Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 12.2 GWh | Nov 2016 | Dec 2023 | Natural Gas |
Taylor Farms - Schilling Place | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 7.2 GWh | Jun 2019 | Dec 2023 | Natural Gas |
Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 10.0 GWh | May 2021 | Dec 2023 | Natural Gas |
Anheuser Busch - Fairfield | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 22.3 GWh | Nov 2022 | Dec 2023 | Natural Gas |
Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 8.3 GWh | Nov 2018 | Dec 2023 | Natural Gas |
Kaiser - Woodland Hills | Bloom Energy | Woodland Hills, CA | California Independent System Operator (CISO) | 21.7 GWh | Aug 2019 | Dec 2022 | Natural Gas |
Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 36.1 GWh | May 2020 | Dec 2022 | Natural Gas |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2020 | Dec 2022 | Natural Gas |
San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 7.8 GWh | Feb 2020 | Dec 2022 | Natural Gas |
Kaiser - Harbor City | Bloom Energy | Harbor City, CA | California Independent System Operator (CISO) | 17.5 GWh | Nov 2019 | Dec 2022 | Natural Gas |
MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 48.1 GWh | Jan 2003 | Dec 2023 | Natural Gas |
Carlsbad Energy Center | NRG California Peaker Operations LLC | Carlsbad, CA | California Independent System Operator (CISO) | 296.1 GWh | Nov 2018 | Jun 2024 | Natural Gas |
Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 2.4 GWh | Jun 2020 | Jun 2024 | Natural Gas |
P Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 34.7 GWh | Feb 2007 | Jun 2024 | Natural Gas |
Pixar - Emeryville | Bloom Energy | Emeryville, CA | California Independent System Operator (CISO) | 7.8 GWh | Dec 2013 | Dec 2023 | Natural Gas |
Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.3 GWh | Jul 2014 | Dec 2023 | Natural Gas |
Amazon San Bernardino | Bloom Energy | San Bernardino, CA | California Independent System Operator (CISO) | 6.6 GWh | Oct 2014 | Dec 2022 | Natural Gas |
Central CA Fuel Cell 1 | Central CA Fuel Cell 1 | Tulare, CA | California Independent System Operator (CISO) | 20.0 GWh | Apr 2018 | Dec 2023 | Natural Gas |
Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 259.1 GWh | Oct 2017 | Dec 2023 | Natural Gas |
Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.6 GWh | Aug 2017 | Dec 2023 | Natural Gas |
W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 36.1 GWh | Jun 2005 | Jun 2024 | Natural Gas |
Q Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 27.5 GWh | Jun 2013 | Jul 2023 | Natural Gas |
Starbucks - Evolution Fresh | Bloom Energy | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 4.7 GWh | May 2014 | Dec 2023 | Natural Gas |
Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 9.5 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.6 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 31.4 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Kaiser Napa Valley Corporate Dr Fuel Cell | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 41.4 GWh | May 2017 | Dec 2023 | Natural Gas |
Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 8.4 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 11.6 GWh | Mar 2017 | Dec 2023 | Natural Gas |
AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 2.5 TWh | Jan 2020 | Jun 2024 | Natural Gas |
Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 41.7 GWh | Nov 2017 | Dec 2023 | Natural Gas |
EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 23.4 GWh | Aug 2018 | Dec 2023 | Natural Gas |
Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.7 GWh | Apr 2019 | Dec 2023 | Natural Gas |
ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 2019 | Dec 2023 | Natural Gas |
ATT Ventura Blvd | Bloom Energy | Sherman Oaks, CA | Los Angeles Department of Water and Power (LDWP) | 8.1 GWh | Oct 2019 | Dec 2023 | Natural Gas |
Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 9.3 GWh | Feb 2019 | Dec 2023 | Natural Gas |
Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 17.8 GWh | Feb 2019 | Dec 2023 | Natural Gas |
AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2018 | Dec 2023 | Natural Gas |
CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 9.1 GWh | Dec 2018 | Dec 2023 | Natural Gas |
EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 18.3 GWh | Aug 2019 | Dec 2023 | Natural Gas |
Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 18.0 GWh | Aug 2017 | Dec 2023 | Natural Gas |
EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 31.9 GWh | Dec 2017 | Dec 2023 | Natural Gas |
JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2019 | Dec 2023 | Natural Gas |
KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 15.7 GWh | Mar 2018 | Dec 2023 | Natural Gas |
GEN005 Antibody Fuel Cell | 2016 ESA Project Company, LLC | Oceanside, CA | California Independent System Operator (CISO) | 18.0 GWh | Mar 2019 | Dec 2023 | Natural Gas |
SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2018 | Dec 2023 | Natural Gas |
KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 6.3 GWh | Apr 2018 | Dec 2023 | Natural Gas |
TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 10.2 GWh | Aug 2018 | Dec 2023 | Natural Gas |
Yahoo! - HQ | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 4.8 GWh | Jun 2014 | Dec 2023 | Natural Gas |
AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2013 | Dec 2023 | Natural Gas |
Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 39.4 GWh | Nov 2017 | Dec 2023 | Natural Gas |
AT&T San Diego | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 4.0 GWh | Feb 2015 | Dec 2023 | Natural Gas |
CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 6.2 GWh | Feb 2016 | Dec 2023 | Natural Gas |
SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.8 GWh | Feb 2014 | Dec 2023 | Natural Gas |
Keysight - Santa Rosa | Bloom Energy | Santa Rosa, CA | California Independent System Operator (CISO) | 37.7 GWh | Aug 2018 | Dec 2023 | Natural Gas |
DirecTV - Los Angeles | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 7.7 GWh | Sep 2016 | Dec 2023 | Natural Gas |
CalTech - Pasadena | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 7.5 GWh | Feb 2016 | Dec 2023 | Natural Gas |
Beckton Dickenson - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.5 GWh | Jun 2016 | Dec 2023 | Natural Gas |
AT&T - Redwood City | Bloom Energy | Redwood City, CA | California Independent System Operator (CISO) | 7.6 GWh | Feb 2013 | Dec 2023 | Natural Gas |
University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2016 | Dec 2023 | Natural Gas |
AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 6.3 GWh | Sep 2016 | Dec 2023 | Natural Gas |
AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 7.8 GWh | Oct 2016 | Dec 2023 | Natural Gas |
Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 14.9 GWh | May 2021 | Dec 2023 | Natural Gas |
Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 8.5 GWh | Aug 2021 | Dec 2023 | Natural Gas |
Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 78.8 GWh | Oct 2017 | Dec 2023 | Natural Gas |
AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 2.6 TWh | Jan 2020 | Jun 2024 | Natural Gas |
AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 7.1 GWh | Feb 2016 | Dec 2023 | Natural Gas |
CalTech - Pasadena Wilson Ave | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2019 | Dec 2023 | Natural Gas |
Intel Santa Clara | Bloom Energy | Santa Clara, CA | California Independent System Operator (CISO) | 8.0 GWh | Dec 2014 | Dec 2023 | Natural Gas |
APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 29.4 GWh | Apr 2017 | Dec 2023 | Natural Gas |
FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 9.4 GWh | Jan 2017 | Dec 2023 | Natural Gas |
ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.9 GWh | Jun 2017 | Dec 2023 | Natural Gas |
ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 7.6 GWh | Mar 2017 | Dec 2023 | Natural Gas |
Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 8.2 GWh | Feb 2017 | Dec 2023 | Natural Gas |
Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.3 GWh | Oct 2015 | Dec 2023 | Natural Gas |
Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 4.5 GWh | Aug 2013 | Dec 2023 | Natural Gas |
Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.8 GWh | Feb 2013 | Dec 2023 | Natural Gas |
Verizon-Torrance | Bloom Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 6.2 GWh | Nov 2013 | Dec 2023 | Natural Gas |
Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 15.1 GWh | Jun 2018 | Dec 2023 | Natural Gas |
Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 27.9 GWh | Aug 2019 | Dec 2023 | Natural Gas |
MM West Covina | MM West Covina Energy LLC | West Covina, CA | California Independent System Operator (CISO) | 43.3 GWh | May 1993 | Dec 2023 | Landfill Gas : 99.4% Natural Gas : 0.6% |
MM San Diego-Miramar | MM San Diego Energy-Miramar | San Diego, CA | California Independent System Operator (CISO) | 39.6 GWh | Jun 1997 | Dec 2023 | Landfill Gas : 90.2% Other Biomass Gas : 9.8% |
North City - Landfill Gas Engines South | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 3.1 GWh | Feb 1999 | Dec 2022 | Landfill Gas : 89.5% Natural Gas : 10.5% |
Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 34.2 GWh | Feb 2013 | Dec 2023 | Landfill Gas |
Nove Power Plant | Nove Investments I LLC | Richmond, CA | California Independent System Operator (CISO) | 172.4 MWh | Nov 1985 | Dec 2022 | Landfill Gas |
Altamont Gas Recovery | WM Renewable Energy LLC | Livermore, CA | California Independent System Operator (CISO) | 42.1 GWh | Feb 1969 | Dec 2023 | Landfill Gas |
Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 120.7 GWh | Jul 2014 | Jun 2024 | Landfill Gas |
Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 17.2 GWh | Jan 2013 | Dec 2023 | Landfill Gas |
Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 30.7 GWh | Jun 2009 | Dec 2023 | Landfill Gas |
Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 33.0 GWh | Mar 2014 | Dec 2023 | Landfill Gas |
Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 34.6 GWh | Jan 2014 | Dec 2023 | Landfill Gas |
Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 91.9 GWh | Nov 2008 | Jun 2024 | Landfill Gas |
Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 36.0 GWh | Oct 2010 | Dec 2023 | Landfill Gas |
Toyon Power Station | Toyon Landfill Gas Conversion, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Dec 1985 | Dec 2023 | Landfill Gas |
Marina Landfill Gas | Monterey Regional Waste Mgmt | Marina, CA | California Independent System Operator (CISO) | 36.9 GWh | Mar 1998 | Dec 2023 | Landfill Gas |
Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 8.9 GWh | Jun 1993 | Dec 2023 | Landfill Gas |
Sonoma Central Landfill Phase II | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 7.4 GWh | May 1996 | Dec 2023 | Landfill Gas |
Kiefer Landfill | Sacramento County of Dpt Waste | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 72.1 GWh | Nov 1999 | Dec 2023 | Landfill Gas |
Brea Expansion Plant | Brea Power II | Brea, CA | California Independent System Operator (CISO) | 265.8 GWh | Oct 2012 | Jun 2024 | Landfill Gas |
Puente Hills Energy Recovery | Los Angeles County Sanitation | Whittier, CA | California Independent System Operator (CISO) | 175.3 GWh | Sep 1986 | Jun 2024 | Landfill Gas |
Browse Power Plants By California Counties
Figures are based on December 2022 generation numbers.County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |