Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Starbucks - Evolution Fresh | Bloom Energy | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 4.7 GWh | May 2014 | Dec 2023 | Natural Gas |
D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.7 GWh | Feb 2019 | Dec 2022 | Solar |
Stony Gorge | City of Santa Clara - (CA) | Elk Creek, CA | California Independent System Operator (CISO) | 4.6 GWh | Mar 1986 | Dec 2022 | Water |
Valencia 1 Solar CA | Altus Power America Management, LLC | Westmorland, CA | Imperial Irrigation District (IID) | 4.6 GWh | Aug 2017 | Dec 2023 | Solar |
Regional Wastewater Control Facility | City of Stockton MUD | Stockton, CA | California Independent System Operator (CISO) | 4.6 GWh | Oct 2000 | Dec 2023 | Other Biomass Gas : 97.5% Natural Gas : 2.4% |
Roseville Power Plant #2 | City of Roseville - (CA) | Rocklin, CA | Balancing Authority of Northern California (BANC) | 4.6 GWh | Mar 1986 | Dec 2023 | Natural Gas : 99.9% |
Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2022 | Dec 2023 | Solar : 88.9% Electricity used for energy storage : 11.1% |
City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2014 | Dec 2023 | Wind |
Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2020 | Dec 2023 | Solar |
Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 4.5 GWh | Aug 2013 | Dec 2023 | Natural Gas |
Coram Tehachapi | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 4.5 GWh | Aug 1992 | Dec 2023 | Wind |
Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2017 | Dec 2023 | Wind |
Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2021 | Dec 2023 | Solar |
DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2014 | Dec 2023 | Solar |
Navajo Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2013 | Dec 2023 | Solar |
Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 4.4 GWh | Oct 2001 | Jun 2024 | Natural Gas |
Industry Solar Power Generation Station 1 LLC | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2013 | Dec 2023 | Solar |
Grapeland Hybrid | Southern California Edison Co | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 4.3 GWh | Aug 2007 | Dec 2023 | Natural Gas |
Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2014 | Dec 2023 | Solar |
Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 4.3 GWh | Mar 2020 | Dec 2023 | Solar |
Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.3 GWh | Sep 2013 | Dec 2023 | Solar |
Bodega Avenue Solar LLC | Bodega Avenue Solar LLC | Petaluma, CA | California Independent System Operator (CISO) | 4.3 GWh | Dec 2020 | Dec 2023 | Solar |
Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 4.2 GWh | Aug 2017 | Dec 2023 | Wind |
Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2014 | Dec 2023 | Solar |
Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.2 GWh | Apr 2014 | Dec 2023 | Solar |
Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 4.2 GWh | Jul 1974 | Dec 2023 | Natural Gas |
Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 4.2 GWh | Oct 2014 | Dec 2023 | Wind |
Parker | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 4.2 GWh | Mar 1982 | Oct 2023 | Water |
IGS SBD2 | Greenbacker Renewable Energy Corporation | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.2 GWh | Jan 2023 | Dec 2023 | Solar |
Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 4.2 GWh | Mar 2013 | Dec 2023 | Solar |
Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2023 | Solar |
Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 4.2 GWh | Aug 2018 | Dec 2023 | Solar |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2021 | Dec 2023 | Solar |
East Portal Generator | Calleguas Mun Water District | Chatsworth, CA | California Independent System Operator (CISO) | 4.1 GWh | Dec 1986 | Dec 2023 | Water |
DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 2021 | Dec 2023 | Solar |
Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2018 | Dec 2023 | Solar |
Powhatan Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2013 | Dec 2023 | Solar |
Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 2014 | Dec 2023 | Solar |
Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 4.1 GWh | Oct 2011 | Dec 2023 | Natural Gas |
Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.1 GWh | Sep 2015 | Dec 2023 | Solar |
Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.1 GWh | Mar 2014 | Dec 2023 | Solar |
Bear Creek Solar | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 4.0 GWh | Jan 2014 | Dec 2023 | Solar |
San Dimas | Metropolitan Water District of S CA | San Dimas, CA | California Independent System Operator (CISO) | 4.0 GWh | May 1981 | Dec 2022 | Water |
Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2023 | Solar |
SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2020 | Dec 2022 | Solar : 99.9% |
EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2021 | Dec 2022 | Solar |
Wonderful Huller & Shellling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2021 | Dec 2023 | Solar |
Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2014 | Jun 2024 | Wind |
SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 4.0 GWh | Sep 2018 | Dec 2023 | Solar |
AT&T San Diego | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 4.0 GWh | Feb 2015 | Dec 2023 | Natural Gas |
CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2023 | Solar |
SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2014 | Dec 2023 | Solar |
Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2014 | Dec 2023 | Solar |
Aerojet II | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | May 2010 | Dec 2023 | Solar |
Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2009 | Dec 2023 | Solar |
Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.9 GWh | Apr 2015 | Dec 2023 | Solar |
Solar Photovoltaic Project #48 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2015 | Apr 2023 | Solar |
Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2020 | Dec 2022 | Solar |
Westmont 400A | Westmont Solar, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2022 | Solar |
Westmont 400B | Westmont Solar, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2022 | Solar |
Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2023 | Solar |
Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 2019 | Dec 2023 | Solar |
Victor Mesa Linda E2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2023 | Solar |
Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 2020 | Dec 2022 | Solar |
Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.8 GWh | Jul 2017 | Dec 2023 | Solar |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2013 | Dec 2023 | Solar |
Valley Center | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2016 | Dec 2023 | Solar |
CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.7 GWh | Apr 2023 | Dec 2023 | Solar |
Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2012 | Dec 2023 | Wind |
Angels | Utica Water & Power Authority | Angels Camp, CA | California Independent System Operator (CISO) | 3.7 GWh | Dec 1939 | Dec 2022 | Water |
CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2013 | Dec 2023 | Solar |
Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2014 | Dec 2023 | Solar |
Adapture CA2, LLC | Adapture Renewables, Inc. | Orland, CA | PacifiCorp West (PACW) | 3.7 GWh | Feb 2016 | Dec 2022 | Solar |
Otoe Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2013 | Dec 2023 | Solar |
Rodeo Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2023 | Solar |
Solar Star California II LLC | Solar Star California II LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.6 GWh | Jul 2012 | Dec 2023 | Solar |
Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2023 | Solar |
Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2008 | Dec 2023 | Solar |
UC Santa Cruz Solar | Forefront Power, LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2022 | Solar |
Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2023 | Solar |
SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2023 | Solar |
Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.6 GWh | Jan 2017 | Dec 2023 | Solar |
Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2023 | Solar |
Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.6 GWh | Dec 2014 | Dec 2023 | Solar |
CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 3.5 GWh | Nov 2018 | Dec 2022 | Solar |
El Dorado Solar, LLC | Greenbacker Renewable Energy Corporation | El Dorado Hills, CA | California Independent System Operator (CISO) | 3.5 GWh | Mar 2021 | Dec 2023 | Solar |
Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 3.5 GWh | May 2002 | Jun 2024 | Natural Gas |
Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | May 2014 | Dec 2023 | Solar |
Vallecitos Water District | SSA Solar of CA 5, LLC | San Marcos, CA | California Independent System Operator (CISO) | 3.5 GWh | Aug 2021 | Dec 2023 | Solar |
Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.5 GWh | Sep 2021 | Dec 2023 | Solar |
SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2023 | Solar |
Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2018 | Dec 2023 | Solar |
Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.5 GWh | Dec 2014 | Dec 2023 | Solar |
Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.5 GWh | Jul 2016 | Dec 2023 | Solar |
Solar Photovoltaic Project #11 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2015 | Apr 2023 | Solar |
Isabella Hydro Project | Isabella Partners | Lake Isabella, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 1990 | Mar 2023 | Water |
Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 3.4 GWh | Jun 2014 | Dec 2023 | Solar |
Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.4 GWh | Jun 2013 | Dec 2022 | Solar |
Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2016 | Dec 2022 | Solar |
Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2012 | Dec 2023 | Wind |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 283 | 36.2 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 25 | 1.5 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |