HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 10.9 GWh | May 2019 | Dec 2023 | Solar |
Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 35.9 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 34.7 GWh | May 2021 | Dec 2023 | Solar |
Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.4 GWh | May 2021 | Dec 2023 | Solar |
American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.6 GWh | Aug 2019 | Dec 2023 | Solar |
Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 5.3 GWh | Sep 2017 | Dec 2023 | Solar |
Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2018 | Dec 2023 | Solar |
Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 38.2 GWh | Nov 2017 | Dec 2023 | Natural Gas |
North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2012 | Dec 2023 | Solar |
Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2020 | Dec 2023 | Solar |
Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 65.3 GWh | Mar 2020 | Aug 2024 | Solar |
Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 25.3 GWh | Aug 2019 | Dec 2023 | Natural Gas |
Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.0 GWh | Apr 2019 | Dec 2023 | Natural Gas |
ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 6.6 GWh | Nov 2019 | Dec 2023 | Natural Gas |
Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Feb 2019 | Dec 2023 | Natural Gas |
OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 348.0 MWh | - | Dec 2023 | Other Biomass Gas |
Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2020 | Dec 2023 | Solar |
Pleasanton - Amador Valley High School | Westbound Solar LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.5 GWh | Oct 2019 | Dec 2022 | Solar |
Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 15.9 GWh | Feb 2019 | Dec 2023 | Natural Gas |
California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2018 | Dec 2023 | Solar |
AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 6.3 GWh | Aug 2018 | Dec 2023 | Natural Gas |
CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 8.3 GWh | Dec 2018 | Dec 2023 | Natural Gas |
EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 16.5 GWh | Aug 2019 | Dec 2023 | Natural Gas |
EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 20.6 GWh | Aug 2018 | Dec 2023 | Natural Gas |
EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 29.2 GWh | Dec 2017 | Dec 2023 | Natural Gas |
JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2019 | Dec 2023 | Natural Gas |
KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 14.4 GWh | Mar 2018 | Dec 2023 | Natural Gas |
GEN005 Antibody Fuel Cell | 2016 ESA Project Company, LLC | Oceanside, CA | California Independent System Operator (CISO) | 16.3 GWh | Mar 2019 | Dec 2023 | Natural Gas |
SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 10.9 GWh | Nov 2018 | Dec 2023 | Natural Gas |
Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2023 | Solar : 99.3% Electricity used for energy storage : 0.7% |
Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2023 | Solar |
Medline Ind. Phase 2 Tracy | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.0 GWh | Mar 2018 | Dec 2023 | Solar |
Niagara Bottling Stockton | EnterSolar | Stockton, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2017 | Dec 2023 | Solar |
Phelan Pinon Hills CSD Solar | Phelan Pinon Hills Community Services District | Adelanto, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2015 | Nov 2023 | Solar |
Castaic Lake Phase II | MN8 Energy LLC | Santa Clara, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2014 | Dec 2023 | Solar |
IOS II-LAX9 | IOS II LLC | Fontana, CA | California Independent System Operator (CISO) | 7.5 GWh | Jan 2020 | Dec 2023 | Solar |
Sierra Pacific Industries (2042-RD) | Sierra Pacific Industries | Red Bluff, CA | California Independent System Operator (CISO) | 16.6 GWh | Apr 2020 | Dec 2023 | Solar |
DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 4.8 GWh | Jun 2020 | Dec 2023 | Solar |
DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2020 | Dec 2023 | Solar |
Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2020 | Dec 2023 | Solar |
Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 27.0 GWh | Nov 2020 | Dec 2023 | Solar |
Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2020 | Dec 2023 | Solar |
Central CA Fuel Cell 1 | Central CA Fuel Cell 1 | Tulare, CA | California Independent System Operator (CISO) | 18.0 GWh | Apr 2018 | Dec 2023 | Natural Gas |
RE-VFO LLC | RE-VFO LLC | Visalia, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2009 | Dec 2023 | Solar |
Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 236.8 GWh | Feb 2021 | Aug 2024 | Wind |
D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.1 GWh | Feb 2019 | Dec 2023 | Solar |
CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 272.3 GWh | Jun 2022 | Dec 2023 | Geothermal |
PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 2018 | Dec 2023 | Solar |
Walnut Unified School District Walnut HS Hybrid | Tesla Inc. | Walnut, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2020 | Dec 2023 | Solar |
Moonlight Packing - Phase 2 | CalCom Energy | Reedley, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2019 | Dec 2023 | Solar |
Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 636.0 MWh | Dec 2013 | Dec 2023 | Solar |
Navajo Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2023 | Solar |
Powhatan Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2013 | Dec 2023 | Solar |
Otoe Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2023 | Solar |
Westlands Solar PV Farm | Westlands Solar Farms, LLC | Huron, CA | California Independent System Operator (CISO) | 37.8 GWh | Jan 2014 | Dec 2023 | Solar |
Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 525.0 MWh | Jun 2007 | Dec 2023 | Natural Gas |
Santa Rita Jail Hybrid | County of Alameda GSA | Dublin, CA | California Independent System Operator (CISO) | 13.1 GWh | Aug 2001 | Dec 2023 | Natural Gas : 80.9% Solar : 19.1% |
Western Antelope Blue Sky Ranch A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 44.5 GWh | Oct 2014 | Dec 2023 | Solar |
Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 22.2 GWh | Nov 2016 | Dec 2023 | Solar |
Monterey Regional Water Pollution Control Agency | Tesla Inc. | Marina, CA | California Independent System Operator (CISO) | 1.1 GWh | Nov 2010 | Dec 2023 | Solar |
Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 957.0 MWh | Nov 2011 | Dec 2023 | Solar |
Industry Solar Power Generation Station 1 LLC | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2023 | Solar |
Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 618.5 GWh | Nov 2015 | Dec 2023 | Solar |
Mira Loma | Costco Wholesale | Mira Loma, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 2011 | Dec 2023 | Solar |
ABEC Bidart-Old River LLC | ABEC Bidart-Old River LLC | Bakersfield, CA | California Independent System Operator (CISO) | 16.0 GWh | Nov 2013 | Dec 2023 | Other Biomass Gas |
Lost Hills/Blackwell | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 77.1 GWh | Mar 2015 | Dec 2023 | Solar |
North Star Solar | Southern Power Co | Mendota, CA | California Independent System Operator (CISO) | 135.9 GWh | May 2015 | Dec 2023 | Solar |
Orion Solar I | Orion Solar I LLC | Arvin, CA | California Independent System Operator (CISO) | 28.9 GWh | Mar 2014 | Dec 2023 | Solar |
Orion Solar II | Orion Solar II, LLC | Arvin, CA | California Independent System Operator (CISO) | 18.3 GWh | May 2014 | Dec 2023 | Solar |
North Bay Solar 1 | AES Distributed Energy | Fairfield, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2013 | Dec 2023 | Solar |
Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 9.4 GWh | Oct 2014 | Dec 2023 | Solar |
Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Apr 2014 | Dec 2023 | Solar |
City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 10.3 GWh | Oct 2010 | Dec 2023 | Other Biomass Gas : 66.0% Solar : 30.5% Natural Gas : 3.5% |
RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 38.0 GWh | Dec 2013 | Dec 2023 | Solar |
RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 9.5 GWh | Nov 2013 | Dec 2023 | Solar |
RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 21.9 GWh | Dec 2013 | Dec 2023 | Solar |
Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 6.8 GWh | May 2012 | Dec 2023 | Solar |
Bear Creek Solar | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2014 | Dec 2023 | Solar |
Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 3.9 GWh | Mar 2014 | Dec 2023 | Solar |
Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.7 GWh | Mar 2014 | Dec 2023 | Solar |
Ironwood Solar LLC | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 8.2 GWh | Mar 2012 | Dec 2023 | Solar |
Desert Hot Springs Solar | Consolidated Edison Solutions Inc. | Desert Hot Springs, CA | California Independent System Operator (CISO) | 5.9 GWh | Nov 2013 | Dec 2023 | Solar |
Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 1.8 GWh | Sep 2011 | Jul 2023 | Solar |
Rodeo Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Apr 2014 | Dec 2023 | Solar |
Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 6.1 GWh | Nov 2014 | Dec 2023 | Solar |
Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 543.5 GWh | Oct 2013 | Dec 2023 | Solar |
Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2013 | Dec 2023 | Solar |
Oltmans SCE at Champagne | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2013 | Dec 2023 | Solar |
Oltmans SCE at Jurupa | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.7 GWh | Nov 2013 | Dec 2023 | Solar |
Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 9.3 GWh | Apr 2005 | Dec 2023 | Natural Gas : 75.4% Solar : 24.6% |
Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 53.0 GWh | Dec 2013 | Dec 2023 | Solar |
Solar Gen 2 Solar Facility | Southern Power Co | Calipatria, CA | California Independent System Operator (CISO) | 376.5 GWh | Oct 2014 | Dec 2023 | Solar |
One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 993.0 MWh | Nov 2003 | Dec 2023 | Natural Gas |
RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 34.2 GWh | Nov 2014 | Dec 2023 | Solar |
2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2023 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 14.2 GWh | Feb 2013 | Dec 2023 | Other Biomass Gas : 85.5% Natural Gas : 14.5% |
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2023 | Solar |
White River Solar 2 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 49.3 GWh | Aug 2014 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Madera County, CA | # 29 | 26 | 1.3 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.8 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
Kern County, CA | # 1 | 293 | 32.9 TWh |