Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2023 | Solar |
Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 23.3 GWh | Dec 2013 | Dec 2023 | Natural Gas |
Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2013 | Dec 2023 | Solar |
Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 5.3 GWh | Dec 2013 | Dec 2023 | Solar |
Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2013 | Dec 2023 | Solar |
Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 336.5 GWh | Dec 2013 | Dec 2023 | Wind |
Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 247.6 GWh | Dec 2013 | Dec 2023 | Wind |
Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.6 GWh | Dec 2013 | Dec 2023 | Solar |
RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.1 GWh | Dec 2013 | Dec 2023 | Solar |
RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 38.0 GWh | Dec 2013 | Dec 2023 | Solar |
RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 21.9 GWh | Dec 2013 | Dec 2023 | Solar |
Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 53.0 GWh | Dec 2013 | Dec 2023 | Solar |
Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 636.0 MWh | Dec 2013 | Dec 2023 | Solar |
Pixar - Emeryville | Bloom Energy | Emeryville, CA | California Independent System Operator (CISO) | 7.1 GWh | Dec 2013 | Dec 2023 | Natural Gas |
Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 2.0 GWh | Dec 2013 | Dec 2023 | Solar |
Verizon-Torrance | Bloom Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.8 GWh | Nov 2013 | Dec 2023 | Natural Gas |
E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2023 | Solar |
CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2023 | Solar |
CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 2013 | Dec 2023 | Solar |
CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2023 | Solar |
Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 268.3 GWh | Nov 2013 | Aug 2024 | Solar : 96.4% Natural Gas : 3.6% |
Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 230.3 GWh | Nov 2013 | Aug 2024 | Solar : 95.2% Natural Gas : 4.8% |
Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 270.0 GWh | Nov 2013 | Aug 2024 | Solar : 96.9% Natural Gas : 3.1% |
RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 39.5 GWh | Nov 2013 | Dec 2023 | Solar |
Newberry Solar 1 LLC | Newberry Solar 1 LLC | Newberry Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2013 | Dec 2023 | Solar |
Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2013 | Dec 2023 | Solar |
RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 9.5 GWh | Nov 2013 | Dec 2023 | Solar |
Desert Hot Springs Solar | Consolidated Edison Solutions Inc. | Desert Hot Springs, CA | California Independent System Operator (CISO) | 5.9 GWh | Nov 2013 | Dec 2023 | Solar |
Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2013 | Dec 2023 | Solar |
Oltmans SCE at Champagne | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2013 | Dec 2023 | Solar |
Oltmans SCE at Jurupa | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.7 GWh | Nov 2013 | Dec 2023 | Solar |
Industry Solar Power Generation Station 1 LLC | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2023 | Solar |
Navajo Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2023 | Solar |
Powhatan Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2013 | Dec 2023 | Solar |
Otoe Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2023 | Solar |
ABEC Bidart-Old River LLC | ABEC Bidart-Old River LLC | Bakersfield, CA | California Independent System Operator (CISO) | 16.0 GWh | Nov 2013 | Dec 2023 | Other Biomass Gas |
Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2013 | Dec 2023 | Solar |
Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2013 | Dec 2023 | Solar |
Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 346.4 GWh | Oct 2013 | Dec 2023 | Solar |
Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 609.1 GWh | Oct 2013 | Aug 2024 | Solar |
Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 277.2 GWh | Oct 2013 | Dec 2023 | Solar |
Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 659.4 GWh | Oct 2013 | Dec 2023 | Solar |
Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 543.5 GWh | Oct 2013 | Dec 2023 | Solar |
North City - Landfill Gas Engine North | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 4.2 GWh | Oct 2013 | Dec 2022 | Landfill Gas |
Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.2 GWh | Sep 2013 | Dec 2023 | Solar |
Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Sep 2013 | Dec 2023 | Solar |
Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 328.6 GWh | Sep 2013 | Dec 2023 | Solar |
Sol Orchard El Centro PV | Sol Orchard Imperial 1, LLC | El Centro, CA | Imperial Irrigation District (IID) | 46.2 GWh | Sep 2013 | Dec 2023 | Solar |
University of California Santa Cruz | University of California Santa Cruz | Santa Cruz, CA | California Independent System Operator (CISO) | 35.9 GWh | Aug 2013 | Dec 2023 | Natural Gas : 90.8% Solar : 9.2% |
Cal State Univ San Bernardino FC01 | Southern California Edison Co | San Bernardino, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2013 | Dec 2022 | Natural Gas |
Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.2 GWh | Aug 2013 | Dec 2023 | Solar |
CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2023 | Solar |
Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 3.8 GWh | Aug 2013 | Dec 2023 | Natural Gas |
CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2023 | Solar |
Russell City Energy Center | Russell City Energy Company LLC | Hayward, CA | California Independent System Operator (CISO) | 1.6 TWh | Jul 2013 | Aug 2024 | Natural Gas |
Guernsey Solar Station | Pacific Gas & Electric Co. | Hanford, CA | California Independent System Operator (CISO) | 24.2 GWh | Jul 2013 | Dec 2023 | Solar |
Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.7 GWh | Jul 2013 | Dec 2023 | Solar |
Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2013 | Dec 2023 | Solar |
Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2023 | Solar |
Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2013 | Dec 2023 | Solar |
North Bay Solar 1 | AES Distributed Energy | Fairfield, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2013 | Dec 2023 | Solar |
El Segundo Energy Center LLC | El Segundo Energy Center, LLC | El Segundo, CA | California Independent System Operator (CISO) | 142.7 GWh | Jun 2013 | Aug 2024 | Natural Gas |
Grassland 3&4 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Nov 2023 | Solar |
Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.9 GWh | Jun 2013 | Dec 2023 | Solar |
CBS Television City | Televison City Studios, LLC. | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 7.7 GWh | Jun 2013 | Dec 2023 | Natural Gas : 85.2% Solar : 14.8% |
Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2023 | Solar |
Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2013 | Mar 2023 | Solar |
White River Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 45.3 GWh | Jun 2013 | Dec 2023 | Solar |
Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.0 GWh | Jun 2013 | Dec 2023 | Landfill Gas |
Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 491.6 GWh | Jun 2013 | Dec 2023 | Solar |
Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 2.1 GWh | Jun 2013 | Dec 2023 | Solar |
Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2013 | Dec 2023 | Solar |
Q Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 27.0 MWh | Jun 2013 | Aug 2024 | Natural Gas |
FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2013 | Dec 2023 | Solar |
AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2013 | Dec 2023 | Natural Gas |
Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 37.5 GWh | May 2013 | Dec 2023 | Solar |
RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 51.1 GWh | May 2013 | Dec 2023 | Solar |
SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 24.4 GWh | May 2013 | Dec 2023 | Solar |
SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.8 GWh | May 2013 | Dec 2023 | Solar |
G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 10.8 GWh | May 2013 | Dec 2023 | Landfill Gas |
Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.4 GWh | May 2013 | Dec 2023 | Solar |
CBS Studio Center | Crestmark Bank | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 6.5 GWh | May 2013 | Aug 2023 | Natural Gas |
Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 141.3 GWh | Apr 2013 | Aug 2024 | Natural Gas |
Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 509.8 GWh | Apr 2013 | Aug 2024 | Natural Gas |
West Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 20.2 GWh | Apr 2013 | Dec 2023 | Solar |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 9.3 GWh | Apr 2013 | Dec 2023 | Landfill Gas |
Strata Roof 1 | Strata Manager, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.6 GWh | Apr 2013 | Dec 2023 | Solar |
Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 336.7 GWh | Mar 2013 | Aug 2024 | Natural Gas |
Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 1.1 TWh | Mar 2013 | Aug 2024 | Solar |
Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2013 | Dec 2023 | Solar |
Pine Tree Solar Project | Los Angeles Department of Water & Power | Owenyo, CA | Los Angeles Department of Water and Power (LDWP) | 6.9 GWh | Feb 2013 | Dec 2023 | Solar |
TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Feb 2013 | Dec 2023 | Solar |
Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.4 GWh | Feb 2013 | Dec 2023 | Solar |
Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2023 | Solar |
Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 31.5 GWh | Feb 2013 | Dec 2023 | Landfill Gas |
Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 14.2 GWh | Feb 2013 | Dec 2023 | Other Biomass Gas : 85.5% Natural Gas : 14.5% |
Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.0 GWh | Feb 2013 | Dec 2023 | Natural Gas |
AT&T - Redwood City | Bloom Energy | Redwood City, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2013 | Dec 2023 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Madera County, CA | # 29 | 26 | 1.3 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.8 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
Kern County, CA | # 1 | 293 | 32.9 TWh |