Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.5 GWh | Sep 2021 | Dec 2023 | Solar |
Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.4 GWh | Sep 2021 | Dec 2023 | Solar |
Amazon PSP1 | Greenbacker Renewable Energy Corporation | Beaumont, CA | California Independent System Operator (CISO) | 7.8 GWh | Sep 2021 | Dec 2023 | Solar |
Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 11.8 GWh | Sep 2021 | Dec 2023 | Other Biomass Gas |
Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 499.8 GWh | Aug 2021 | Jun 2024 | Solar |
Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2021 | Dec 2023 | Solar |
Danell Bros Inc | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 6.1 GWh | Aug 2021 | Dec 2023 | Solar |
Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 50.4 GWh | Aug 2021 | Dec 2023 | Solar |
Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 8.5 GWh | Aug 2021 | Dec 2023 | Natural Gas |
ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2021 | Dec 2023 | Solar |
Vallecitos Water District | SSA Solar of CA 5, LLC | San Marcos, CA | California Independent System Operator (CISO) | 3.5 GWh | Aug 2021 | Dec 2023 | Solar |
Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.7 GWh | Jul 2021 | Dec 2023 | Solar |
Wonderful Huller & Shellling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2021 | Dec 2023 | Solar |
Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 12.3 GWh | Jul 2021 | Dec 2023 | Solar |
EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2022 | Solar |
UC Santa Cruz Solar | Forefront Power, LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2022 | Solar |
Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 185.9 GWh | Jun 2021 | Jun 2024 | Wind |
EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 8.9 GWh | Jun 2021 | Dec 2022 | Solar |
EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2021 | Dec 2022 | Solar |
EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2021 | Dec 2022 | Solar |
Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2021 | Dec 2023 | Solar |
Wonderful Nursery | Wonderful Renewable Energy, LLC. | Wasco, CA | California Independent System Operator (CISO) | 5.5 GWh | Jun 2021 | Dec 2023 | Solar |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2021 | Dec 2023 | Solar |
POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 358.2 MWh | Jun 2021 | Dec 2023 | Solar |
Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2022 | Solar |
Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 36.6 GWh | May 2021 | Dec 2023 | Solar |
Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.0 GWh | May 2021 | Dec 2023 | Solar |
Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 14.9 GWh | May 2021 | Dec 2023 | Natural Gas |
SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 10.3 GWh | May 2021 | Dec 2023 | Other Biomass Gas : 96.4% Natural Gas : 3.6% |
Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 10.0 GWh | May 2021 | Dec 2023 | Natural Gas |
Valencia 3 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 8.6 GWh | Mar 2021 | Dec 2023 | Solar |
El Dorado Solar, LLC | Greenbacker Renewable Energy Corporation | El Dorado Hills, CA | California Independent System Operator (CISO) | 3.5 GWh | Mar 2021 | Dec 2023 | Solar |
Prairie | Prairie Street Operating, LLC | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Mar 2021 | Dec 2022 | Solar |
Five H Farms Solar Array | Maas Energy Works | Merced, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2021 | Dec 2022 | Solar |
Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.3 GWh | Mar 2021 | Dec 2022 | Solar |
San Diego - EMDF at San Diego | California PV Energy 3, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2021 | Dec 2023 | Solar |
Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 48.2 GWh | Mar 2021 | Dec 2023 | Wind |
Gilead Foster City Solar Project | Gilead Sciences Inc. Foster City | Foster City, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2021 | Dec 2022 | Solar |
Rancho Cordova Medical Offices | KP Rancho Cordova Medical Offices Solar, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Mar 2021 | Dec 2023 | Solar |
El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 3.3 GWh | Feb 2021 | Dec 2022 | Solar |
Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 233.0 GWh | Feb 2021 | Jun 2024 | Wind |
San Diego - NCRC at Vista | California PV Energy 3, LLC | Vista, CA | California Independent System Operator (CISO) | 2.9 GWh | Feb 2021 | Dec 2023 | Solar |
Silveira Ranch Road Solar | Silveira Ranch Road Solar | Novato, CA | California Independent System Operator (CISO) | 6.0 GWh | Feb 2021 | Mar 2023 | Solar |
Google Moffett Park Solar Project | Google, Inc. | Sunnyvale, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 2021 | Dec 2022 | Solar |
Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 259.3 GWh | Feb 2021 | Jun 2024 | Wind |
DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 2021 | Dec 2023 | Solar |
Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 78.9 GWh | Jan 2021 | Jun 2024 | Solar |
Rancho Seco Solar II, LLC | Rancho Seco Solar II, LLC | Twin Cities, CA | Balancing Authority of Northern California (BANC) | 243.4 GWh | Jan 2021 | Jun 2024 | Solar |
Foothill Sanitary Landfill - Solar Array | Ameresco San Joaquin Solar LLC | Linden, CA | PacifiCorp West (PACW) | 8.5 GWh | Dec 2020 | Dec 2022 | Solar |
Bodega Avenue Solar LLC | Bodega Avenue Solar LLC | Petaluma, CA | California Independent System Operator (CISO) | 4.3 GWh | Dec 2020 | Dec 2023 | Solar |
Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 29.0 GWh | Nov 2020 | Dec 2023 | Solar |
Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 55.6 GWh | Nov 2020 | Jun 2024 | Solar |
Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 128.5 GWh | Nov 2020 | Jun 2024 | Solar |
Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 86.0 GWh | Nov 2020 | Jun 2024 | Solar |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2020 | Dec 2022 | Natural Gas |
Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 395.0 GWh | Nov 2020 | Jun 2024 | Solar |
Big Bear | Los Palos Street Operating, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 9.2 GWh | Nov 2020 | Dec 2022 | Solar |
Catalina Express | USPS LA Solar FiT A & B | San Pedro, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2020 | Dec 2022 | Solar |
Marina South | USPS LA Solar FiT A & B | San Pedro, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2020 | Dec 2022 | Solar |
Dissigno Healdsburg FPV, LLC | Palmetto Power Management LLC | Healdsburg, CA | California Independent System Operator (CISO) | 6.1 GWh | Nov 2020 | Dec 2023 | Solar |
Valencia 2 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 7.4 GWh | Nov 2020 | Dec 2023 | Solar |
Las Virgenes | Greenbacker Renewable Energy Corporation | Calabasas, CA | Los Angeles Department of Water and Power (LDWP) | 7.0 GWh | Nov 2020 | Dec 2023 | Solar |
Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 12.4 GWh | Nov 2020 | Dec 2023 | Solar |
American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 354.6 GWh | Nov 2020 | Jun 2024 | Solar |
Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 263.7 GWh | Nov 2020 | Jun 2024 | Solar |
Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 127.3 GWh | Nov 2020 | Jun 2024 | Solar |
Titan Solar 1 (CA) | Titan Solar 1, LLC | Borrego Springs, CA | California Independent System Operator (CISO) | 153.7 GWh | Nov 2020 | Jun 2024 | Solar |
Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 189.1 GWh | Nov 2020 | Jun 2024 | Solar |
Wildflower Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Elverta, CA | Balancing Authority of Northern California (BANC) | 30.4 GWh | Nov 2020 | Dec 2023 | Solar |
Golden Field Solar III, LLC | Golden Field Solar III, LLC | Rosamond, CA | California Independent System Operator (CISO) | 575.7 GWh | Nov 2020 | Jun 2024 | Solar |
Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2020 | Dec 2023 | Solar |
DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2020 | Dec 2023 | Solar |
Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2020 | Dec 2023 | Solar |
Renew Solar ABC Sacramento LLC | Greenbacker Renewable Energy Corporation | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.0 GWh | Oct 2020 | Dec 2023 | Solar |
Sacramento Point West Medical Offices | KP Sacramento Point West Medical Offices Solar, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Oct 2020 | Dec 2023 | Solar |
SSI West Riverside Landfill LLC | Standard Solar | Riverside, CA | Los Angeles Department of Water and Power (LDWP) | 5.1 GWh | Oct 2020 | Dec 2023 | Solar |
Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2020 | Dec 2022 | Solar |
Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2020 | Dec 2023 | Solar |
Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 316.4 GWh | Oct 2020 | Jun 2024 | Solar |
Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 422.6 GWh | Oct 2020 | Jun 2024 | Solar |
Wonderful Orchards - New Columbia | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 9.8 GWh | Aug 2020 | Dec 2023 | Solar |
Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2020 | Dec 2023 | Solar |
Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 2020 | Dec 2023 | Solar |
Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2020 | Dec 2023 | Solar |
County of San Diego COC Hybrid | Solar Star California LXXVIII, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2020 | Dec 2023 | Solar : 96.1% Electricity used for energy storage : 3.9% |
Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 2.4 GWh | Jun 2020 | Jun 2024 | Natural Gas |
DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2020 | Dec 2023 | Solar |
Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 36.1 GWh | May 2020 | Dec 2022 | Natural Gas |
Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 138.0 GWh | May 2020 | Jun 2024 | Solar |
Still Water Power | Still Water Power LLC | Hanford, CA | California Independent System Operator (CISO) | 752.1 MWh | Apr 2020 | Dec 2023 | Other Biomass Gas |
Sierra Pacific Industries (2042-RD) | Sierra Pacific Industries | Red Bluff, CA | California Independent System Operator (CISO) | 17.3 GWh | Apr 2020 | Dec 2023 | Solar |
Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 372.4 GWh | Apr 2020 | Jun 2024 | Solar |
Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 4.3 GWh | Mar 2020 | Dec 2023 | Solar |
Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 2.0 GWh | Mar 2020 | Dec 2022 | Solar |
SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2020 | Dec 2022 | Solar : 99.9% |
Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 73.9 GWh | Mar 2020 | Jun 2024 | Solar |
Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2020 | Dec 2023 | Solar |
Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2020 | Dec 2023 | Solar : 99.3% Electricity used for energy storage : 0.7% |
San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 7.8 GWh | Feb 2020 | Dec 2022 | Natural Gas |
IOS II-LAX9 | IOS II LLC | Fontana, CA | California Independent System Operator (CISO) | 7.5 GWh | Jan 2020 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2022 generation numbers.County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |