Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 95.3 GWh | Apr 2023 | Dec 2024 | Solar |
SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 487.5 GWh | Nov 2021 | Dec 2024 | Solar |
Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 215.9 GWh | Feb 2021 | Dec 2024 | Wind |
Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 170.5 GWh | Jun 2021 | Dec 2024 | Wind |
Springbok 3 Solar Farm Hybrid | 64KT 8me LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 246.7 GWh | Jun 2019 | Dec 2024 | Solar |
Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 140.4 GWh | Nov 2016 | Dec 2024 | Solar |
Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 148.3 GWh | Nov 2016 | Dec 2024 | Solar |
Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 392.8 GWh | Nov 2019 | Dec 2024 | Wind |
Midway Solar Farm 1 | 83WI 8ME, LLC | Calipatria, CA | Imperial Irrigation District (IID) | 121.1 GWh | Dec 2017 | Dec 2024 | Solar |
Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 236.9 GWh | Dec 2018 | Dec 2024 | Solar |
Fifth Standard Solar PV, LLC (Hybrid) | RWE Renewables Americas, LLC | Huron, CA | California Independent System Operator (CISO) | 321.3 GWh | Aug 2023 | Dec 2024 | Solar |
Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 2.1 GWh | Jun 2020 | Dec 2024 | Natural Gas |
Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 301.0 GWh | Nov 2021 | Dec 2024 | Solar |
American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 323.9 GWh | Nov 2020 | Dec 2024 | Solar |
Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 254.2 GWh | Oct 2021 | Dec 2024 | Solar : 99.8% |
Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 635.6 GWh | Feb 2022 | Dec 2024 | Solar |
Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 233.0 GWh | Jul 2023 | Dec 2024 | Solar |
Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 237.5 GWh | Nov 2020 | Dec 2024 | Solar |
Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 156.5 GWh | Nov 2020 | Dec 2024 | Solar |
Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 57.6 GWh | Apr 2017 | Dec 2024 | Solar |
Colgreen North Shore Solar Farm | Sunpin Holdings, LLC | Mecca, CA | Imperial Irrigation District (IID) | 128.8 GWh | Nov 2018 | Dec 2024 | Solar |
Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 273.9 GWh | Jul 2022 | Dec 2024 | Solar |
Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 283.7 GWh | Nov 2021 | Dec 2024 | Solar |
Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 115.6 GWh | Nov 2016 | Dec 2024 | Solar |
Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 193.2 GWh | Nov 2016 | Dec 2024 | Solar |
Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 254.6 GWh | Sep 2022 | Dec 2024 | Solar : 99.9% |
Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 137.3 GWh | Mar 2017 | Dec 2024 | Other Biomass Gas : 62.7% Natural Gas : 37.3% |
Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 68.5 GWh | Jan 2021 | Dec 2024 | Solar |
Titan Solar 1 (CA) | Titan Solar 1, LLC | Borrego Springs, CA | California Independent System Operator (CISO) | 145.3 GWh | Nov 2020 | Dec 2024 | Solar |
Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 298.8 GWh | Oct 2020 | Dec 2024 | Solar |
Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 349.4 GWh | Apr 2020 | Dec 2024 | Solar |
Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 334.1 GWh | Jun 2016 | Dec 2024 | Solar |
Golden Field Solar III, LLC | Golden Field Solar III, LLC | Rosamond, CA | California Independent System Operator (CISO) | 538.5 GWh | Nov 2020 | Dec 2024 | Solar |
Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 529.0 GWh | Nov 2023 | Dec 2024 | Solar |
Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 870.8 GWh | Jun 2023 | Dec 2024 | Solar |
Chestnut | Chestnut Westside, LLC | Lemoore, CA | California Independent System Operator (CISO) | 384.5 GWh | Nov 2023 | Dec 2024 | Solar : 95.4% |
Chaparral Springs | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 444.4 GWh | - | Dec 2024 | Solar |
Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 50.4 GWh | Nov 2021 | Dec 2024 | Solar |
Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 327.2 GWh | Jul 2022 | Dec 2024 | Solar |
Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 294.9 GWh | Nov 2021 | Dec 2024 | Solar |
Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 263.3 GWh | - | Dec 2024 | Solar |
Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 125.0 GWh | Mar 2022 | Dec 2024 | Solar |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 66.8 GWh | Oct 2017 | Dec 2024 | Solar |
Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 617.9 GWh | Nov 2023 | Dec 2024 | Solar : 95.5% |
Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 79.7 GWh | Feb 2022 | Dec 2024 | Solar |
CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 325.6 GWh | Jan 2019 | Dec 2024 | Solar |
CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 228.5 GWh | Oct 2017 | Dec 2024 | Solar |
Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 92.4 GWh | Feb 2022 | Dec 2024 | Solar |
BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 330.0 GWh | Jan 2022 | Dec 2024 | Solar |
Blythe Mesa Solar II | Blythe Mesa Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 552.0 GWh | Nov 2022 | Dec 2024 | Solar |
Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 654.7 GWh | Oct 2021 | Dec 2024 | Solar |
RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 156.0 GWh | Nov 2016 | Dec 2024 | Solar |
RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 223.1 GWh | Nov 2016 | Dec 2024 | Solar |
Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 99.9 GWh | Nov 2016 | Dec 2024 | Solar |
Great Valley Solar Portfolio Holdings, LLC | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 525.6 GWh | Nov 2017 | Dec 2024 | Solar |
Eland Solar & Storage Center, Phase 1 Hybrid | 68SF 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 68.3 GWh | - | Dec 2024 | Solar |
Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 602.1 GWh | Oct 2018 | Dec 2024 | Solar |
North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 392.7 GWh | May 2019 | Dec 2024 | Solar |
Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 128.6 GWh | Oct 2017 | Dec 2024 | Wind |
Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 81.7 GWh | - | Dec 2024 | Solar |
Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 82.2 GWh | Nov 2020 | Dec 2024 | Solar |
Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 246.1 GWh | Nov 2018 | Dec 2024 | Solar |
Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 408.4 GWh | Dec 2019 | Dec 2024 | Solar |
Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 64.9 GWh | Mar 2020 | Dec 2024 | Solar |
Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 239.3 GWh | Feb 2021 | Dec 2024 | Wind |
Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 506.7 GWh | Nov 2018 | Dec 2024 | Wind |
Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 151.4 GWh | Nov 2018 | Dec 2024 | Wind |
Rancho Seco Solar II, LLC | Rancho Seco Solar II, LLC | Twin Cities, CA | Balancing Authority of Northern California (BANC) | 294.8 GWh | Jan 2021 | Dec 2024 | Solar |
Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 618.1 GWh | May 2022 | Dec 2024 | Solar |
Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 113.9 GWh | May 2020 | Dec 2024 | Solar |
Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 337.9 GWh | Nov 2019 | Dec 2024 | Solar |
Wistaria Ranch Solar | Consolidated Edison Development Inc. | Calexico, CA | California Independent System Operator (CISO) | 292.0 GWh | Nov 2018 | Dec 2024 | Solar |
Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 310.5 GWh | Oct 2022 | Dec 2024 | Solar |
Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 19.8 GWh | - | Dec 2024 | Solar |
Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 11.5 GWh | - | Dec 2024 | Solar |
W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 30.1 GWh | Jun 2005 | Dec 2024 | Natural Gas |
Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 375.4 GWh | Nov 2020 | Dec 2024 | Solar |
Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 110.0 GWh | Aug 2023 | Dec 2024 | Solar |
San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 256.7 GWh | Jul 2019 | Dec 2024 | Solar |
Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 384.1 GWh | Oct 2020 | Dec 2024 | Solar |
Citizens Imperial Solar | Citizens Enterprises Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 50.3 GWh | Jul 2019 | Dec 2024 | Solar |
Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 552.5 GWh | - | Dec 2024 | Solar |
Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2024 | Wind |
Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2014 | Dec 2024 | Wind |
Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 229.7 GWh | Nov 2023 | Dec 2024 | Wind |
AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 2.4 TWh | Jan 2020 | Dec 2024 | Natural Gas |
Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 115.5 GWh | Nov 2016 | Dec 2024 | Solar |
Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 132.2 GWh | Nov 2016 | Dec 2024 | Solar |
Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 128.2 GWh | Mar 2017 | Dec 2024 | Solar |
Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 109.9 GWh | Nov 2017 | Dec 2024 | Solar |
Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 92.9 GWh | Nov 2017 | Dec 2024 | Solar |
Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 476.5 GWh | - | Dec 2024 | Solar |
AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 2.4 TWh | Jan 2020 | Dec 2024 | Natural Gas |
Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 268.7 GWh | - | Dec 2024 | Solar |
Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 197.2 GWh | Nov 2020 | Dec 2024 | Solar |
Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 554.4 GWh | Aug 2023 | Dec 2024 | Solar |
Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 522.3 GWh | Aug 2023 | Dec 2024 | Solar |
Scarlet II Hybrid | EDPR Scarlet II LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 9.0 GWh | - | Dec 2024 | Solar |
Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 132.1 GWh | Nov 2022 | Dec 2024 | Solar |
Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 72.4 GWh | Oct 2022 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2023 generation numbers.County | State Rank | Active Plants | Dec 2023 Generation |
---|---|---|---|
Marin County, CA | # 55 | 3 | 7.4 GWh |
Mendocino County, CA | # 54 | 4 | 11.1 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 64.7 GWh |
Tehama County, CA | # 49 | 7 | 71.5 GWh |
San Francisco County, CA | # 48 | 10 | 76.7 GWh |
San Mateo County, CA | # 47 | 10 | 126.6 GWh |
Yolo County, CA | # 46 | 15 | 226.6 GWh |
San Benito County, CA | # 45 | 5 | 294.2 GWh |
Mariposa County, CA | # 44 | 2 | 296.6 GWh |
Siskiyou County, CA | # 43 | 8 | 321.3 GWh |
Lassen County, CA | # 42 | 9 | 339.7 GWh |
Santa Barbara County, CA | # 41 | 18 | 342.6 GWh |
Nevada County, CA | # 40 | 12 | 348.8 GWh |
Merced County, CA | # 39 | 25 | 387.0 GWh |
Trinity County, CA | # 38 | 5 | 424.4 GWh |
Humboldt County, CA | # 37 | 10 | 468.2 GWh |
Calaveras County, CA | # 36 | 6 | 746.1 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 805.6 GWh |
Tulare County, CA | # 33 | 53 | 814.3 GWh |
Amador County, CA | # 32 | 7 | 817.5 GWh |
Lake County, CA | # 31 | 10 | 907.5 GWh |
Madera County, CA | # 30 | 26 | 1.0 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Dec 2023 Generation |
---|---|---|---|
El Dorado County, CA | # 27 | 15 | 1.7 TWh |
Sutter County, CA | # 26 | 7 | 1.7 TWh |
Plumas County, CA | # 25 | 13 | 1.9 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.5 TWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Solano County, CA | # 19 | 40 | 3.0 TWh |
Orange County, CA | # 18 | 58 | 3.4 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Kings County, CA | # 16 | 54 | 3.7 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Monterey County, CA | # 14 | 29 | 4.4 TWh |
Santa Clara County, CA | # 13 | 73 | 4.6 TWh |
San Diego County, CA | # 12 | 148 | 5.2 TWh |
Sonoma County, CA | # 11 | 24 | 5.2 TWh |
Sacramento County, CA | # 10 | 63 | 6.6 TWh |
Shasta County, CA | # 9 | 46 | 7.0 TWh |
Fresno County, CA | # 8 | 104 | 8.4 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.6 TWh |
Contra Costa County, CA | # 5 | 50 | 13.9 TWh |
San Bernardino County, CA | # 4 | 196 | 14.3 TWh |
San Luis Obispo County, CA | # 3 | 20 | 20.7 TWh |
Los Angeles County, CA | # 2 | 290 | 21.2 TWh |
Kern County, CA | # 1 | 293 | 32.6 TWh |