Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Solar Photovoltaic Project #27 | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 952.3 MWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #26 | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 5.0 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #22 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 363.5 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #23 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.3 GWh | Dec 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #18 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.2 GWh | Oct 2012 | Mar 2023 | Solar |
Solar Photovoltaic Project #17 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 2.9 GWh | Dec 2014 | Apr 2023 | Solar |
Solar Photovoltaic Project #16 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2015 | Mar 2023 | Solar |
Solar Photovoltaic Project #15 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.6 GWh | Dec 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #13 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 2.2 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #11 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2015 | Apr 2023 | Solar |
Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.1 GWh | May 2012 | Dec 2023 | Solar |
Solar Photovoltaic Project #10 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 844.4 MWh | Dec 2012 | Mar 2023 | Solar |
Solar Gen 2 Solar Facility | Southern Power Co | Calipatria, CA | California Independent System Operator (CISO) | 393.3 GWh | Oct 2014 | Dec 2023 | Solar |
IKEA Tejon 345 | IKEA Property Inc | Lebec, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2011 | Dec 2023 | Solar |
Alpaugh 50 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 76.4 GWh | Nov 2012 | Dec 2023 | Solar |
FAA NorCal TRACON | Enfinity NorCal 1 FAA LLC | Mather AFB, CA | Balancing Authority of Northern California (BANC) | 1.3 GWh | Nov 2012 | Dec 2023 | Solar |
Venable Solar 1 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2015 | Dec 2022 | Solar |
Venable Solar 2 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2015 | Dec 2022 | Solar |
Oltmans SCE at Jurupa | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2013 | Dec 2023 | Solar |
Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 55.2 GWh | Dec 2013 | Dec 2023 | Solar |
Alpaugh North | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 24.3 GWh | Nov 2012 | Dec 2023 | Solar |
Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 714.7 GWh | Oct 2013 | Dec 2022 | Solar |
Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2010 | Dec 2023 | Solar |
Butte College Main Campus Solar | Butte-Glenn Community College District | Oroville, CA | California Independent System Operator (CISO) | 7.0 GWh | Jun 2011 | Dec 2023 | Solar |
Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2013 | Dec 2023 | Solar |
Desert Green Solar Farm LLC | Invenergy Services LLC | Boulevard, CA | California Independent System Operator (CISO) | 9.1 GWh | Oct 2014 | Dec 2023 | Solar |
Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 2014 | Dec 2023 | Solar |
Oltmans SCE at Champagne | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2013 | Dec 2023 | Solar |
Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.4 GWh | Dec 2013 | Dec 2023 | Solar |
Solar Star California II LLC | Solar Star California II LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.6 GWh | Jul 2012 | Dec 2023 | Solar |
Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 2013 | Dec 2023 | Solar |
Industry Solar Power Generation Station 1 LLC | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2013 | Dec 2023 | Solar |
Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2013 | Dec 2023 | Solar |
Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2023 | Solar |
Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.4 GWh | Jun 2013 | Dec 2022 | Solar |
San Antonio West Solar Rooftop | SS San Antonio West LLC | Chino, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2012 | Dec 2023 | Solar |
Solar Photovoltaic Project #48 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2015 | Apr 2023 | Solar |
Improvement Dst No. 4 | Kern County Water Agency | Bakersfield, CA | California Independent System Operator (CISO) | 30.1 MWh | Dec 2008 | Dec 2022 | Solar |
Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 38.6 GWh | May 2013 | Dec 2023 | Solar |
Guernsey Solar Station | Pacific Gas & Electric Co. | Hanford, CA | California Independent System Operator (CISO) | 25.5 GWh | Jul 2013 | Dec 2023 | Solar |
Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.1 GWh | Aug 2010 | Dec 2022 | Solar |
Newberry Solar 1 LLC | Newberry Solar 1 LLC | Newberry Springs, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2013 | Dec 2022 | Solar |
RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 41.3 GWh | Nov 2013 | Dec 2023 | Solar |
Grassland 3&4 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2013 | Nov 2023 | Solar |
West Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 21.1 GWh | Apr 2013 | Dec 2023 | Solar |
TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 47.3 GWh | Feb 2013 | Dec 2023 | Solar |
RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 53.3 GWh | May 2013 | Dec 2023 | Solar |
Depot Park Solar System | Depot Park Solar Farm | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.5 GWh | Nov 2010 | Dec 2023 | Solar |
La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 96.6 MWh | Nov 2012 | Oct 2023 | Solar |
Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 562.6 MWh | Nov 2011 | Dec 2023 | Solar |
Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 6.2 GWh | Nov 2014 | Dec 2023 | Solar |
Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 450.0 GWh | Oct 2013 | Dec 2022 | Solar |
Community Solar 1 | Community Solar I | Brawley, CA | Imperial Irrigation District (IID) | 13.9 GWh | May 2014 | Dec 2023 | Solar |
Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 2.0 GWh | Sep 2011 | Jul 2023 | Solar |
Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2013 | Dec 2022 | Solar |
Navajo Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2013 | Dec 2023 | Solar |
SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 25.4 GWh | May 2013 | Dec 2023 | Solar |
Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2013 | Dec 2023 | Solar |
Intel Folsom | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Jun 2010 | Dec 2023 | Solar |
Tahquitz High School | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2012 | Dec 2023 | Solar |
Edwards Air Force Base | CleanCapital Holdings | Edwards, CA | California Independent System Operator (CISO) | 866.0 MWh | Nov 2011 | Dec 2023 | Solar |
SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2012 | Dec 2022 | Solar |
SEPV 1 | CVI CleanCapital Solar 1 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.1 GWh | Apr 2012 | Dec 2023 | Solar |
Imperial Valley Solar Company 1 LLC | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 34.1 GWh | May 2012 | Dec 2023 | Solar |
SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 34.1 GWh | May 2013 | Dec 2023 | Solar |
West Valley High School Solar | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2012 | Dec 2023 | Solar |
Pierce College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Dec 2012 | Dec 2023 | Solar |
Axium Modesto Solar | Axium US Solar Holdings LLC | Modesto, CA | California Independent System Operator (CISO) | 56.3 GWh | Nov 2012 | Dec 2023 | Solar |
Nickel 1 Solar Facility | Altus Power America Management, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 2.9 GWh | Oct 2012 | Dec 2023 | Solar |
Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.8 GWh | May 2015 | Dec 2023 | Solar |
Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 758.7 GWh | Feb 2014 | Jun 2024 | Solar |
RE Kammerer 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.7 GWh | Jan 2012 | Dec 2023 | Solar |
RE Dillard 2 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.5 GWh | Dec 2011 | Dec 2023 | Solar |
RE Kammerer 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.7 GWh | Dec 2011 | Dec 2023 | Solar |
RE Dillard 1 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.5 GWh | Dec 2011 | Dec 2023 | Solar |
Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.1 GWh | Jul 2009 | Dec 2023 | Solar |
Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 24.6 GWh | Aug 2012 | Dec 2022 | Solar |
Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 26.6 GWh | Apr 2014 | Dec 2023 | Solar |
Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 24.8 GWh | Nov 2014 | Dec 2023 | Solar |
Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.2 GWh | May 2015 | Dec 2023 | Solar |
Otoe Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2013 | Dec 2023 | Solar |
SMUD at Lawrence | Sacramento PV Energy, LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.7 GWh | Nov 2011 | Dec 2023 | Solar |
North Palm Springs 1A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 5.3 GWh | Mar 2012 | Dec 2022 | Solar |
RE Dillard 3 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.5 GWh | Dec 2011 | Dec 2023 | Solar |
North Palm Springs 4A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 8.3 GWh | Sep 2012 | Dec 2023 | Solar |
CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 862.7 MWh | Nov 2001 | Dec 2023 | Solar |
Crafton Hills College Solar Farm | San Bernardino Comm College Dist | Yucaipa, CA | California Independent System Operator (CISO) | 97.8 MWh | May 2012 | Dec 2022 | Solar |
Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 512.5 GWh | Jun 2013 | Dec 2023 | Solar |
Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 2013 | Dec 2023 | Solar |
Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.1 GWh | Jul 2013 | Dec 2022 | Solar |
Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.3 GWh | Aug 2013 | Dec 2023 | Solar |
Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 2.2 GWh | Jun 2013 | Dec 2023 | Solar |
Aerojet II | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | May 2010 | Dec 2023 | Solar |
Aerojet I | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 6.1 GWh | Nov 2009 | Dec 2023 | Solar |
Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 1.2 TWh | Mar 2013 | Jun 2024 | Solar |
Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 571.1 MWh | Feb 2009 | Dec 2022 | Solar |
City of Madera WWTP | SunE GIL1, LLC | Madera, CA | California Independent System Operator (CISO) | 2.0 GWh | Aug 2009 | Sep 2023 | Solar |
Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.0 GWh | May 2013 | Dec 2022 | Solar |
Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 929.2 MWh | Mar 2012 | Dec 2023 | Solar |
Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2008 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2022 generation numbers.County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |