Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 17.4 MWh | Jun 2018 | Dec 2022 | Solar |
Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.8 GWh | Oct 2018 | Dec 2023 | Solar |
Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 148.6 GWh | Nov 2023 | Jun 2024 | Wind |
Canyon Crest Academy | SDGE Batteries | San Diego, CA | California Independent System Operator (CISO) | 60.8 MWh | Sep 2014 | Dec 2022 | Electricity used for energy storage |
Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 2.1 GWh | Dec 2013 | Dec 2023 | Solar |
Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.0 GWh | Nov 2017 | Dec 2023 | Solar |
Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.6 GWh | Nov 2017 | Dec 2023 | Solar |
Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.5 GWh | Nov 2017 | Dec 2023 | Solar |
Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 27.0 GWh | Nov 2016 | Dec 2023 | Solar |
Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 50.8 GWh | Nov 2017 | Dec 2022 | Solar |
Valley Center | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2016 | Dec 2023 | Solar |
NLP Granger | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 6.4 GWh | Aug 2016 | Dec 2023 | Solar |
Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 42.4 GWh | Mar 2017 | Dec 2023 | Solar |
E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.4 GWh | Nov 2013 | Dec 2023 | Solar |
North City - Landfill Gas Engine North | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 4.8 GWh | Oct 2013 | Dec 2022 | Landfill Gas |
Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 156.4 GWh | Nov 2016 | Jun 2024 | Solar |
Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 164.3 GWh | Nov 2016 | Jun 2024 | Solar |
Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 408.1 GWh | Nov 2019 | Jun 2024 | Wind |
San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 38.5 GWh | Sep 2018 | Dec 2023 | Solar |
Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 2.4 GWh | Jun 2020 | Jun 2024 | Natural Gas |
American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 354.6 GWh | Nov 2020 | Jun 2024 | Solar |
PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.9 GWh | May 2017 | Dec 2023 | Solar |
Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.5 GWh | Aug 2017 | Dec 2022 | Solar |
Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 7.4 GWh | Mar 2016 | Dec 2022 | Solar |
RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 451.8 GWh | Oct 2016 | Dec 2022 | Solar |
Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 18.5 GWh | Dec 2016 | Dec 2023 | Solar |
Silicon Valley Clean Water | Silicon Valley Clean Water | Redwood City, CA | California Independent System Operator (CISO) | 5.3 GWh | Feb 2015 | Dec 2023 | Other Biomass Gas : 94.8% Natural Gas : 5.2% |
Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 5.2 GWh | May 2016 | Dec 2023 | Solar |
Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2023 | Solar |
Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2016 | Dec 2022 | Solar |
Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.9 GWh | Jul 2016 | Dec 2023 | Solar |
Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 43.6 GWh | Jun 2016 | Dec 2023 | Solar |
SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2023 | Solar |
Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 40.3 GWh | Jan 2017 | Dec 2023 | Solar |
Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 18.1 GWh | Jan 2017 | Dec 2023 | Solar |
Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 284.7 GWh | Dec 2018 | Jun 2024 | Solar |
Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 12.2 GWh | Nov 2016 | Dec 2023 | Natural Gas |
RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 49.9 GWh | Aug 2016 | Dec 2023 | Solar |
Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 8.9 GWh | Sep 2016 | Dec 2023 | Solar |
RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 8.6 GWh | May 2016 | Dec 2023 | Solar |
CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2023 | Solar |
Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 37.6 GWh | Aug 2019 | Dec 2023 | Solar |
Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2017 | Dec 2023 | Solar |
AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.0 GWh | May 2016 | Dec 2023 | Natural Gas |
AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 9.3 GWh | Aug 2016 | Dec 2023 | Natural Gas |
Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 692.5 GWh | Oct 2018 | Jun 2024 | Solar |
Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 39.4 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Green Beanworks D PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 6.6 GWh | Jul 2018 | Dec 2023 | Solar |
Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 147.7 GWh | Oct 2017 | Jun 2024 | Wind |
USPS PV | USPS LA Solar FiT A & B | Los Angeles, CA | California Independent System Operator (CISO) | 13.1 GWh | Jun 2017 | Dec 2022 | Solar |
Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 259.6 GWh | Nov 2018 | Jun 2024 | Solar |
Bakersfield PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 7.1 GWh | Nov 2017 | Dec 2023 | Solar |
Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2018 | Dec 2023 | Solar |
Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 433.4 GWh | Dec 2019 | Jun 2024 | Solar |
One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2017 | Dec 2023 | Solar |
Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 7.6 GWh | Mar 2018 | Dec 2023 | Solar |
Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2017 | Dec 2023 | Solar |
Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2018 | Dec 2023 | Wind |
Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 6.2 GWh | Mar 2019 | Dec 2023 | Wind |
Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.7 GWh | Jul 2018 | Dec 2023 | Wind |
NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 51.6 GWh | Feb 2017 | Dec 2022 | Solar |
Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Apr 2019 | Dec 2022 | Solar |
Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 13.0 GWh | Apr 2017 | Dec 2023 | Solar |
Solar Star California, XLIV, LLC | MN8 Energy LLC | Pearblossom, CA | California Independent System Operator (CISO) | 25.5 GWh | Nov 2016 | Dec 2023 | Solar |
Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 366.3 MWh | Sep 2016 | Dec 2023 | Other Biomass Gas |
Jacumba Solar Farm | AEP Renewables | Jacumba, CA | California Independent System Operator (CISO) | 44.8 GWh | Jun 2017 | Dec 2023 | Solar |
Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 56.6 GWh | Feb 2017 | Dec 2022 | Solar |
CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2016 | Dec 2023 | Solar |
CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2016 | Dec 2023 | Solar |
Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 28.0 GWh | Feb 2018 | Dec 2023 | Solar |
Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.6 GWh | Jan 2017 | Dec 2023 | Solar |
Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 2.7 GWh | Mar 2017 | Dec 2023 | Solar |
SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 12.4 GWh | Sep 2017 | Dec 2023 | Solar |
Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 20.9 GWh | Nov 2017 | Dec 2023 | Solar |
Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2017 | Dec 2023 | Wind |
Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 4.2 GWh | Aug 2017 | Dec 2023 | Wind |
Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 517.1 MWh | Nov 2017 | Dec 2023 | Solar |
Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 1.1 GWh | Nov 2017 | Dec 2023 | Solar |
Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2020 | Dec 2022 | Solar |
Still Water Power | Still Water Power LLC | Hanford, CA | California Independent System Operator (CISO) | 752.1 MWh | Apr 2020 | Dec 2023 | Other Biomass Gas |
Fifth Standard Solar PV, LLC (Hybrid) | RWE Renewables Americas, LLC | Huron, CA | California Independent System Operator (CISO) | 241.9 GWh | Aug 2023 | Jun 2024 | Solar |
Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 12.3 GWh | Jul 2021 | Dec 2023 | Solar |
Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 12.4 GWh | Nov 2020 | Dec 2023 | Solar |
ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2021 | Dec 2023 | Solar |
SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 537.2 GWh | Nov 2021 | Jun 2024 | Solar |
Dissigno Healdsburg FPV, LLC | Palmetto Power Management LLC | Healdsburg, CA | California Independent System Operator (CISO) | 6.1 GWh | Nov 2020 | Dec 2023 | Solar |
Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 233.0 GWh | Feb 2021 | Jun 2024 | Wind |
Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 185.9 GWh | Jun 2021 | Jun 2024 | Wind |
Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 3.2 GWh | Feb 2018 | Dec 2023 | Solar |
Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 363.0 GWh | Nov 2021 | Jun 2024 | Solar |
EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 8.9 GWh | Jun 2021 | Dec 2022 | Solar |
EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2022 | Solar |
EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2021 | Dec 2022 | Solar |
EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 6.7 GWh | Apr 2022 | Dec 2022 | Solar |
CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2021 | Dec 2022 | Solar |
El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 3.3 GWh | Feb 2021 | Dec 2022 | Solar |
California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2021 | Dec 2022 | Solar |
EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2021 | Dec 2022 | Solar |
Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2023 | Solar |
Vallecitos Water District | SSA Solar of CA 5, LLC | San Marcos, CA | California Independent System Operator (CISO) | 3.5 GWh | Aug 2021 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2022 generation numbers.County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Glenn County, CA | # 55 | 2 | 8.3 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Madera County, CA | # 29 | 25 | 1.5 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Dec 2022 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
Kern County, CA | # 1 | 283 | 36.2 TWh |