity used for energy storage : 5.6% |
Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 9.6 GWh | Aug 2023 | Dec 2023 | Solar |
Western Power & Steam Inc | Western Power and Steam II LLC | Bakersfield, CA | California Independent System Operator (CISO) | 37.6 GWh | Feb 1990 | Jul 2024 | Natural Gas |
Pleasanton - Amador Valley High School | Westbound Solar LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.5 GWh | Oct 2019 | Dec 2022 | Solar |
Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2020 | Aug 2024 | Natural Gas |
Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 3.8 GWh | Sep 2015 | Dec 2023 | Solar |
Fresno Cogen Partners | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 2.8 GWh | Dec 1989 | Dec 2023 | Natural Gas |
Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 23.3 GWh | Dec 2013 | Dec 2023 | Natural Gas |
El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 7.6 GWh | May 2010 | Dec 2023 | Natural Gas |
Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 2.9 GWh | Dec 2012 | Nov 2023 | Natural Gas |
Panoche Peaker | Wellhead Services, Inc | Firebaugh, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 1973 | Dec 2023 | Natural Gas |
Yuba City Cogen Partners | Wellhead Services, Inc | Yuba City, CA | California Independent System Operator (CISO) | 19.0 GWh | Nov 1990 | Dec 2023 | Natural Gas |
Chula Vista Energy Center | Wellhead Services, Inc | Chula Vista, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2001 | Dec 2023 | Natural Gas |
Double C Generation Limited Partnership | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 22.9 GWh | Feb 1989 | Dec 2023 | Natural Gas |
Kern Front Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 22.0 GWh | Jan 1989 | Dec 2023 | Natural Gas |
High Sierra Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 23.3 GWh | Feb 1989 | Dec 2023 | Natural Gas |
Bear Mountain Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 40.4 GWh | Mar 1995 | Aug 2024 | Natural Gas |
Live Oak Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 21.3 GWh | Feb 1992 | Aug 2024 | Natural Gas |
McKittrick Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 14.4 GWh | Sep 1991 | Aug 2024 | Natural Gas |
Badger Creek Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 17.9 GWh | Mar 1991 | Aug 2024 | Natural Gas |
Chalk Cliff Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 19.3 GWh | Feb 1990 | Aug 2024 | Natural Gas |
Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2001 | Aug 2024 | Natural Gas |
Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 336.7 GWh | Mar 2013 | Aug 2024 | Natural Gas |
Wadham Energy LP | Wadham Energy Ltd Partners | Williams, CA | California Independent System Operator (CISO) | 74.4 GWh | Feb 1989 | Dec 2023 | Agricultural By-Products : 99.5% Natural Gas : 0.5% |
Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2021 | Dec 2023 | Solar |
Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.4 GWh | Jan 2020 | Dec 2023 | Solar |
Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 296.2 GWh | - | Aug 2024 | Solar |
Victor Valley CC CPV Solar | Victor Valley Community College District | Victorville, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2010 | Dec 2022 | Solar |
Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2021 | Dec 2023 | Solar |
Venable Solar 1 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2023 | Solar |
Venable Solar 2 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2023 | Solar |
Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 47.7 GWh | Feb 2015 | Dec 2023 | Solar |
Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 216.0 GWh | Nov 2011 | Dec 2023 | Wind |
9150 Hermosa Solar GM | Valta Energy | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2022 | Dec 2023 | Solar |
20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 2.4 GWh | Jun 2022 | Dec 2023 | Solar |
CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 1.0 GWh | Nov 2018 | Dec 2023 | Solar |
Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 236.7 GWh | Oct 2017 | Dec 2023 | Natural Gas |
Valero Refinery Cogeneration Unit 1 | Valero Refining Co California | Benicia, CA | California Independent System Operator (CISO) | 155.2 GWh | Sep 2002 | Aug 2024 | Natural Gas : 76.7% Other Gas : 23.3% |
VA Sepulveda Ambulatory Care Center | VA Sepulveda Ambulatory Care Center | North Hills, CA | Los Angeles Department of Water and Power (LDWP) | 4.7 GWh | Sep 2014 | Dec 2023 | Solar |
Murphys | Utica Water & Power Authority | Murphys, CA | California Independent System Operator (CISO) | 17.8 GWh | Feb 1954 | Dec 2023 | Water |
Angels | Utica Water & Power Authority | Angels Camp, CA | California Independent System Operator (CISO) | 7.2 GWh | Dec 1939 | Dec 2023 | Water |
Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 4.7 GWh | Jan 2007 | Dec 2023 | Natural Gas |
Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 69.3 GWh | Dec 1995 | Aug 2024 | Natural Gas |
UCLA So Campus Cogen Project | University of California-LA | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 214.4 GWh | Sep 1993 | Aug 2024 | Natural Gas |
University of California Santa Cruz | University of California Santa Cruz | Santa Cruz, CA | California Independent System Operator (CISO) | 35.9 GWh | Aug 2013 | Dec 2023 | Natural Gas : 90.8% Solar : 9.2% |
University of California San Diego Hybrid | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 223.7 GWh | Jun 2001 | Aug 2024 | Natural Gas |
Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2008 | Dec 2023 | Solar |
UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 111.7 GWh | Jun 2007 | Aug 2024 | Natural Gas |
Keswick | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 373.0 GWh | Sep 1949 | Aug 2024 | Water |
Nimbus | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 69.9 GWh | Apr 1955 | Dec 2023 | Water |
Judge F Carr | U S Bureau of Reclamation | French Gulch, CA | Balancing Authority of Northern California (BANC) | 214.6 GWh | Apr 1963 | Aug 2024 | Water |
Folsom | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 648.5 GWh | Apr 1955 | Aug 2024 | Water |
Shasta | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 2.4 TWh | May 1944 | Aug 2024 | Water |
Parker Dam | U S Bureau of Reclamation | Parker, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 379.9 GWh | Nov 1942 | Aug 2024 | Water |
Spring Creek | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 306.9 GWh | Dec 1963 | Aug 2024 | Water |
Trinity | U S Bureau of Reclamation | Weaverville, CA | Balancing Authority of Northern California (BANC) | 356.3 GWh | Jan 1964 | Aug 2024 | Water |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Madera County, CA | # 29 | 26 | 1.3 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.8 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
Kern County, CA | # 1 | 293 | 32.9 TWh |