Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 107.0 MWh | Nov 2023 | Dec 2023 | Solar |
Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 284.8 GWh | Nov 2023 | Jun 2024 | Solar |
Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 43.0 GWh | Nov 2023 | Jun 2024 | Solar |
Chestnut | Chestnut Westside, LLC | Lemoore, CA | California Independent System Operator (CISO) | 216.0 GWh | Nov 2023 | Jun 2024 | Solar : 91.7% Electricity used for energy storage : 8.3% |
Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 354.8 GWh | Nov 2023 | Jun 2024 | Solar : 92.0% Electricity used for energy storage : 8.0% |
Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 148.6 GWh | Nov 2023 | Jun 2024 | Wind |
Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 354.0 MWh | Oct 2023 | Dec 2023 | Solar |
Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2023 | Dec 2023 | Other Biomass Gas |
Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 932.0 MWh | Oct 2023 | Dec 2023 | Solar |
Sunny Cow Solar, LLC | Sunny Cow Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 847.0 MWh | Sep 2023 | Dec 2023 | Solar |
Scooby Solar, LLC | Scooby Solar, LLC | Famoso, CA | California Independent System Operator (CISO) | 927.0 MWh | Sep 2023 | Dec 2023 | Solar |
Fifth Standard Solar PV, LLC (Hybrid) | RWE Renewables Americas, LLC | Huron, CA | California Independent System Operator (CISO) | 241.9 GWh | Aug 2023 | Jun 2024 | Solar |
Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 619.0 MWh | Aug 2023 | Dec 2023 | Solar |
Wheeler Ridge | AFTW Holdings, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.4 GWh | Aug 2023 | Dec 2023 | Solar |
CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 462.0 MWh | Aug 2023 | Dec 2023 | Solar |
Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 393.1 GWh | Aug 2023 | Jun 2024 | Solar |
Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 410.5 GWh | Aug 2023 | Jun 2024 | Solar |
Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 76.0 GWh | Aug 2023 | Jun 2024 | Solar |
Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 9.5 GWh | Aug 2023 | Dec 2023 | Solar |
Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 209.9 GWh | Jul 2023 | Jun 2024 | Solar |
CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
Sheep Creek Community Solar Farm | Phelan Solar LLC | El Mirage, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
Resurgence Solar II | Resurgence Solar II | Boron, CA | California Independent System Operator (CISO) | 110.2 GWh | Jul 2023 | Jun 2024 | Solar |
Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 759.2 GWh | Jun 2023 | Jun 2024 | Solar |
Lockhart Solar PV II | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 185.2 GWh | Jun 2023 | Jun 2024 | Solar |
RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 44.2 GWh | Apr 2023 | Dec 2023 | Solar |
RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 46.3 GWh | Apr 2023 | Dec 2023 | Solar |
CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.7 GWh | Apr 2023 | Dec 2023 | Solar |
City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 1.2 GWh | Apr 2023 | Dec 2023 | Solar |
RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 117.5 GWh | Apr 2023 | Jun 2024 | Solar |
Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2023 | Solar |
Renew Solar VMC LLC | Renew Solar VMC LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2023 | Dec 2023 | Solar |
IGS SBD2 | Greenbacker Renewable Energy Corporation | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.2 GWh | Jan 2023 | Dec 2023 | Solar |
IGS SBD1 | Greenbacker Renewable Energy Corporation | Bloomington, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Jan 2023 | Dec 2023 | Solar |
Anheuser Busch - Fairfield | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 22.3 GWh | Nov 2022 | Dec 2023 | Natural Gas |
Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 171.1 GWh | Nov 2022 | Jun 2024 | Solar |
Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 271.2 GWh | Nov 2022 | Jun 2024 | Solar |
CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2022 | Dec 2023 | Solar |
Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2022 | Dec 2023 | Solar |
Blythe Mesa Solar II | Blythe Mesa Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 607.9 GWh | Nov 2022 | Jun 2024 | Solar |
Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.9 GWh | Oct 2022 | Dec 2023 | Solar |
Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 13.3 GWh | Oct 2022 | Dec 2023 | Solar |
Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 28.6 GWh | Oct 2022 | Dec 2023 | Solar |
Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 329.9 GWh | Oct 2022 | Jun 2024 | Solar |
Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 76.3 GWh | Oct 2022 | Jun 2024 | Solar |
Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 376.5 GWh | Oct 2022 | Jun 2024 | Solar |
Putah Creek Solar Farm North | Putah Creek Solar Farms LLC | Winters, CA | California Independent System Operator (CISO) | 5.2 GWh | Sep 2022 | Dec 2022 | Solar |
Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 290.7 GWh | Sep 2022 | Jun 2024 | Solar |
CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.7 GWh | Sep 2022 | Dec 2023 | Solar |
Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 9.5 GWh | Aug 2022 | Dec 2023 | Solar |
Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.6 GWh | Jul 2022 | Dec 2023 | Solar |
Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 19.0 GWh | Jul 2022 | Dec 2023 | Wind |
Wonderful Kings | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2022 | Dec 2023 | Solar |
Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 294.1 GWh | Jul 2022 | Jun 2024 | Solar |
Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 349.9 GWh | Jul 2022 | Jun 2024 | Solar |
20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Jun 2022 | Dec 2022 | Solar |
Abel Road Bioenergy | ACC Renewable Resources | Williams, CA | California Independent System Operator (CISO) | 18.9 GWh | Jun 2022 | Dec 2023 | Agricultural By-Products |
Wister Solar | Wister Solar | Niland, CA | Imperial Irrigation District (IID) | 31.3 GWh | Jun 2022 | Dec 2023 | Solar |
CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 295.2 GWh | Jun 2022 | Dec 2023 | Geothermal |
Tajiguas Resource Recovery Project | MSB Investors, LLC | Goleta, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2022 | Dec 2023 | Other Biomass Gas |
Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 670.1 GWh | May 2022 | Jun 2024 | Solar |
Dover Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 2.9 GWh | Apr 2022 | Dec 2023 | Solar |
Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2022 | Dec 2023 | Solar : 88.9% Electricity used for energy storage : 11.1% |
Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 2.0 MWh | Apr 2022 | Dec 2022 | Solar |
EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 6.7 GWh | Apr 2022 | Dec 2022 | Solar |
University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 5.2 GWh | Apr 2022 | Dec 2022 | Solar |
Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 140.8 GWh | Mar 2022 | Jun 2024 | Solar |
Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 557.6 GWh | Feb 2022 | Jun 2024 | Solar |
Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2022 | Dec 2023 | Solar |
CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2022 | Dec 2023 | Solar |
Sierra Pacific Chinese Camp | Sierra Pacific Industries | Chinese Camp, CA | California Independent System Operator (CISO) | 5.2 GWh | Feb 2022 | Dec 2023 | Solar |
Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 88.1 GWh | Feb 2022 | Jun 2024 | Solar |
Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 104.5 GWh | Feb 2022 | Jun 2024 | Solar |
Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2023 | Solar |
Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 554.6 MWh | Feb 2022 | Dec 2023 | Solar |
IGS KSBD | Greenbacker Renewable Energy Corporation | Highland, CA | California Independent System Operator (CISO) | 9.3 GWh | Feb 2022 | Dec 2023 | Solar |
Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2022 | Dec 2023 | Solar |
8500 Balboa PV, LLC | 8500 Balboa PV, LLC | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 5.2 GWh | Jan 2022 | Dec 2022 | Solar |
BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 300.5 GWh | Jan 2022 | Jun 2024 | Solar |
POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2023 | Solar |
Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 317.5 GWh | Nov 2021 | Jun 2024 | Solar |
Redwood Coast Airport Microgrid | Redwood Coast Energy Authority | McKinleyville, CA | California Independent System Operator (CISO) | 30.7 MWh | Nov 2021 | Dec 2023 | Solar |
California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2021 | Dec 2022 | Solar |
CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2021 | Dec 2022 | Solar |
Deer Creek 2 | Greenbacker Renewable Energy Corporation | Shingle Springs, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2021 | Dec 2023 | Solar |
Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 56.0 GWh | Nov 2021 | Jun 2024 | Solar |
Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 318.9 GWh | Nov 2021 | Jun 2024 | Solar |
SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 537.2 GWh | Nov 2021 | Jun 2024 | Solar |
Canal Energy S23, LLC | Canal Energy S23, LLC | Hanford, CA | California Independent System Operator (CISO) | 7.7 GWh | Nov 2021 | Dec 2022 | Solar |
Niagara Bottling - Rialto | SkyHigh 2 Solar | Rialto, CA | California Independent System Operator (CISO) | 8.6 GWh | Nov 2021 | Dec 2022 | Solar |
POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 292.0 MWh | Nov 2021 | Dec 2023 | Solar |
Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 363.0 GWh | Nov 2021 | Jun 2024 | Solar |
BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2021 | Dec 2022 | Solar |
Blue Skies Solar, LLC | Blue Skies Solar, LLC | Arvin, CA | PacifiCorp West (PACW) | 239.0 MWh | Nov 2021 | Dec 2022 | Solar |
Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2021 | Dec 2022 | Solar |
Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 619.8 GWh | Oct 2021 | Jun 2024 | Solar |
Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 9.1 GWh | Oct 2021 | Dec 2022 | Solar |
Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2021 | Dec 2023 | Solar |
Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 9.0 GWh | Oct 2021 | Dec 2022 | Solar |
Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 298.6 GWh | Oct 2021 | Jun 2024 | Solar : 99.8% |
Browse Power Plants By California Counties
Figures are based on December 2022 generation numbers.County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |