CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.7 GWh | Apr 2023 | Dec 2023 | Solar |
CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2022 | Dec 2023 | Solar |
Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2022 | Dec 2023 | Solar |
Google Moffett Park Solar Project | Google, Inc. | Sunnyvale, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 2021 | Dec 2022 | Solar |
Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2022 | Solar |
CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 462.0 MWh | Aug 2023 | Dec 2023 | Solar |
BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2021 | Dec 2022 | Solar |
Niagara Bottling - Rialto | SkyHigh 2 Solar | Rialto, CA | California Independent System Operator (CISO) | 8.6 GWh | Nov 2021 | Dec 2022 | Solar |
Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 376.5 GWh | Oct 2022 | Jun 2024 | Solar |
Sierra Pacific Chinese Camp | Sierra Pacific Industries | Chinese Camp, CA | California Independent System Operator (CISO) | 5.2 GWh | Feb 2022 | Dec 2023 | Solar |
Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 171.1 GWh | Nov 2022 | Jun 2024 | Solar |
Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 76.3 GWh | Oct 2022 | Jun 2024 | Solar |
POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 358.2 MWh | Jun 2021 | Dec 2023 | Solar |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2021 | Dec 2023 | Solar |
Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 393.1 GWh | Aug 2023 | Jun 2024 | Solar |
Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 410.5 GWh | Aug 2023 | Jun 2024 | Solar |
Canal Energy S23, LLC | Canal Energy S23, LLC | Hanford, CA | California Independent System Operator (CISO) | 7.7 GWh | Nov 2021 | Dec 2022 | Solar |
Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 181.6 GWh | - | Jun 2024 | Solar |
Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.7 GWh | Jul 2021 | Dec 2023 | Solar |
OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.1 GWh | Dec 2018 | Dec 2023 | Solar |
Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 2019 | Dec 2023 | Solar |
Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2018 | Dec 2023 | Solar |
Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 4.2 GWh | Aug 2018 | Dec 2023 | Solar |
Wonderful Huller & Shellling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2021 | Dec 2023 | Solar |
Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 50.4 GWh | Aug 2021 | Dec 2023 | Solar |
8500 Balboa PV, LLC | 8500 Balboa PV, LLC | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 5.2 GWh | Jan 2022 | Dec 2022 | Solar |
Danell Bros Inc | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 6.1 GWh | Aug 2021 | Dec 2023 | Solar |
CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 280.2 GWh | - | Jun 2024 | Solar |
Bodega Avenue Solar LLC | Bodega Avenue Solar LLC | Petaluma, CA | California Independent System Operator (CISO) | 4.3 GWh | Dec 2020 | Dec 2023 | Solar |
Rancho Cordova Medical Offices | KP Rancho Cordova Medical Offices Solar, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Mar 2021 | Dec 2023 | Solar |
Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2021 | Dec 2022 | Solar |
Gilead Foster City Solar Project | Gilead Sciences Inc. Foster City | Foster City, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2021 | Dec 2022 | Solar |
CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2022 | Dec 2023 | Solar |
Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 9.0 GWh | Oct 2021 | Dec 2022 | Solar |
Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 2.0 MWh | Apr 2022 | Dec 2022 | Solar |
Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 9.5 GWh | Aug 2022 | Dec 2023 | Solar |
Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 82.9 GWh | - | Jun 2024 | Solar |
Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2023 | Solar |
Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2018 | Dec 2023 | Solar |
Resurgence Solar II | Resurgence Solar II | Boron, CA | California Independent System Operator (CISO) | 110.2 GWh | Jul 2023 | Jun 2024 | Solar |
City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 1.2 GWh | Apr 2023 | Dec 2023 | Solar |
Lockhart Solar PV II | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 185.2 GWh | Jun 2023 | Jun 2024 | Solar |
Wheeler Ridge | AFTW Holdings, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.4 GWh | Aug 2023 | Dec 2023 | Solar |
Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 932.0 MWh | Oct 2023 | Dec 2023 | Solar |
Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2021 | Dec 2023 | Solar |
Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 43.0 GWh | Nov 2023 | Jun 2024 | Solar |
Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2023 | Solar |
Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2022 | Dec 2023 | Solar |
Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2023 | Solar |
Renew Solar VMC LLC | Renew Solar VMC LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2023 | Dec 2023 | Solar |
SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 107.0 MWh | Nov 2023 | Dec 2023 | Solar |
Scooby Solar, LLC | Scooby Solar, LLC | Famoso, CA | California Independent System Operator (CISO) | 927.0 MWh | Sep 2023 | Dec 2023 | Solar |
Sunny Cow Solar, LLC | Sunny Cow Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 847.0 MWh | Sep 2023 | Dec 2023 | Solar |
Exeter Bulk Plant Array | Exeter Bulk Plant | Exeter, CA | California Independent System Operator (CISO) | 1.6 GWh | Dec 2014 | Dec 2023 | Solar |
Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 23.3 GWh | Nov 2016 | Dec 2023 | Solar |
Putah Creek Solar Farm North | Putah Creek Solar Farms LLC | Winters, CA | California Independent System Operator (CISO) | 5.2 GWh | Sep 2022 | Dec 2022 | Solar |
Dover Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 2.9 GWh | Apr 2022 | Dec 2023 | Solar |
Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2021 | Dec 2023 | Solar |
Wonderful Nursery | Wonderful Renewable Energy, LLC. | Wasco, CA | California Independent System Operator (CISO) | 5.5 GWh | Jun 2021 | Dec 2023 | Solar |
20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Jun 2022 | Dec 2022 | Solar |
Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 76.0 GWh | Aug 2023 | Jun 2024 | Solar |
Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 28.6 GWh | Oct 2022 | Dec 2023 | Solar |
Sheep Creek Community Solar Farm | Phelan Solar LLC | El Mirage, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
IGS SBD1 | Greenbacker Renewable Energy Corporation | Bloomington, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Jan 2023 | Dec 2023 | Solar |
IGS SBD2 | Greenbacker Renewable Energy Corporation | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.2 GWh | Jan 2023 | Dec 2023 | Solar |
Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Aug 2018 | Dec 2022 | Solar |
POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2023 | Solar |
POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 292.0 MWh | Nov 2021 | Dec 2023 | Solar |
Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2022 | Dec 2023 | Solar |
Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 68.2 GWh | - | Jun 2024 | Solar |
Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.6 GWh | Jul 2022 | Dec 2023 | Solar |
Wonderful Kings | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2022 | Dec 2023 | Solar |
Blue Skies Solar, LLC | Blue Skies Solar, LLC | Arvin, CA | PacifiCorp West (PACW) | 239.0 MWh | Nov 2021 | Dec 2022 | Solar |
Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2023 | Solar |
Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 209.9 GWh | Jul 2023 | Jun 2024 | Solar |
El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 3.3 GWh | Feb 2021 | Dec 2022 | Solar |
California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2021 | Dec 2022 | Solar |
EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2021 | Dec 2022 | Solar |
Big Bear | Los Palos Street Operating, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 9.2 GWh | Nov 2020 | Dec 2022 | Solar |
Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2023 | Solar |
Vallecitos Water District | SSA Solar of CA 5, LLC | San Marcos, CA | California Independent System Operator (CISO) | 3.5 GWh | Aug 2021 | Dec 2023 | Solar |
Valencia 3 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 8.6 GWh | Mar 2021 | Dec 2023 | Solar |
Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 13.3 GWh | Oct 2022 | Dec 2023 | Solar |
Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 557.6 GWh | Feb 2022 | Jun 2024 | Solar |
CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2021 | Dec 2022 | Solar |
Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 4.3 GWh | Mar 2020 | Dec 2023 | Solar |
CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.5 GWh | Jan 2020 | Dec 2023 | Solar |
Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 18.9 GWh | Nov 2019 | Dec 2023 | Solar |
Calipatria State Prison | Ecoplexus, Inc | Calipatria, CA | Imperial Irrigation District (IID) | 18.5 GWh | Nov 2019 | Dec 2023 | Solar |
Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2020 | Dec 2023 | Solar |
Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 294.1 GWh | Jul 2022 | Jun 2024 | Solar |
Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2014 | Dec 2023 | Solar |
Prologis L.P | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2018 | Dec 2023 | Solar |
ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2021 | Dec 2023 | Solar |
Wonderful Orchards - New Columbia | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 9.8 GWh | Aug 2020 | Dec 2023 | Solar |
Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 127.3 GWh | Nov 2020 | Jun 2024 | Solar |
Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 263.7 GWh | Nov 2020 | Jun 2024 | Solar |
Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 363.0 GWh | Nov 2021 | Jun 2024 | Solar |
Fifth Standard Solar PV, LLC (Hybrid) | RWE Renewables Americas, LLC | Huron, CA | California Independent System Operator (CISO) | 241.9 GWh | Aug 2023 | Jun 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2022 generation numbers.County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |