Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 76.3 GWh | Oct 2022 | Jun 2024 | Solar |
Copco 1 | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 76.2 GWh | Dec 1917 | Dec 2023 | Water |
Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 76.0 GWh | Aug 2023 | Jun 2024 | Solar |
Torrance Refining Company, LLC | Torrance Refining Company, LLC | Torrance, CA | California Independent System Operator (CISO) | 75.3 GWh | Aug 1983 | Jun 2024 | Other Gas : 91.0% Waste Heat : 9.0% |
Carson Ice-Gen Project | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 75.1 GWh | Sep 1995 | Jun 2024 | Natural Gas : 99.9% |
Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 74.8 GWh | Dec 1995 | Jun 2024 | Natural Gas |
Elk Hills Cogen | California Resources Elk Hills LLC | Tupman, CA | California Independent System Operator (CISO) | 74.6 GWh | Oct 1994 | Jun 2024 | Natural Gas |
Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 74.2 GWh | Nov 2018 | Dec 2023 | Wind |
Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 73.9 GWh | Mar 2020 | Jun 2024 | Solar |
Nimbus | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 73.3 GWh | Apr 1955 | Dec 2023 | Water |
Coalinga 25D Cogen | Chevron USA Inc | Coalinga, CA | California Independent System Operator (CISO) | 72.8 GWh | Sep 1986 | Dec 2023 | Natural Gas |
Kiefer Landfill | Sacramento County of Dpt Waste | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 72.1 GWh | Nov 1999 | Dec 2023 | Landfill Gas |
CE Turbo LLC | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 72.0 GWh | Jun 2000 | Dec 2022 | Geothermal |
Sand Bar Power Plant | Tri-Dam Power Authority | Stanislaus Ntl. Fores, CA | California Independent System Operator (CISO) | 71.7 GWh | Apr 1986 | Dec 2022 | Water |
Mountain View III | Avangrid Renewables LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 71.6 GWh | Nov 2003 | Dec 2023 | Wind |
Robbs Peak | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 70.5 GWh | Sep 1965 | Dec 2023 | Water |
Mojave Siphon | California Dept. of Water Resources | Hesperia, CA | California Independent System Operator (CISO) | 70.1 GWh | Jul 1996 | Dec 2023 | Water |
San Francisquito 2 | Los Angeles Department of Water & Power | Saugus, CA | Los Angeles Department of Water and Power (LDWP) | 69.8 GWh | Jun 1920 | Dec 2023 | Water |
Wise | Pacific Gas & Electric Co. | Auburn, CA | California Independent System Operator (CISO) | 69.3 GWh | Feb 1917 | Dec 2023 | Water |
Kelly Ridge | South Feather Water and Power Agency | Oroville, CA | California Independent System Operator (CISO) | 68.9 GWh | Aug 1963 | Dec 2023 | Water |
Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 68.2 GWh | - | Jun 2024 | Solar |
Pine Tree Wind Power Project | Los Angeles Department of Water & Power | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 67.7 GWh | May 2009 | Dec 2023 | Wind |
Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 67.3 GWh | Jan 2013 | Dec 2023 | Solar |
Mammoth G2 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 66.9 GWh | Nov 1990 | Dec 2023 | Geothermal |
85 A | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 66.5 GWh | Dec 1984 | Dec 2023 | Wind |
Taft 26C Cogen | Chevron USA Inc | Taft, CA | California Independent System Operator (CISO) | 66.5 GWh | Jun 1982 | Jun 2024 | Natural Gas |
McKittrick Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 66.4 GWh | May 2012 | Dec 2023 | Natural Gas |
San Gorgonio Farms Wind Farm | San Gorgonio Farms Inc | Whitewater, CA | California Independent System Operator (CISO) | 65.2 GWh | Feb 1983 | Dec 2023 | Wind |
Citizens Imperial Solar | Citizens Enterprises Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 64.9 GWh | Jul 2019 | Jun 2024 | Solar |
Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 64.0 GWh | Mar 2016 | Dec 2023 | Landfill Gas |
Plant No 2 Orange County | Orange County Sanitation Dist | Huntington Beach, CA | California Independent System Operator (CISO) | 63.2 GWh | May 1993 | Dec 2023 | Other Biomass Gas : 77.7% Natural Gas : 22.3% |
Roseburg Forest Products Biomass | Roseburg Forest Products | Weed, CA | PacifiCorp West (PACW) | 62.6 GWh | Nov 1989 | Dec 2023 | Wood/Wood Waste Solids |
Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 62.1 GWh | Feb 1990 | Dec 2023 | Water |
Mammoth G1 | Ormat Nevada Inc | Mammoth lakes, CA | California Independent System Operator (CISO) | 61.7 GWh | Nov 1984 | Dec 2023 | Geothermal |
San Diego State University | San Diego State University | San Diego, CA | California Independent System Operator (CISO) | 61.2 GWh | Aug 2002 | Jun 2024 | Natural Gas : 97.5% Solar : 2.5% |
Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 61.0 GWh | Nov 2015 | Dec 2023 | Solar |
Sunray 2 | Sunray Energy 2, LLC | Daggett, CA | California Independent System Operator (CISO) | 59.1 GWh | Nov 1984 | Dec 2023 | Solar |
Cymric 36W Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 59.0 GWh | Sep 1982 | Dec 2023 | Natural Gas |
Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 58.9 GWh | Jun 1983 | Dec 2023 | Water |
Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 58.5 GWh | Mar 2016 | Dec 2023 | Solar |
Ampersand Chowchilla Biomass LLC | Ampersand Chowchilla Biomass LLC | Chowchilla, CA | California Independent System Operator (CISO) | 58.4 GWh | Apr 2008 | Dec 2022 | Wood/Wood Waste Solids : 99.8% |
Mojave 16/17/18 | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 58.1 GWh | Nov 1989 | Dec 2023 | Wind |
Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 58.1 GWh | Mar 2016 | Dec 2023 | Solar |
Castaic | Los Angeles Department of Water & Power | Castaic, CA | Los Angeles Department of Water and Power (LDWP) | 57.7 GWh | Dec 1971 | Jun 2024 | Water |
Phillips 66 Carbon Plant | Phillips 66 Company | Rodeo, CA | California Independent System Operator (CISO) | 57.5 GWh | Nov 1983 | Jun 2023 | Waste Heat |
Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 57.1 GWh | Dec 2015 | Dec 2022 | Solar |
Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 56.6 GWh | Feb 2017 | Dec 2022 | Solar |
Yuba City Energy Center | Calpine Corp-Yuba City | Yuba City, CA | California Independent System Operator (CISO) | 56.4 GWh | Jul 2002 | Dec 2023 | Natural Gas |
Axium Modesto Solar | Axium US Solar Holdings LLC | Modesto, CA | California Independent System Operator (CISO) | 56.3 GWh | Nov 2012 | Dec 2023 | Solar |
Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 56.0 GWh | Nov 2021 | Jun 2024 | Solar |
TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 56.0 GWh | Oct 2014 | Dec 2023 | Solar |
Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 55.6 GWh | Nov 2020 | Jun 2024 | Solar |
Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 55.2 GWh | Dec 2013 | Dec 2023 | Solar |
King City Power Plant | Calpine King City Cogen LLC | King City, CA | California Independent System Operator (CISO) | 54.7 GWh | Jan 1989 | Apr 2024 | Natural Gas |
Feather River Energy Center | Calpine Corp-Yuba City | Yuba City, CA | California Independent System Operator (CISO) | 54.7 GWh | Dec 2002 | Dec 2023 | Natural Gas |
White River Solar 2 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 54.3 GWh | Aug 2014 | Dec 2022 | Solar |
Riverside Energy Resource Center | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 54.0 GWh | May 2006 | Dec 2023 | Natural Gas |
Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 53.8 GWh | Nov 2015 | Nov 2023 | Solar |
Dome Project | Sentinel Peak Resources California, LLC | Fellows, CA | California Independent System Operator (CISO) | 53.7 GWh | Jul 1988 | Dec 2023 | Natural Gas |
SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 53.5 GWh | May 2016 | Dec 2023 | Solar |
RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 53.3 GWh | May 2013 | Dec 2023 | Solar |
Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 52.6 GWh | Aug 2015 | Dec 2022 | Solar |
Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 51.9 GWh | Nov 2014 | Dec 2023 | Solar |
Bishop Creek 4 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 51.7 GWh | Aug 1905 | Dec 2023 | Water |
Western Antelope Blue Sky B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2023 | Solar |
NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 51.6 GWh | Feb 2017 | Dec 2022 | Solar |
De Sabla | Pacific Gas & Electric Co. | Magalia, CA | California Independent System Operator (CISO) | 51.4 GWh | Jan 1963 | Dec 2023 | Water |
RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 51.4 GWh | Dec 2013 | Dec 2023 | Solar |
Corcoran Solar 3 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 51.4 GWh | Jan 2016 | Dec 2023 | Solar |
Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 51.3 GWh | Apr 2015 | Dec 2022 | Solar |
Midway Solar Farm III | Greenbacker Renewable Energy Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 50.9 GWh | Aug 2018 | Dec 2023 | Solar |
Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 50.8 GWh | Nov 2017 | Dec 2022 | Solar |
Rising Tree Wind Farm II | Rising Tree Wind Farm II LLC | Mojave, CA | California Independent System Operator (CISO) | 50.6 GWh | Dec 2014 | Dec 2023 | Wind |
White River Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 50.4 GWh | Jun 2013 | Dec 2022 | Solar |
Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 50.4 GWh | Aug 2021 | Dec 2023 | Solar |
Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 50.3 GWh | Jul 2012 | Dec 2022 | Natural Gas |
Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 50.3 GWh | Jun 2010 | Dec 2023 | Landfill Gas |
Loma Linda University Cogen | Loma Linda University | Loma Linda, CA | California Independent System Operator (CISO) | 50.3 GWh | Jan 1980 | Jun 2024 | Natural Gas |
Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 50.0 GWh | Nov 2016 | Dec 2023 | Solar |
RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 49.9 GWh | Aug 2016 | Dec 2023 | Solar |
Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 49.7 GWh | Feb 2015 | Dec 2023 | Solar |
Blacksand Generating Facility | Bridge Energy LLC | Brea, CA | California Independent System Operator (CISO) | 49.7 GWh | May 2000 | Dec 2023 | Natural Gas |
CED Ducor 1 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 49.6 GWh | Nov 2016 | Dec 2023 | Solar |
Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.5 GWh | Nov 2017 | Dec 2023 | Solar |
CED Ducor 2 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 49.1 GWh | Nov 2016 | Dec 2023 | Solar |
Coalinga Cogeneration Facility | Aera Energy LLC-Coalinga | Coalinga, CA | California Independent System Operator (CISO) | 49.1 GWh | May 1988 | Dec 2023 | Natural Gas |
Dutch Flat 2 | Nevada Irrigation District | Dutch Flat, CA | California Independent System Operator (CISO) | 49.0 GWh | Oct 1965 | Dec 2023 | Water |
Corcoran Solar 2 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 48.9 GWh | Apr 2015 | Dec 2023 | Solar |
CED Ducor 4 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 48.8 GWh | Nov 2016 | Dec 2023 | Solar |
Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 48.4 GWh | Nov 2016 | Dec 2023 | Solar |
Atwell Island West Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 48.4 GWh | Apr 2015 | Dec 2023 | Solar |
Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 48.2 GWh | Mar 2021 | Dec 2023 | Wind |
MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 48.1 GWh | Jan 2003 | Dec 2023 | Natural Gas |
Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.9 GWh | Jul 2016 | Dec 2023 | Solar |
Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.9 GWh | Oct 2022 | Dec 2023 | Solar |
El Nido Facility | Merced Power LLC | El Nido, CA | California Independent System Operator (CISO) | 47.8 GWh | Jul 2008 | Feb 2023 | Wood/Wood Waste Solids : 99.8% |
Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.6 GWh | Nov 2017 | Dec 2023 | Solar |
Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 47.5 GWh | Apr 2015 | Dec 2023 | Solar |
TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 47.3 GWh | Feb 2013 | Dec 2023 | Solar |
Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.0 GWh | Nov 2017 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 283 | 36.2 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 25 | 1.5 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |