Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 714.7 GWh | Oct 2013 | Dec 2022 | Solar |
Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 181.6 GWh | - | Jun 2024 | Solar |
Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 410.5 GWh | Aug 2023 | Jun 2024 | Solar |
Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 280.2 GWh | - | Jun 2024 | Solar |
Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 393.1 GWh | Aug 2023 | Jun 2024 | Solar |
Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 450.0 GWh | Oct 2013 | Dec 2022 | Solar |
Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 395.0 GWh | Nov 2020 | Jun 2024 | Solar |
Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 189.1 GWh | Nov 2020 | Jun 2024 | Solar |
Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 127.3 GWh | Nov 2020 | Jun 2024 | Solar |
Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 263.7 GWh | Nov 2020 | Jun 2024 | Solar |
Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 298.6 GWh | Oct 2021 | Jun 2024 | Solar : 99.8% |
Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 363.0 GWh | Nov 2021 | Jun 2024 | Solar |
Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 670.1 GWh | May 2022 | Jun 2024 | Solar |
SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 537.2 GWh | Nov 2021 | Jun 2024 | Solar |
Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 619.0 MWh | Aug 2023 | Dec 2023 | Solar |
North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2012 | Dec 2023 | Solar |
Roll Delano 2 | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 8.2 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Roll Delano | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 9.7 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 31.1 GWh | Aug 2016 | Dec 2023 | Solar |
Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 45.5 GWh | Aug 2016 | Dec 2023 | Solar |
Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 1.1 GWh | Nov 2017 | Dec 2023 | Solar |
Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 15.2 GWh | Dec 2012 | Dec 2022 | Natural Gas |
Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.1 GWh | Aug 2010 | Dec 2022 | Solar |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2021 | Dec 2023 | Solar |
POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 292.0 MWh | Nov 2021 | Dec 2023 | Solar |
POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2023 | Solar |
Grassland 3&4 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2013 | Nov 2023 | Solar |
UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 24.4 GWh | Feb 2015 | Dec 2023 | Solar |
Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2013 | Dec 2022 | Solar |
Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 759.2 GWh | Jun 2023 | Jun 2024 | Solar |
Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 284.8 GWh | Nov 2023 | Jun 2024 | Solar |
Sunray 3 | Sunray Energy 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 33.9 GWh | Nov 1985 | Dec 2023 | Solar |
Sunray 2 | Sunray Energy 2, LLC | Daggett, CA | California Independent System Operator (CISO) | 59.1 GWh | Nov 1984 | Dec 2023 | Solar |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 85.0 GWh | Oct 2017 | Jun 2024 | Solar |
Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 16.3 GWh | May 2017 | Dec 2023 | Solar |
APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 29.4 GWh | Apr 2017 | Dec 2023 | Natural Gas |
Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 27.8 GWh | May 2017 | Dec 2023 | Landfill Gas |
Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 68.2 GWh | - | Jun 2024 | Solar |
Covanta Stanislaus Energy | Covanta Stanislaus Inc | Crows Landing, CA | California Independent System Operator (CISO) | 101.3 GWh | Aug 1988 | Jun 2024 | Non-biogenic Municipal Solid Waste : 52.2% Biogenic Municipal Solid Waste : 42.7% Distillate Fuel Oil : 5.1% |
Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.7 TWh | Nov 1995 | Jun 2024 | Natural Gas |
C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 42.3 GWh | Sep 1957 | Jun 2024 | Purchased Steam |
Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2022 | Dec 2023 | Solar : 88.9% Electricity used for energy storage : 11.1% |
Temescal | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 7.7 GWh | Jun 1983 | Dec 2023 | Water |
Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 14.8 GWh | Feb 2005 | Dec 2023 | Natural Gas |
Corona | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 4.7 GWh | Jul 1983 | Dec 2023 | Water |
Temescal Canyon RV, LLC | Temescal Canyon RV, LLC | Corona, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2011 | Dec 2023 | Solar |
CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 2.7 GWh | Aug 2019 | Dec 2023 | Solar |
CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 41.1 GWh | Nov 2014 | Dec 2023 | Solar |
Corcoran Solar 2 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 48.9 GWh | Apr 2015 | Dec 2023 | Solar |
CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 9.1 GWh | Nov 2013 | Dec 2023 | Solar |
Corcoran Solar 3 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 51.4 GWh | Jan 2016 | Dec 2023 | Solar |
Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 2.1 GWh | Dec 2013 | Dec 2023 | Solar |
Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.3 GWh | Apr 2015 | Dec 2023 | Solar |
Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 36.7 GWh | Jul 2013 | Dec 2023 | Solar |
ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2021 | Dec 2023 | Solar |
Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.2 GWh | Mar 2015 | Dec 2023 | Solar |
Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 11.5 GWh | May 2003 | Dec 2023 | Natural Gas |
Drews Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 865.7 MWh | Jul 2001 | Dec 2022 | Natural Gas |
Century Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 1.1 GWh | Aug 2001 | Dec 2022 | Natural Gas |
Rollins | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 77.1 GWh | Jul 1980 | Dec 2023 | Water |
Chicago Park | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 142.3 GWh | Oct 1965 | Dec 2023 | Water |
Coalinga Cogeneration Facility | Aera Energy LLC-Coalinga | Coalinga, CA | California Independent System Operator (CISO) | 49.1 GWh | May 1988 | Dec 2023 | Natural Gas |
Coalinga 25D Cogen | Chevron USA Inc | Coalinga, CA | California Independent System Operator (CISO) | 72.8 GWh | Sep 1986 | Dec 2023 | Natural Gas |
CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.2 GWh | Jun 2014 | Dec 2023 | Solar |
DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2014 | Dec 2023 | Solar |
Coachella | Imperial Irrigation District | Coachella, CA | Imperial Irrigation District (IID) | 1.0 GWh | May 1973 | Dec 2023 | Natural Gas : 93.8% Distillate Fuel Oil : 6.2% |
Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2023 | Solar |
Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2023 | Solar |
Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Apr 2019 | Dec 2022 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2009 | Dec 2022 | Solar |
Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 58.9 GWh | Jun 1983 | Dec 2023 | Water |
Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 5.9 GWh | Sep 1983 | Sep 2023 | Water |
Chula Vista Energy Center | Wellhead Services, Inc | Chula Vista, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2001 | Dec 2023 | Natural Gas |
SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2022 | Solar |
County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.4 GWh | Nov 2018 | Dec 2023 | Solar |
DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2020 | Dec 2023 | Solar |
Adera Solar | AES Distributed Energy | Chowchilla, CA | California Independent System Operator (CISO) | 28.5 GWh | Nov 2015 | Dec 2023 | Solar |
DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 2021 | Dec 2023 | Solar |
Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 11.8 GWh | Sep 2021 | Dec 2023 | Other Biomass Gas |
Ampersand Chowchilla Biomass LLC | Ampersand Chowchilla Biomass LLC | Chowchilla, CA | California Independent System Operator (CISO) | 58.4 GWh | Apr 2008 | Dec 2022 | Wood/Wood Waste Solids : 99.8% |
Chowchilla II | California Power Holdings LLC | Chowchilla, CA | California Independent System Operator (CISO) | 15.8 GWh | May 2001 | Dec 2023 | Natural Gas |
Solar Photovoltaic Project #02 | Southern California Edison Co | Chino, CA | California Independent System Operator (CISO) | 549.6 MWh | Nov 2009 | Apr 2023 | Solar |
OLS Energy Chino | OLS Energy-Chino | Chino, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 1987 | Dec 2023 | Natural Gas |
San Antonio West Solar Rooftop | SS San Antonio West LLC | Chino, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2012 | Dec 2023 | Solar |
CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.5 GWh | Jan 2020 | Dec 2023 | Solar |
Sierra Pacific Chinese Camp | Sierra Pacific Industries | Chinese Camp, CA | California Independent System Operator (CISO) | 5.2 GWh | Feb 2022 | Dec 2023 | Solar |
Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 14.9 GWh | May 2021 | Dec 2023 | Natural Gas |
Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 10.0 GWh | Apr 2005 | Dec 2023 | Natural Gas : 76.2% Solar : 23.8% |
Collins Pine Project | Collins Pine Co | Chester, CA | California Independent System Operator (CISO) | 25.8 GWh | Nov 1985 | Dec 2022 | Wood/Wood Waste Solids |
East Portal Generator | Calleguas Mun Water District | Chatsworth, CA | California Independent System Operator (CISO) | 4.1 GWh | Dec 1986 | Dec 2023 | Water |
Nordhoff Place | Los Angeles Department of Water & Power | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Aug 2014 | Dec 2023 | Solar |
Prairie | Prairie Street Operating, LLC | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Mar 2021 | Dec 2022 | Solar |
20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Jun 2022 | Dec 2022 | Solar |
Edom Hills Project 1 LLC | Edom Hills Project 1 LLC | Cathedral City, CA | California Independent System Operator (CISO) | 11.2 GWh | Aug 2008 | Dec 2023 | Wind |
Castaic | Los Angeles Department of Water & Power | Castaic, CA | Los Angeles Department of Water and Power (LDWP) | 57.7 GWh | Dec 1971 | Jun 2024 | Water |
Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 36.0 GWh | Oct 2010 | Dec 2023 | Landfill Gas |
Foothill Feeder | Metropolitan Water District of S CA | Castaic, CA | California Independent System Operator (CISO) | 19.6 GWh | Mar 1981 | Dec 2023 | Water |
Watson Cogeneration | ARCO Products Co-Watson | Carson, CA | California Independent System Operator (CISO) | 2.5 TWh | Nov 1987 | Jun 2024 | Natural Gas : 83.4% Other Gas : 15.6% Waste/Other Oil : 1.0% |
Total Energy Facilities | Los Angeles County Sanitation | Carson, CA | California Independent System Operator (CISO) | 172.2 GWh | Dec 1985 | Dec 2022 | Other Biomass Gas : 73.8% Natural Gas : 26.2% |
Browse Power Plants By California Counties
Figures are based on December 2022 generation numbers.County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |