Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.8 GWh | Apr 2014 | Dec 2023 | Solar |
Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.1 GWh | Apr 2014 | Dec 2023 | Solar |
Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2023 | Solar |
Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 28.0 GWh | Sep 2015 | Dec 2023 | Solar |
ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2009 | Dec 2023 | Solar |
Beringer | Perpetual Energy Systems | Saint Helena, CA | California Independent System Operator (CISO) | 1.3 GWh | Dec 2008 | Dec 2023 | Solar |
Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2013 | Dec 2023 | Solar |
Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2013 | Dec 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2015 | Dec 2023 | Solar |
MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 41.3 GWh | Jan 2003 | Dec 2023 | Natural Gas |
2081 Terzian Solar Project | Solarenewal LLC | Reedley, CA | California Independent System Operator (CISO) | 2.0 GWh | Jan 2014 | Dec 2023 | Solar |
2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2014 | Dec 2023 | Solar |
2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2023 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Intel Folsom Phase 2 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.7 GWh | Sep 2012 | Dec 2023 | Solar |
Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 14.2 GWh | Feb 2013 | Dec 2023 | Other Biomass Gas : 85.5% Natural Gas : 14.5% |
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2023 | Solar |
White River Solar 2 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 49.3 GWh | Aug 2014 | Dec 2023 | Solar |
Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 234.2 GWh | Jul 2016 | Dec 2023 | Solar |
RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 117.6 GWh | Nov 2014 | Dec 2023 | Solar |
RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 29.9 GWh | Nov 2014 | Dec 2023 | Solar |
RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 38.7 GWh | Nov 2014 | Dec 2023 | Solar |
RE Old River One, LLC | Onward Energy | Bakersfield, CA | California Independent System Operator (CISO) | 34.7 GWh | Nov 2014 | Dec 2023 | Solar |
RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 34.2 GWh | Nov 2014 | Dec 2023 | Solar |
RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2014 | Dec 2023 | Solar |
Woodmere Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 31.0 GWh | Nov 2015 | Dec 2023 | Solar |
Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 58.4 GWh | Nov 2015 | Dec 2023 | Solar |
Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 25.3 GWh | Apr 2015 | Dec 2023 | Solar |
Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 21.1 GWh | Apr 2015 | Dec 2023 | Solar |
Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2023 | Solar |
Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Dec 2023 | Solar |
Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.7 GWh | May 2014 | Dec 2023 | Solar |
Enerparc CA1 LLC | Enerparc CA 1, LLC | Hollister, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2023 | Solar |
CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2023 | Solar |
CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2023 | Solar |
EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2023 | Solar |
EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2023 | Solar |
SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2011 | Dec 2023 | Solar |
RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 149.9 GWh | Jul 2016 | Dec 2023 | Solar |
Lancaster Solar 1 | PsomasFMG Lancaster Solar Crest, LLC | Lancaster, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2014 | Dec 2023 | Solar |
Lancaster Solar 2 | PsomasFMG Lancaster Solar Crest, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2023 | Solar |
Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2014 | Dec 2023 | Solar |
CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 39.0 GWh | Nov 2014 | Dec 2023 | Solar |
Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 5.7 GWh | Jun 2014 | Dec 2023 | Solar |
Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2014 | Dec 2023 | Solar |
Rising Tree Wind Farm II | Rising Tree Wind Farm II LLC | Mojave, CA | California Independent System Operator (CISO) | 47.7 GWh | Dec 2014 | Dec 2023 | Wind |
Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 261.7 GWh | May 2015 | Dec 2023 | Wind |
Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 49.8 GWh | Nov 2014 | Dec 2023 | Solar |
Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 46.5 GWh | Nov 2016 | Dec 2023 | Solar |
Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 48.0 GWh | Nov 2016 | Dec 2023 | Solar |
Wildwood Solar II | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 36.6 GWh | Dec 2016 | Dec 2023 | Solar |
Verizon-Torrance | Bloom Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.8 GWh | Nov 2013 | Dec 2023 | Natural Gas |
Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 7.9 GWh | Nov 2014 | Dec 2023 | Solar |
Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2014 | Dec 2023 | Solar |
Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2014 | Dec 2023 | Solar |
Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2014 | Dec 2023 | Solar |
Victor Mesa Linda B2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2014 | Dec 2023 | Solar |
Victor Mesa Linda C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2014 | Dec 2023 | Solar |
Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2023 | Solar |
Victor Mesa Linda E2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2023 | Solar |
SEPV Palmdale East | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 24.3 GWh | Jul 2015 | Dec 2023 | Solar |
Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.0 GWh | Feb 2013 | Dec 2023 | Natural Gas |
Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 3.8 GWh | Aug 2013 | Dec 2023 | Natural Gas |
California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2014 | Dec 2023 | Solar |
Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 5.9 GWh | Apr 2017 | Dec 2023 | Landfill Gas |
Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 4.6 GWh | Jul 2014 | Dec 2023 | Solar |
Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 43.8 GWh | Dec 2014 | Dec 2023 | Solar |
Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.1 GWh | Jul 2014 | Dec 2023 | Solar |
City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.3 GWh | Oct 2014 | Dec 2023 | Wind |
Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2014 | Dec 2023 | Wind |
Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 45.0 GWh | Jul 2015 | Dec 2023 | Solar |
Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 213.5 GWh | Oct 2015 | Dec 2023 | Solar |
SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2014 | Dec 2023 | Solar |
SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.4 GWh | Sep 2014 | Dec 2023 | Solar |
Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 44.7 GWh | Jan 2015 | Dec 2023 | Solar |
Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.3 GWh | Dec 2014 | Dec 2023 | Solar |
Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 48.2 GWh | Apr 2015 | Dec 2023 | Solar |
Madelyn Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2014 | Dec 2023 | Solar |
Rudy Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2014 | Dec 2023 | Solar |
Mitchell Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2014 | Dec 2023 | Solar |
Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 45.5 GWh | Apr 2015 | Dec 2023 | Solar |
Corcoran Solar 2 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 46.8 GWh | Apr 2015 | Dec 2023 | Solar |
Atwell Island West Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 46.5 GWh | Apr 2015 | Dec 2023 | Solar |
Anaheim Solar Energy Plant | Anaheim Public Utilities | Anaheim, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2014 | Dec 2023 | Solar |
SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.4 GWh | Oct 2014 | Dec 2023 | Solar |
SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2023 | Solar |
SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2023 | Solar |
Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2014 | Dec 2023 | Water |
Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 33.9 GWh | Oct 2015 | Dec 2023 | Solar |
Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 17.0 GWh | Jun 2015 | Dec 2023 | Solar |
Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 54.9 GWh | Aug 2015 | Dec 2023 | Solar |
TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 53.4 GWh | Oct 2014 | Dec 2023 | Solar |
Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 161.1 GWh | Mar 2016 | Dec 2023 | Landfill Gas |
Alamo Solar | Onward Energy | Oro Grande, CA | California Independent System Operator (CISO) | 43.7 GWh | Apr 2015 | Dec 2023 | Solar |
Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 15.6 GWh | May 2017 | Dec 2023 | Solar |
Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 21.9 GWh | May 2017 | Dec 2023 | Solar |
Five Points Solar Park | Five Points Solar Park, LLC | Five Points, CA | California Independent System Operator (CISO) | 102.0 GWh | Aug 2016 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Madera County, CA | # 29 | 26 | 1.3 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.8 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
Kern County, CA | # 1 | 293 | 32.9 TWh |